§ 5-2-6-50. MINIMUM STANDARDS FOR LAND ALTERATION TO CONTROL EROSION AND SEDIMENTATION.
   (A)   All land alterations, regardless of extent or type, shall be accomplished in such a way to control and limit, to the maximum extent practicable, erosion and sediment discharge from construction sites using, but not limited to, applicable methods and standards established by regulations promulgated by the Board of Public Works and Safety under § 5-2-6-37.
   (B)   The goals of such erosion and sediment control shall be to:
      (1)   Minimize the extent and duration of disturbed soil exposure;
      (2)   Protect off-site and downstream locations, drainage systems and natural watercourses from erosion and sedimentation;
      (3)   Limit exit velocities from the site to non-erosive or natural values; and
      (4)   Implement a thorough on-going inspection, maintenance and follow-up program.
(Ord. 6, 2008, passed 5-5-2008)