During the analysis of the water system, it was noted that there are a few areas of the City that have pressures outside the normal desirable range. To address these issues, a few changes to pressure zone boundaries are proposed. The details of these changes are noted in the existing and buildout improvement sections above. For reference, Figure 8-2 shows the existing zone boundaries with a black dashed line and the proposed buildout boundaries in colored polygons. The Zone 3-4 and Zone 5-6 boundary changes are relatively small areas, while the Zone 1-2 change is larger. By bringing areas from lower zones to higher ones, pressures are significantly increased. Prior to any zone changes, service line PRVs should be verified to be in working order.