In the event of failure on the part of a property owner to perform the required construction in accordance with the provisions of Section 917 within 30 days after receipt of a notice to provide such facilities, in order to permit completion of the service reconnection and the removal of the overhead wires and conductors by the Serving Company or Companies, the Director may order the disconnection and removal of any and all overhead electrical or other service wires or conductors supplying electrical or other service to such building or structure. In the event of such failure by the property owner to act, the Director-may, at his discretion, perform the work required of property owners by Section 917, and is authorized to use and employ whatever labor, materials and devices may be necessary to effectually carry out the provisions of this Article. The total cost of the labor, materials and devices necessary for the performance of such work shall be paid by the owner of the building or structure for which such work was required.
(Added by Ord. 139-72, App. 5/26/72; Ord. 140-07, File No. 070621, App. 6/22/2007)