Skip to code content (skip section selection)
Compare to:
West Jordan Overview
West Jordan, UT Code of Ordinances
West Jordan General Plan
West Jordan Midvale 3 Stations Plan
West Jordan Parks and Recreation Master Plan
West Jordan Sanitary Sewer Master Plan
West Jordan Storm Drainage Master Plan
West Jordan Active Transportation Plan
West Jordan Transportation Master Plan
West Jordan Water Master Plan
8.2   SUMMARY OF BUILDOUT SYSTEM PERFORMANCE
With the proposed improvements in place, the hydraulic model can give us an indication of how the system will perform at buildout. Figure 8-3 shows the minimum pressures at buildout during the peak hour of a peak day. While there are still a few isolated areas that are slightly below the City standard of 50 psi, pressures in the system are generally excellent. Improvements were considered for those few areas below 50 psi. However, significant investment would be required to only marginally improve these areas, so they have been determined to be acceptable at this time.
Figure 8-3