Section
5-2-6-1. Purpose
5-2-6-2. Territorial application
5-2-6-2.5 Applicability and general principles
5-2-6-3. Land alterations to be accomplished in accordance with storm water management requirements
5-2-6-3.5 General requirements for storm water quality control
5-2-6-4. Definitions
5-2-6-4.5 Responsibility for administration
5-2-6-5. Severability
5-2-6-5.5 Ultimate responsibility
5-2-6-6. Maintenance and repair of storm water facilities
5-2-6-7. Notice to correct storm water facilities
5-2-6-8. Storm water permits: required exceptions; when to be obtained, exemptions
5-2-6-9. Eligibility to obtain permit
5-2-6-10. Application, issuance of the storm water permit
5-2-6-11. Professionally prepared and certified storm water submittal
5-2-6-11.5 Requirements for a storm water pollution prevention plan (SWPPP)
5-2-6-12. When a professionally prepared and certified storm water pollution plan plan is not required
5-2-6-13. Duration of storm water permit
5-2-6-14. Deviation from the approved storm water construction plan and/or storm water pollution prevention plan
5-2-6-15. Determination of impacted storm water drainage areas
5-2-6-16. Adoption of storm water management master plans
5-2-6-17. Posting of surety
5-2-6-18. Execution of covenant
5-2-6-19. Dedication of storm water easement
5-2-6-20. Certification of compliance
5-2-6-21. Record drawings
5-2-6-22. General authority for investigations and inspections
5-2-6-23. Inspection of land alterations
5-2-6-23.5 Project termination
5-2-6-24. Fees for permits obtained after commencement of storm water work
5-2-6-25. Notice of violation
5-2-6-26. Revocation of storm water permits
5-2-6-27. Stop-work order
5-2-6-28. Civil action
5-2-6-29. General penalty
5-2-6-30. Enforcement of covenants
5-2-6-31. Storm water variance procedure
5-2-6-32. Storm water appeals
5-2-6-33. Storm water fee amount
5-2-6-34. Fee exemption for certain governmental units
5-2-6-35. Payment of storm water permits
5-2-6-36. Compliance with storm water standards and regulations
5-2-6-37. Authorization to promulgate regulations
5-2-6-38. Conformance with minimum standards and regulations
5-2-6-39. Conformity to other legal requirements
5-2-6-40. Characteristics of storm water facilities
5-2-6-41. Accommodation of runoff
5-2-6-42. Structures to be free from 100-year flood
5-2-6-43. Drainage away from structures
5-2-6-44. Damage to adjoining property
5-2-6-45. Conformance with minimum standards and regulations
5-2-6-46. Alternative standards, regulations and procedures available
5-2-6-47. Conformity to other legal requirements
5-2-6-48. Specific storm water requirements
5-2-6-49. Blocking drainage ways
5-2-6-50. Minimum standards for land alteration to control erosion and sedimentation
5-2-6-51. State and federal regulations
5-2-6-52. Erosion and sediment control plan and criteria
5-2-6-53. Perimeter controls
5-2-6-54. Permanency of grades
5-2-6-55. Buried materials
5-2-6-56. Inspections, maintenance and reporting