(a) Daily Maintenance. The Permittee shall daily inspect, maintain, and repair all graded surfaces and erosion and sediment controls, drainage structures, and other protective devices, plantings, and ground cover installed while construction is active.
(b) Reporting. Every person who operates any erosion and sediment control or controls must provide inspection and maintenance information as set forth in the Construction Site Runoff Control Permit, and certify under penalty of perjury that such information is accurate and true.
(c) Inspections. Permittees shall permit the General Manager to perform inspections as may be deemed necessary in the General Manager's sole discretion to carry out the intent of this Article.
(d) Milestone Notification. The Permittee shall notify the General Manager at least two working days before the following milestones occur:
(1) Start of construction.
(2) Erosion and sediment control measures are completely installed and stabilized.
(3) Final grading has been completed.
(4) Project completion.
(e) Authority to Sample and Establish Sampling Devices. Permittees shall provide devices or locations necessary to conduct sampling or metering operations, if requested by the General Manager.
(f) Requirement to Test or Monitor. Permittees shall undertake such monitoring activities or analysis and furnish such reports as the General Manager may specify, if requested by the General Manager.
(g) Notification of Spills. All Persons responsible for implementing BMPs shall provide immediate notification to the General Manager of any suspected, confirmed or unconfirmed release of Pollutants that creates a risk of non-stormwater discharge into any of the City's sewer systems. Such persons shall take all necessary steps to ensure the detection and containment and cleanup of such release.
(h) Public Right-of-Ways. The Permittee shall be responsible for the prompt removal of, and the correction of damage resulting from any soil, miscellaneous debris or other materials washed, spilled, tracked dumped or otherwise deposited on public streets, highways, sidewalks or other public thoroughfare, incident to the construction activity, or during transit to and from the construction site.