§ 531.56 Inspection, Approval and Repair of Fixtures
   (a)   All stop cocks or valves and all other fixtures used on any service pipe shall be subject to the inspection and approval of the Commissioner of Water, and must be repaired or changed promptly when so ordered by the Commissioner.
   (b)   At the Director's discretion and in order to prevent waste or to protect the integrity of the water system, the Division may, at its expense, perform ancillary plumbing service to the service pipe or connected fixtures in the building when replacing or installing a meter or stop cock pursuant to a Division-sponsored system improvement.
(Ord. No. 563-13. Passed 5-13-13, eff. 5-16-13)