ADMINISTRATIVE FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Budget | $ 25.00 | |
Building Code | 10.00 | Title 9, chapters 1 through 9 |
Comprehensive Plan | 25.00 | |
Documents and records: | 1-10-2 | |
Deposit for microfilm records | 150.00 per week | |
For all documents or records copied in response to an FOIA request: | Ord. 2010-1; 5 ILCS 140/1 et seq. | |
8.5" x 11" or 8.5" x 14" (black and white), first 50 pages | No charge | |
8.5" x 11" or 8.5" x 14" (black and white), each page after first 50 pages | $0.15 per side | |
11" x 17" (black and white) | 0.50 per page | |
8.5" x 11", 8.5" x 14", or 11" x 17" (color) | Costs incurred | |
Certification of documents/records | $1.00 per document (plus copying cost) | |
Electronic records: | ||
Nonvoluminous requests | Cost incurred | |
Voluminous requests (PDF format) | $20.00 for up to 80 megabytes of data, $40.00 for more than 80 but not more than 160 megabytes of data, $100.00 for more than 160 megabytes of data | |
Voluminous requests (non-PDF format) | $20.00 for up to 2 megabytes of data, $40.00 for more than 2 but not more than 4 megabytes of data, $100.00 for more than 4 megabytes of data | |
Use of an outside vendor to produce requested documents | Cost incurred | |
Fine for FOIA violations | $750.00 for each violation | |
For records requested by a commercial requestor, time in excess of 8 hours spent to search for, examine for redactions, or retrieve requested records | $10.00/hour | |
Land use maps | 5.00 | |
Sign regulations | 10.00 | Title 10, chapter 10 |
Subdivision title | 25.00 | Title 11 |
Tree regulations | 10.00 | Title 10, chapter 11 |
Zoning title | 25.00 | Title 10 |
ALARM FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Annual registration: | ||
Within the Village limits | $ 25.00 | |
Outside the Village limits | Set by contract | |
Directly monitored alarm fees: | ||
Initial connection fee | 125.00 | |
Onetime relay deposit fee | 150.00 | |
Single-family residence within the Village limits | 50.00 | |
Other property within the Village limits | 75.00 | |
All property outside the Village limits | Set by contract | |
False fire/burglar alarm fees: | ||
1 to 4 false alarms | No charge | |
5th false alarm | $ 50.00 | |
6th, 7th , 8th false alarm | 100.00 | |
9th false alarm | 150.00 | |
10th false alarm or more | 250.00 | |
CONSTRUCTION/BUILDING FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Construction permit1, unless otherwise listed | $30.00 per $1,000.00 of construction cost | Title 9, chapter 1 |
Building permit fee reduction for installation of electric vehicle chargers | 100% reduction of the portion of the building permit fee attributable to the vehicle charger installation | |
Building permit fee rebate for qualifying sustainable building projects | Rebate of 25% of total building permit fee | |
Building permit, restoration (renewal for expired permit) | $100.00 per month for interior only building activity, $200.00 per month for all other building/site activity | |
Plumbing permit | $25.00 application fee, plus $10.00 per $1,000.00 of construction cost | Title 9, chapter 1 |
Electric permit | $25.00 application fee, plus $10.00 per $1,000.00 of construction cost | Title 9, chapter 2 |
Heating and air conditioning | $25.00 application fee, plus $10.00 per $1,000.00 of construction cost | Title 9, chapter 1 |
Replacement siding, exterior doors, and windows permit | $50.00 application fee, plus $10.00 per $1,000.00 of construction cost | Title 9, chapter 2 |
Building permit fee waiver for properties on which a Protected or Certified Feature is located pursuant to the Village's Historic Preservation Regulations2 | Waiver of 100% of total building permit fee (full waiver) | 9-14-10(K) |
Elevator plan review and inspection | Village cost | Title 9, chapter 2 |
Residential fire sprinkler plan review and inspection | $150.00 | Title 9, chapter 1 |
Fence installation: | ||
New fence | 50.00 | |
Replacement fence | 25.00 | |
New or replacement patio, sidewalk, driveway, private roadway, and parking lot permit | $25.00 application fee, plus $10.00 per $1,000.00 of construction cost, $50.00 minimum | 7-1-12E1, E2 |
Demolition Tax for principal residential structures | $10,000.00 | |
Demolition Tax where the principal residential structure is a Protected Feature pursuant to the Village’s Historic Preservation Regulations | 12,500.00 | |
Demolition Tax where the principal residential structure is a Certified Feature pursuant to the Village’s Historic Preservation Regulations | 15,000.00 | |
Demolition permit: | $25.00 application fee, plus unit fees as provided below | |
Principal structures: | ||
Up to and including 500 square feet3 | $1.00 per square foot | |
501 square feet through 2,500 square feet | $1.00 per square foot for the first 500 square feet, plus $2.00 for each square foot from 501 through 2,500 | |
2,501 square feet and above | $1.00 per square foot for the first 500 square feet, plus $2.00 for each square foot from 501 through 2,500, plus $0.50 for each square foot from 2,501 and above | |
Accessory structures: | ||
150 square feet through 500 square feet | $0.50 per square foot | |
501 square feet through 1,000 square feet | $0.50 per square foot from 150 through 500, plus $1.00 for each square foot from 501 through 1,000 | |
1,001 square feet and above | $0.50 per square foot from 150 to 500, plus $1.00 for each square foot from 501 through 1,000, plus $0.25 for each square foot from 1,001 and above | |
Roofing permit | $25.00 application fee, plus $10.00 per $1,000.00 of construction cost, $50.00 minimum fee | Title 9, chapter 2 |
Reinspections | $150.00 | Title 9, chapter 1 |
Occupancy certificate | 250.00 | 10-2-3B3 |
Copy of original certificate | 1.00 | 10-2-3B4 |
Building Department plan review (only applies when plans are reviewed and no permit is issued) | 200.00 | Title 9, chapter 2 |
Plan review deposit | $200.00 for plans that are $20,000.00 or more in construction value and $100.00 for plans under $20,000.00 in construction value | Title 9, chapter 2 |
Fire Department plan review (multi-family and commercial only) | $ 50.00 | Title 9, chapter 2 |
Septic system permit | 2,500.00 | 8-2-1B2 |
Street opening permit | 550.00 | |
Street tunneling permit | 100.00 | |
Sidewalk opening permit | 110.00 | |
Small wireless facilities (SWFs) | $650.00 for application for single SWF $350.00 for each SWF in application for multiple SWFs $1,000.00 for each SWF that includes new utility pole $200.00 annual fee for each SWF on Village utility pole within right-of-way $3,600.00 for application for SWF on Village utility pole not located within right-of- way | |
Swimming pool installation permit | $330.00 | Title 9, chapter 1 |
Aboveground pool/spa | 330.00 | Title 9, chapter 1 |
Inground pool/spa (no structures or enclosures) | 350.00 | Title 9, chapter 1 |
Pools and spas (which include structures) | $30.00 for each $1,000.00 of construction value (minimum of $400.00) | Title 9, chapter 1 |
Moving license | $5,000.00 | |
Lawn irrigation system installation permit | 330.00 | Title 9, chapter 1 |
Water tap permit | 25.00 | 8-1A-2A2 |
Water taps | 100.00 | 8-1A-2A2 |
Water meter and accessories | Costs incurred, plus 10% | |
Satellite/antenna dish review | $25.00 | |
Special inspections (i.e., Veterans' Affairs, FHA) | $125.00 per inspection | Title 9, chapter 1 |
Security systems | $25.00 per permit and $10.00 per $1,000.00 of construction value for an electrical permit (minimum of $50.00) | Title 9, chapter 1 |
New construction and/or large scale renovation 15,000 or more square feet, life safety review | $0.005 per square foot (minimum of $250.00) | Title 9, chapter 1 |
Small scale tenant finish or renovation less than 15,000 square feet, life safety review | $150.00 | Title 9, chapter 1 |
Automatic fire extinguishing systems, NFPA 13 or 13R | $100.00 plus $3.00 per sprinkler head (minimum of $200.00) | Title 9, chapter 1 |
Automatic fire extinguishing systems, combination preaction/clean agent | $450.00 | Title 9, chapter 1 |
Automatic fire extinguishing systems, other fire suppression systems (wet chemical, etc.) | 250.00 | Title 9, chapter 1 |
Standpipe systems | 200.00 | Title 9, chapter 1 |
Fire pumps and related equipment | 200.00 | Title 9, chapter 1 |
Compressed gases, system installations | 100.00 | Title 9, chapter 1 |
Flammable and combustible liquids tank installation and/or process installation | 100.00 | Title 9, chapter 1 |
Hazardous materials uses | 100.00 | Title 9, chapter 1 |
LP gas installations | 100.00 | Title 9, chapter 1 |
Private fire hydrants review | 100.00 | Title 9, chapter 1 |
Fire alarm systems and related equipment | $5.00 per device (minimum of $100.00) | Title 9, chapter 1 |
Fire alarm panel replacement | $250.00 | Title 9, chapter 1 |
Small scale tenant fire alarm renovation | 100.00 | Title 9, chapter 1 |
Tents and air supported structures | 25.00 | Title 9, chapter 1 |
DEVELOPMENT FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Preannexation, per filing | $500.00 per acre or fraction thereof (plus additional costs incurred by the Village)4 | |
Annexation of territory | $1,000.00 per acre or fraction thereof (plus additional costs incurred by the Village)5 | |
Appeals to administrative decisions/rebuttals to board and commission recommendations | $100.00 | |
Architectural Board of Review: | ||
Minor improvements to existing sites/structures or concept review | $100.00, plus additional costs incurred | |
Major improvements, per structure or type of structure | $300.00, plus additional costs incurred | |
Sign review, per sign | $150.00, plus additional costs incurred | |
Site plan approval application | $300.00, plus an amount determined by the Village Administrator to reimburse the Village for all anticipated out of pocket expenses incurred in connection with the delivery of notice pursuant to section 10-2-8 of this Code | |
Special development fees applicable to property within the RIO Zoning District: | ||
RIO Development Plan review | $0.00, plus additional costs incurred by the Village | |
Architectural Board of Review applications, including sign reviews and site plan reviews | $0.00, plus additional costs incurred by the Village | |
Subdivisions and planned developments: | ||
Filing fee for preliminary plat of subdivision application, no Plan Commission review | $250.00 per subdivision | |
Filing fee for preliminary plat of subdivision application, with Plan Commission review | $250.00 per subdivision | |
Tentative and final plat of subdivision (prior to recording by Village), including subdivisions submitted to the Village Board of Trustees | $1,000.00 (plus additional costs incurred by the Village)6 | |
Application filing fee for planned development | $150.00 per acre or fraction thereof | 10-5J-4B1 |
Planned development | $2,000.00 (plus additional costs incurred by the Village)6 | Title 10, chapter 5, article J |
Tentative and final plat for planned development (prior to recording by the Village) | $1,000.00 (plus additional costs incurred by Village)6 | 10-5J-4B1 |
Tree permit application review (see Permit Fees of this section for tree permit fees): | ||
1. Development of a vacant lot | $450.00 | |
2. Structure demolitions | 525.00 | |
3. Room additions | 275.00 | |
4. Driveway installations | 150.00 | |
5. Installations (pools, tennis courts, sport courts) | 195.00 | |
6. Fence and shed installations | 125.00 | |
7. Deck and patio installations | 140.00 | |
8. Irrigation system installations | 125.00 | |
Tree replacement mitigation fee | $150.00 per each 1 inch caliper of replacement trees that are not being planted on the subject property at the full replacement rate that would otherwise be applicable | 10-11-7G2 |
Watershed development regulations review7,8: | ||
1. Sediment and erosion control only: | ||
a. Single-family home/ development under 5 acres | $ 150.00 | |
b. Single-family home/ development under 5 acres with floodplain or wetlands | 200.00 | |
c. Development 5 acres or more | 350.00 | |
2. Minor development without detention | 700.00 | |
3. Minor development with detention | 1,400.00 | |
4. Major development (stream bank/shoreline stabilization) | 300.00 | |
5. Major development (detention, no floodplain) | 1,950.00 | |
6. Major development (grading in floodplain, no detention) | 400.00 | |
7. Major development (with floodplain under 100 acres tributary) | 2,700.00 | |
8. Major development (with floodplain 100 to 200 acres tributary) | 4,350.00 | |
9. Major development (with floodplain over 200 acres tributary) | 5,500.00 | |
10. Floodplain/floodway accessory structure review | 100.00 | |
11. Public road development (detention and floodplain modeling) | 1,550.00 | |
12. Public road development (with detention and/or floodplain impact) | 1,050.00 | |
13. Public road development (no detention) | 600.00 | |
14. Wetland, jurisdictional determination | 350.00 | |
15. Wetland, no impact determination | 300.00 | |
16. Wetland Category I permit (single-family) | 150.00 | |
17. Wetland Category I permit (nonsingle-family) | 900.00 | |
18. Wetland Category II permit | 1,250.00 | |
19. Wetland Category III permit | 1,300.00 | |
20. Wetland Category IV permit (less than 1 acre) | 500.00 | |
21. Wetland Category IV permit (greater than or equal to 1 acre) | 1,000.00 | |
22. Resubmittals | 1/3 of base fee | |
23. FEMA map revisions | $1,250.00 | |
Zoning Board of Appeals: | ||
Appeal of interpretation of zoning regulations pursuant to State Statutes | 150.00 | |
Variations: | ||
Requiring only Zoning Board of Appeals approval, per filing | $500.00, plus additional costs incurred by the Village | |
Requiring Village Board approval, per filing | $750.00, plus additional costs incurred by the Village | |
Text or map amendments to the zoning regulations, per filing | $750.00, plus additional costs incurred by the Village | |
Special use permit: | ||
Up to 1 acre | $750.00, plus additional costs incurred by the Village | |
Per acre or fraction thereof over 1 acre | $10.00 per acre | |
Developer donation impact fees: The following variables shall be used to determine developer donations for school, park, library, and Village purposes in accordance with the method of calculation and provisions outlined in title 11 of this Code, particularly title 11, chapter 4 of this Code: | ||
Lake Bluff Park District multiplier | 7.3 acres per 1,000 residents | |
School District 115 multiplier | 50 acres per 1,500 students | |
School District 65 multipliers | 15 acres per 600 K - 5 students 30 acres per 900 6 - 8 students | |
Municipal (Village) | 9.7 acres per 1,000 residents | |
Library (Village) | 0.05 acre per 1,000 residents | |
Value of vacant land for "cash in lieu of" donation | $583,200.00 per acre | |
Reduced application fee for zoning relief concerning an accessory dwelling unit that is accessory to one single-family residence
| $375.00, plus additional costs incurred by the Village
| |
LICENSE FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Accessory Animal Licenses | ||
New license (non-refundable application fee) | $100.00 | |
Renewal of license (non- refundable application fee) | $0.00 | |
Business occupancy certificate fee | $ 100.00 | |
Business license transfer fee | 10.00 | |
Contractor's license fee; fees for all contractor licenses that are issued on or after November 1 shall be prorated on a semiannual basis | 100.00 | 9-2-3 (105.8) |
Liquor licenses: | ||
Initial application fee (does not apply to applications for Class L or W event licenses, or applications for Class AA or AB licenses that receive fee waivers) | 250.00 | |
Annual license fees; fees for all liquor licenses, except Class L and W events, that are issued on or after November 1 shall be prorated on a semiannual basis: | ||
Class A | 2,500.00 | |
Class B | 940.00 | |
Class C | 2,500.00 | |
Class D | 2,500.00 | |
Class L | 30.00 per event | |
Class P-1 | No charge | |
Class P-2 | $1,250.00 | |
Class R | 1,250.00 | |
Class S | 1,250.00 | |
Class T | 1,250.00 | |
Class U | 2,750.00 | |
Class V | 2,750.00 | |
Class W annual license | 500.00 | |
Class W event license | 50.00 | |
Class X | 500.00 | |
Class Y | 1,000.00 | |
Class Z | 275.00 | |
Class AA | $250.00, provided that this charge will be waived for holders of an existing Village liquor license | |
Class AB | $250.00, provided that this charge will be waived for Village businesses holding any State liquor license | |
Class AC | $3,250.00 | |
Class AD | $500.00 | |
Food license, restaurant/food store | $100.00 | |
Food and beverage delivery service | $100.00 per vehicle | 3-7B-1C1 |
Milk and milk products sales, delivery and distribution: | 3-7C-2B3 | |
Engaging in business of delivery or distribution of milk | $50.00 per vehicle | |
Retail businesses where milk is sold, except where a food dealer's license has been issued | $ 50.00 | |
Each milk vending machine | 25.00 | |
Junk dealer | 25.00 | |
Gasoline station | 100.00 | |
Massage establishments | 100.00 | Title 3, chapter 13 |
Motor vehicle: | 40.00 | |
Owner 65 or over | 15.00 | |
Electric vehicles bearing an Illinois “EL” license plate until May 1, 2025 | $0.00; eligible vehicles still are required to register with the Village annually | |
College or graduate student with a vehicle away from home | 50% fee reduction | 6-2-3(D) |
Trucks | 55.00 | |
Motorcycles, motorized bicycles, motorized tricycles and other motorized vehicles | 25.00 | |
Motor vehicle, truck or motorcycle late fee penalty | 50% of license fee | |
Vehicle license - transfer to new vehicle, same owner | No charge | |
Vehicle license fine | $50.00 | |
Raffle license | 25.00 | |
Peddler or solicitor | $100.00 per person | |
Scavenger | ||
Residential franchise | $0.00 | 3-4-3(A) |
Commercial franchise | $0.00 | 3-4-3((B) |
Exempt service | $750.00 | 3-4-3((C) |
Taxicab service | $ 25.00 | |
Livery service | 250.00 | |
Fingerprinting fees: | ||
Village resident | Free | |
Nonvillage resident | $100.00 | |
Short-term rental annual registration fee | 250.00 | |
PERMIT FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Commercial filming and videotaping: | ||
Permit application | $1,000.00 | 3-10-3A1 |
Disruptive use of Village property | 2,000.00 per day | 3-10-3F1 |
Nondisruptive use of Village property | 1,000.00 per day | 3-10-3F1 |
Total closure of public street right-of-way | 200.00 per hour | 3-10-3F1 |
Partial closure of public street right-of-way | 100.00 per hour | 3-10-3F1 |
Parking permit: | ||
Mawman Avenue Parking Lot: Daytime | 125.00 per year | 6-4-4(B)(1) |
Mawman Avenue Parking Lot: Overnight | 360.00 per year | 6-4-4(B)(2) |
Train Station Parking Lot: Daytime | 360.00 per year 3.00 per day | 6-4-3(B)(1) |
Train Station Parking Lot: Overnight | 360.00 per year 5.00 per day | 6-4-3(B)(2) |
Train Station Parking Lot: Central Business District Merchant | 150.00 per year | 6-4-3(B)(3) |
Transfer to new vehicle, same owner | No charge | 6-4-5(B)(4) |
Parking convenience fee (for daily fee payment by any means except at pay kiosk) | $0.37 per transaction | |
Tree permit (see Development Fees of this section for tree permit application review fees): | $50.00 | |
Application | 50.00 | |
TAXES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Automobile Rental Use Tax | 1% | |
Automobile Renting Occupation Tax | 1% | |
Cable and video service: | ||
PEG access support fee | 1% of holder's gross revenues or, if greater, the percentage of gross revenues that incumbent cable operators pay to the Village or its designee for PEG access support in the Village | |
Provider fee | 5% of holder's gross revenues | |
Electric Utility Tax, calculated on a monthly basis for each purchaser: | ||
Kilowatt Hours Used Or Consumed In A Month | Cents Per Kilowatt Hour
| |
First 2,000 Next 48,000 Next 50,000 Next 400,000 Next 500,000 Next 2,000,000 Next 2,000,000 Next 5,000,000 Next 10,000,000 Excess of 20,000,000 | $0.553 0.416 0.323 0.315 0.300 0.280 0.260 0.240 0.220 0.200 | |
Emergency Disaster Services Agency Tax | Not to exceed $0.05 per $100.00 of the full, fair cash value as equalized by the Department of Revenue of the State of Illinois on all taxable property in the Village. However, that amount collectible under such levy shall in no event exceed $0.25 per capita | |
Foreign fire insurance companies | 2% of gross receipts | |
Home Rule Food and Alcoholic Beverage Tax | 1% of the purchase price | |
Home Rule Hotel Tax | 7% of gross revenues | |
Home Rule Municipal Retailers' Occupation Tax | 1% of gross receipts | |
Home Rule Municipal Service Occupation Tax | 1% of selling price | |
Home Rule Municipal Use Tax | 1% of selling price | |
Public Benefit Tax | 0.05% of the full fair cash value as equalized or assessed by the State Department of Revenue | |
Simplified Municipal Telecommunications Tax | 5% of gross receipts | |
Utility Tax | 5% of gross receipts | |
USER CHARGES AND CONNECTION FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Water meter reading fee: | $20.00 per reading | |
Water rate: | ||
Within the Village | $7.99 per 1,000 gallons of water usage | |
Outside the Village | $9.18 per 1,000 gallons of water usage | |
Water service, account maintenance fee: | ||
1" or less meter size | $10.00 per quarter | |
1.5" meter | $15.00 per quarter | |
2" meter | $25.00 per quarter | |
3" meter | $50.00 per quarter | |
4" meter | $75.00 per quarter | |
5" meter | $100.00 per quarter | |
6" or greater meter | $200.00 per quarter | |
Water system recapture connection fee: | ||
Within the Village: | ||
Per residential dwelling unit | $400.00 per 1/8 inch of tap size | |
New commercial construction | $0.73 per square foot | |
New tax exempt institutional construction | $0.67 per square foot | |
Water system tap size increase9 | $400.00 per 1/8 inch of tap size | |
Outside the Village | $600.00 per 1/8 inch of tap size | |
Turning water on and off | $25.00 | |
Reinstating water to a plugged pipe | 10.00 | |
Delinquent payment fee | 1.5% of the outstanding balance | |
Use of water by construction contractors | $10.00 for meter rental, plus charge for use of the water | |
Cross connection control violations; fee to reconnect water service | $100.00 | |
Sanitary sewer rate: | ||
Within the Village | $1.10 per 1,000 gallons of water usage | |
Outside the Village | $1.21 per 1,000 gallons of water usage | |
Sanitary sewer service, account maintenance fee | $0.00 per quarter | |
Sanitary sewer system recapture connection fee: | ||
Within the Village | $1,000.00 | |
Outside the Village | 2,000.00 | |
Storm sewer system recapture connection fee:10 | ||
Within the Village | 750.00 | |
Outside the Village | 1,000.00 | |
Stormwater Utility Fee Rate: | 8-1B-1 | |
Within the Village | $195.00 per Equivalent Runoff Unit (ERU) | |
Stormwater management incentives: | ||
Rain Garden | 250.00 | |
Runoff Rate Reduction | 250.00 | |
Runoff Volume Reduction | 250.00 | |
Runoff Water Quality | 250.00 | |
Rain barrel | 25.00 | |
AMBULANCE TRANSPORT FEES
Description | Amount | Municipal Code Provision |
Description | Amount | Municipal Code Provision |
Transport Fee: | ||
Resident and nonresident | $1,732.00 | |
Treatment but No Transport Fee: | ||
Treatment Fee Resident and non resident | $250.00 | |
Lift Assist Fee (within any given 12 month period): | ||
Resident and nonresident 1st Call for Lift Assist | $100.00 | |
Resident and nonresident 2nd Call for Lift Assist | $150.00 | |
Resident and nonresident 3rd Call and Thereafter for Lift Assist | $300.00 | |
Mileage Fee (charged in conjunction with all Transports): | $7.27/mile | |
WASTE DISPOSAL CHARGES
Description | Amount | Municipal Code Provision |
Residential Waste Disposal Services (residential properties with three or fewer dwelling units) | Basic service at no cost to resident; Optional services billed directly by franchisee at rates pursuant to franchise agreement. | 3-4-3(A) |
Commercial Waste Disposal Services (all properties not eligible for Residential Services) | All services billed directly by franchisee at rates pursuant to franchise agreement. | 3-4-3(B) |
Notes:
1. Includes the construction of Municipal utilities, including stormwater detention facilities, and the construction of private/public roadways and all new parking lots associated with new construction.
2. The historic preservation fee waiver applies to all fees listed under the "Construction/Building Fees" heading and authorized pursuant to any provision of Title 9 ("Building Regulations"); provided, however, that the waiver does not apply to fees for: (i) renewals of expired permits; (ii) demolition permits; (iii) re-inspections; (iv) occupancy certificates and copies thereof; and (v) plan reviews where no permits are issued. See Section 9-14-10(K) for rules of applicability.
3. For purposes of determining square footage for demolition permit fees, only the square footage of floor area at or above grade shall be counted.
4. "Costs" for preannexation include all legal, engineering, and other consulting and administrative fees, costs, and expenses that are incurred in connection with review and processing of the preannexation.
5. "Costs" for annexation include all legal, engineering, and other consulting and administrative fees, costs, and expenses that are incurred in connection with review and processing of the annexation.
6. "Costs" for subdivisions and planned developments include all legal, engineering, and other consulting and administrative fees, costs, and expenses that are incurred in connection with review and processing of the subdivision or planned development, including construction observation services related to all infrastructure construction associated with a development. An escrow and a maintenance guarantee are also required and shall be maintained to cover costs incurred as a result of a development.
7. When consulting fees are incurred by the Village for the processing of watershed development permits, the applicant shall pay the Village for the cost incurred for utilizing the consultant in lieu of applicable fee(s) listed herein.
8. "Major development", "minor development", and the permit categories used in this section shall have the meanings ascribed to them in the Village Watershed Development Ordinance. (See section 12-1-1 of this Code.)
9. The fee for a water tap size increase shall be waived where the increased tap size is necessary for an existing building to provide automatic fire sprinklers as required by Section 9-2-3, subsection 903.2 (for work subject to the International Building Code) and Section 9-3-3, subsection R313.2.1 (for work subject to the International Residential Code).
10. The Building Commissioner may, in his sole and absolute discretion, waive the storm sewer recapture fee when the work (i) is necessary to cure existing drainage problems on the subject property or other properties; and (ii) furthers the purposes and intent of this Code.
(Ord. 2014-9, 4-29-2014; amd. Ord. 2017-7, 4-24-2017; Ord. 2017-14, 6-26-2017; Ord. 2018-5, 4-23-2018; Ord. 2018-15, 7-23-2018; Ord. 2018-16, 8-27-2018; Ord. 2019-4, 1-28-2019; Ord. 2019-11, 4-22-2019, eff. 5-1-2019; Ord. 2019-12, 4-22-2019; Ord. 2019-14, 5-13-2019; Ord. 2020-2, 1-13-2020; Ord. 2020-7, 4-27-2020; Ord. 2020-12, 7-13-2020; Ord. 2020-17, 10-12-2020; Ord. 2020-20, 11-9-2020; Ord. 2021-2, 2-8-2021; Ord. 2021-9, 4-26-2021; Ord. 2021-147-12-2021; Ord. 2022-10, 3-28-2022; Ord. 2022-15, 4-25-2022; Ord. 2022-35, 11-28-2022; Ord. 2022-38, 12-12-2022; Ord. 2022-35, 11-28-2022; Ord. 2023-8, 4-24-2023; Ord. 2023-16, 6-12-2023; Ord. 2023-18, 6-26-2023; Ord. 2024-8, 4-24-2024; Ord. 2024-19, 9-9-2024)