Extension of the service connection from the stop cock box or valve at or near the curb into the premises to be supplied with water shall be at the expense of the customer and may be made by the Division of Water or by a licensed plumber. If extended by a plumber the pipe must be left uncovered in the trench until it has been tested and inspected by the Division. The water shall not be turned on until the pipe has been inspected and approved.
(Ord. No. 99566. Passed 5-22-33)