The removal of overhead utility facilities shall be the responsibility of and be done by and at the cost of the owner or operator so owning, controlling, operating or using same. Before the underground installation of any utility facilities a permit for such installation shall first be secured pursuant to Section 901 hereof.
(Added by Ord. 139-72, App. 5/26/72)