Figure 8-1a and 8-1b show the pipe improvements recommended for the distribution system. The projects are divided into City or system level capital projects (Figure 8-1a), and developer projects (Figure 8-1b). The developer projects include new pipes necessary to serve new growth for developing areas. It is worth noting that the location for developer projects are schematic and it is anticipated that the alignments will change to match frontage roads or road alignments as areas develop.
The capital projects are projects that are necessary to meet the City requirements and expand capacity of the system These projects are detailed in the following sections.


The previous chapter described deficiencies in the system based on existing conditions. Improvements that address those deficiencies are described in Table 8-1. Included in the table are project numbers from the 2016 Master Plan to allow for easy comparison between plans.
ID | Previous ID | Problem | Proposed Solution |
ID | Previous ID | Problem | Proposed Solution |
DP-1 | D-11 | Increase transmission capacity from pump station and complete pipeline in north side of 7800 South | Install 1,590 feet of 8-inch pipeline in 7800 South between 5360 West and 5100 West, 355 feet of 12-inch pipe between 5100 West and 5060 West, 1,175 feet of 16-inch pipe between 5060 West and 4880 West, and 480 feet of 12-inch pipe between 4880 West and 4800 West, and 70 feet of 16-inch pipe across 7800 South at 5060 West |
DP-2 | D-12 | High water user does not have service redundancy | Install 1,530 feet of 10-inch pipe in the business access road beginning at about 4980 West Old Bingham Highway and from that point north to about 9295 South then west to Winter Berry Drive, then north in Winter Berry Drive to connect to the existing 12-inch pipeline in Wild Acres Drive. |
DP-3 | D-18 | Zone 2a Transmission | Install 7,900 feet of 12-inch pipeline in 2700 West between 6600 South and 7800 South |
DP-4 | D-19 | Low pressures in Zone 3 | Pressure Zone 3 & 4 boundary relocation including the installation of 4,605 feet of 8-inch pipe beginning at 4900 West 9000 South and proceeding north to 8900 South 4910 West and in McGinnis Lane between 4910 West and New Bingham Highway. |
DP-6 | D-24 | Separate Pressure Zones 3 and 4 | Install 1,900 feet of 10-inch pipe in Swift Water Way between Grizzly Way and 7800 South |
DP-7 | D-27 | The City prefers to have transmission pipelines on both sides of 5 lane roads | Install 7,900 feet 12-inch pipe in 7000 South between 2700 West and 1300 West |
PZ-1 | D-17 | Low pressures in Zone 1 | Pressure Zone 1 west of 2700 West should be segregated to form a new Zone 2a and 2b pressure zones. Service line PRVs need to be checked prior to change over as pressures will increase significantly. |
PZ-2 | D-20 | Low pressures in Zone 5 | Move phase 3 of the Maples at Jordan Hills Subdivision to Zone 6 |
PRV-1 | D-22 | New PRV needed in 9000 South | Install a new 12-inch PRV at about 6730 West 9000 South |
Table 8-2 outlines projects needed to eliminate existing fire flow deficiencies.
ID | Previous ID | Problem | Proposed Solution |
ID | Previous ID | Problem | Proposed Solution |
FF-1 | F-1 | Insufficient fire flow at West Jordan Elementary School | Install 690 feet of 10-inch pipe in 2370 West between 7350 South and 7200 South |
FF-2 | F-2 | Inadequate fire flow to residential area | Install 570 feet of 8-inch pipe in 9240 South between 3000 West and 3090 West, 400 feet of 8-inch pipe in 3090 West between 9240 South and 9300 South, and 400 feet of 8-inch pipe in 3040 West between 9240 South and 9300 South |
FF-3 | F-4 | Inadequate fire flow to residential area | Install 1,535 feet of 8-inch pipe in Drake Lane between Redwood Road and 1825 West and then north to Executive Drive |
FF-4 | - | Inadequate fire flow to residential area | Install 430 feet of 8-inch pipeline in Mcgregor lane, from Dunlop Drive to the end of the cul-de-sac |
FF-5 | - | Inadequate fire flow to residential area | Install 600 feet of 8-inch pipeline in 2940 West, from Wood Cove Drive north to the end of the cul-de-sac |
FF-6 | - | Inadequate fire flow to residential area | Install 1,900 feet of 8-inch pipeline in Beverly Glen Avenue, from 2700 West to 2470 West, continuing south on 2470 West to the end of the cul-de-sac |
FF-7 | - | Inadequate fire flow to residential area | Install 925 feet of 10-inch pipeline in 2980 West from 7000 South to 7140 South |