§ 531.81 Fees for Engineering Services
   The Division of Water shall charge for engineering services it performs, such as plan reviews, hydraulic calculations, provision of copies of engineering drawings. processing of backflow device test and maintenance forms, conducting testing to certify contractors to perform backflow device testing and processing as-built drawings. A deposit for as-built drawings shall be collected prior to construction and shall be refunded, less the processing fee, when as-built drawings have been approved by the Division of Water. The deposit will not be refunded when the as-built drawings are incomplete or have not been submitted, Fees for processing as-built drawings shall be charged based upon the submittal format. All charges shall be under Section 535.06 of the Codified Ordinances.
(Ord. No. 462-11. Passed 5-23-11, eff. 6-22-11)