LIST OF FIGURES
ES-1 Undeveloped or Under Developed Land
ES-2 Figure ES-2 ERC Projections
ES-3 Buildout Water System
ES-4 10-Year Expenditures
2-1 Service Area
2-2 Residential Population
2-3 Undeveloped or Under Developed Land
2-4 ERC Projections
2-5 Annual Water Production Demand Projections
2-6 Peak Day Production Demand Projections
3-1 Annual Water Supply Requirements
3-2 Peak Day Water Supply
5-1 Existing Water System
5-2 Water System Schematic
7-1 Existing Water System Minimum Pressures
7-2 Existing Water System Max Velocities
7-3 Existing Water System Available Fire Flow at 20 psi
8-1a Buildout Water System Capital Projects
8-1b Buildout Water System Developer Projects
8-2 Buildout Zone Boundaries
8-3 Buildout Water System Peak Day Minimum Pressures
9-1 Dixie Valley Focus Area
10-1 10-year Expenditures