Should the monthly cost and expense of such engineering inspection be less than the amount deposited then the surplus or excess existing in the amount deposited over the total actual cost of such engineering inspection shall be credited on account of such continued inspection as may be required or when the work has been completed be refunded to the person, firm or corporation by whom such funds were originally deposited.