§ 531.03 Charges for Installation of Service Connections, Tapping Sleeves and Valves
   (a)   The charges for work performed by the Division of Water, including, but not limited to, service connection installations, hydrant relocations, tapping sleeve and valve installations and fire line installations, shall be in accordance with Section 535.06 of the Codified Ordinances.
   (b)   The applicant for a service connection shall pay in advance to the Division for the furnishing of material specified and the labor for tapping the water main and installing the service connection and pipe from the water main to approximately two (2) feet back to the curb line, or proposed curb line, including the setting of the stop cock box or valve box in a trench excavated by the applicant, his or her agent or contractor.
   (c)   All excavating, backfilling and repaving done within and without the territorial limits of the City are to be provided by the applicant by arrangement with the particular municipality.
(Ord. No. 778-06. Passed 6-5-06, eff. 6-9-06)