Loading...
Hot water shall be provided to supply all of the hospital fixture, kitchen and laundry requirements. Special fixtures and equipment shall have hot water supplied at a temperature specified by the manufacturer. The hot water system shall be installed in accordance with Sections 18-29-607 through 18-29-607.6.
Vacuum breakers shall be installed a minimum of 6 inches (150 mm) above the flood level rim of the fixture or device in accordance with Sections 18-29-608 through 18-29-608.17.1.2. The flood level rim of hose connections shall be the maximum height at which any hose is utilized.
Jet- or water-supplied orifices, except those supplied by the flush connections, shall not be located in or connected with a water closet bowl or clinical sink. This section shall not prohibit an approved bidet installation.
(Amend Coun. J. 11-8-12, p. 38872, § 355)
All clinical, hydrotherapeutic, radiological or any equipment that is supplied with water or that discharges to the waste system shall conform to the requirements of this section and Sections 18-29-608 through 18-29-608.17.1.2.
A water supply shall be provided for cleaning, flushing and resealing the condensate trap, and the trap shall discharge through an air gap in accordance with Sections 18-29-608 through 18-29-608.17.12.
Loading...