§ 535.06 Fees and Charges
   For all fees and charges listed in this section, if the size is not listed, the fee will be assessed based on the next size larger on the schedule.
   (a)   Account Setup.*
Tap Connection
2024
2025
2026
2027
2028
2029
Tap Connection
2024
2025
2026
2027
2028
2029
1 in. or smaller
$248
$253
$261
$270
$278
$287
1-1/2 in.
$518
$529
$546
$564
$582
$601
2 in.
$1,283
$1,311
$1,354
$1,397
$1,442
$1,488
4 in.
$1,647
$1,683
$1,737
$1,793
$1,850
$1,910
6 in.
$1,733
$1,771
$1,828
$1,887
$1,947
$2,010
8 in.
$1,949
$1,992
$2,056
$2,122
$2,190
$2,261
10 in.
$2,320
$2,371
$2,447
$2,526
$2,607
$2,691
12 in.
$3,248
$3,320
$3,426
$3,536
$3,650
$3,767
16 in.
$4,344
$4,440
$4,583
$4,730
$4,882
$5,039
 
* Prices assume tap is a ductile iron pipe. For concrete pipe, a fifty-five percent (55%) surcharge shall be added.
   (b)   Direct Tap / Tapping Sleeve Installation Fee.*
Tap / Connection
2024
2025
2026
2027
2028
2029
Tap / Connection
2024
2025
2026
2027
2028
2029
1 in. or smaller
$187
$191
$197
$203
$210
$217
1-1/2 in.
$394
$401
$414
$428
$441
$456
2 in.
$973
$992
$1,024
$1,057
$1,091
$1,126
4 in.
$1,248
$1,272
$1,313
$1,355
$1,399
$1,444
6 in.
$1,313
$1,338
$1,381
$1,426
$1,472
$1,519
8 in.
$1,477
$1,505
$1,554
$1,604
$1,655
$1,708
10 in.
$1,758
$1,792
$1,850
$1,909
$1,971
$2,034
12 in.
$2,461
$2,509
$2,589
$2,673
$2,758
$2,847
16 in. or larger (deposit + cost)**
$3,293
$3,357
$3,465
$3,576
$3,691
$3,801
 
* Prices assume tap is a ductile iron pipe. For concrete pipe, a fifty-five percent (55%) surcharge shall be added.
** Fee listed is a deposit; actual final cost of labor and materials shall be assessed to customer.
   (c)   New Connection Rescheduling Fee (if not cancelled 24 hours prior to appointment).
 
2024
2025
2026
2027
2028
2029
$141
$152
$158
$164
$170
$176
 
   (d)   Curb Valves. Fee includes labor for installation only. Excavation, sheeting, testing, and restoration are the customer's responsibility.
Curb Valves
2024
2025
2026
2027
2028
2029
Curb Valves
2024
2025
2026
2027
2028
2029
1-1/2 in.
$192
$192
$192
$194
$201
$207
2 in.
$192
$192
$192
$194
$201
$207
3 in.
$384
$384
$384
$388
$402
$414
4 in.
$384
$384
$384
$388
$402
$414
6 in.
$384
$384
$384
$388
$402
$414
8 in.
$384
$384
$384
$388
$402
$414
10 in.
$576
$576
$576
$582
$603
$621
12 in.
$576
$576
$576
$582
$603
$621
 
   (e)   Plugging Connections. Fee only includes actual plugging of connection. Excavation and restoration shall be invoiced at cost to the customer.
 
Plugging Connections
2024
2025
2026
2027
2028
2029
Smaller than 2 in.
$2,205
$2,830
$2,915
$3,003
$3,094
$3,187
2 in. to 12 in.
$2,939
$3,764
$3,877
$3,994
$4,115
$4,239
Larger than 12 in.
$3,673
$4,726
$4,868
$5,015
$5,167
$5,322
Connection Containment
$210
$216
$223
$229
$236
$243
Connection Reinstatement
$155
$161
$168
$174
$181
$189
 
   (f)   Assembling Meter Settings for Vault Meters. Fee includes labor only.
Meter Size
2024
2025
2026
2027
2028
2029
Meter Size
2024
2025
2026
2027
2028
2029
1-1/2 in.
$348
$348
$348
$357
$369
$381
2 in.
$348
$348
$348
$357
$369
$381
3 in.
$348
$348
$348
$357
$369
$381
4 in.
$452
$452
$452
$464
$480
$495
6 in.
$1,018
$1,018
$1,018
$1,049
$1,083
$1,119
8 in.
$1,318
$1,318
$1,318
$1,357
$1,401
$1,448
10 in.
$1,677
$1,677
$1,677
$1,728
$1,784
$1,842
12 in.
$2,037
$2,037
$2,037
$2,098
$2,166
$2,237
 
   (g)   Install / Replace Meters.
Meter Size
2024
2025
2026
2027
2028
2029
1 in. or smaller - Inside Setting
$344
$354
$362
$370
$378
$387
1 in. or smaller - Vault Setting
$391
$400
$409
$418
$428
$439
1-1/2 in. - Inside Setting
$577
$603
$614
$625
$636
$648
1-1/2 in. - Vault Setting
$577
$603
$614
$625
$636
$648
2 in.
$646
$659
$670
$681
$692
$704
3 in.
$1,489
$1,597
$1,630
$1,663
$1,697
$1,733
4 in.
$1,561
$1,684
$1,717
$1,750
$1,784
$1,820
6 in.
$2,579
$2,581
$2,627
$2,675
$2,724
$2,774
8 in.
$2,984
$3,231
$3,277
$3,325
$3,374
$3,424
10 in.
$3,684
$4,031
$4,077
$4,125
$4,174
$4,224
12 in.
$4,829
$5,646
$5,692
$5,740
$5,789
$5,839
2 in. Compound
$2,189
$2,311
$2,357
$2,405
$2,454
$2,504
3 in. Compound
$2,154
$2,514
$2,557
$2,605
$2,654
$2,704
4 in. Compound
$2,744
$2,771
$2,817
$2,865
$2,914
$2,964
6 in. Compound
$3,504
$3,681
$3,727
$3,775
$3,824
$3,874
8 in. Compound
$5,029
$5,881
$5,927
$5,975
$6,024
$6,074
10 in. Compound
$7,705
$9,270
$9,316
$9,364
$9,413
$9,463
12 in. Compound
$12,402
$15,188
$15,234
$15,282
$15,331
$15,381
Specialty meter (labor costs only - meter hardware involved at actual cost)
$3,000
$3,000
$3,000
$3,000
$3,000
$3,000
Endpoint
$128
$105
$108
$111
$115
$118
Transmitter Wire
$50
$10
$11
$11
$11
$11
 
   (h)   Assembling Regulator Setting. Fee includes labor for assembling setting only. Material, material delivery, excavation, sheeting, transporting the assembly, testing, installation, and restoration are the customer’s responsibility.
 
Regulator Size
2024
2025
2026
2027
2028
2029
8 in.
$1,681
$1,726
$1,782
$1,839
$1,898
$1,959
12 in.
$2,800
$2,883
$2,975
$3,071
$3,170
$3,271
 
   (i)   Regulator Controls Setup. Fee includes labor for installation only. Excavation, sheeting, testing, and restoration are the customer’s responsibility.
 
Regulator Size
2024
2025
2026
2027
2028
2029
8 in.
$1,681
$1,726
$1,782
$1,839
$1,898
$1,959
12 in.
$2,800
$2,883
$2,975
$3,071
$3,170
$3,271
 
   (j)   Water Use from Hydrants and Other Unmetered Sources.
 
2024
2025
2026
2027
2028
2029
Permit
$66
$73
$76
$80
$84
$88
Volume Charge
($/MCF/Service Area)
Charged at additional MCF rate in applicable rate district where hydrant is located
Meter/Valve/BF Assembly Refundable Deposit
$1,450
$1,475
$1,500
$1,525
$1,550
$1,575
Meter Rental Fee First Week
$48
$53
$56
$59
$62
$65
Meter Rental Fee Each Week After
$34
$38
$40
$42
$44
$46
 
   (k)   Miscellaneous Engineering Services. 
2024
2025
2026
2027
2028
2029
2024
2025
2026
2027
2028
2029
Minimum (for engineering services
$61
$67
$69
$71
$73
$76
Plan reviews - plan and profile drawing containing water work (per foot, 50-foot minimum)
$1.22
$1.33
$1.37
$1.42
$1.46
$1.51
Deposit for proper submittal of customer created As-Builts - fully refundable when approved. As-Builts received within 180 days of main going into service (per foot, 50-foot of water main minimum.)
$10
$10
$10
$10
$10
$10
As-Built processing fee - plan profile drawing containing water work (per foot)
Hard or paper copy
$0.70
$0.70
$0.70
$0.70
$0.70
$0.70
GIS format per CWD
Standards
$0.07
$0.07
$0.07
$0.07
$0.07
$0.07
Backflow prevention testing fee - CWD processing fee*
$18
$19
$20
$21
$22
$23
Additional review due to plan change without prior approval (per hour)
$58
$59
$60
$61
$62
$63
 
* Backflow prevention testing fee - These are direct Cleveland Water Division costs for managing the backflow program. Additional fees charged by the Cleveland Water Division’s backflow vendor will shall also be passed on charged to the customer.
   (l)   Disinfection of Water Mains.*
2024
2025
2026
2027
2028
2029
2024
2025
2026
2027
2028
2029
4 in.
$0.78
$0.81
$0.84
$0.87
$0.91
$0.95
6 in.
$0.78
$0.81
$0.84
$0.87
$0.91
$0.95
8 in.
$1.02
$1.06
$1.10
$1.14
$1.18
$1.23
10 in.
$1.02
$1.06
$1.10
$1.14
$1.18
$1.23
12 in.
$1.22
$1.27
$1.32
$1.37
$1.42
$1.47
16 in.
$1.35
$1.40
$1.45
$1.51
$1.57
$1.63
20 in. or greater (deposit + cost)
$4,160
$4,310
$4,470
$4,630
$4,800
$4,970
Service Fee**
$480
$500
$520
$540
$560
$580
 
* 1,200-foot minimum.
** Service is charged each time the disinfection crew has to set up its equipment/trip.
 
   (m)   Meter Inspections / Meter Tests at Customer Request.
 
2024
2025
2026
2027
2028
2029
1 in. or smaller
$135
$135
$135
$138
$143
$147
1-1/2 in. to 4 in.
$270
$270
$270
$276
$286
$294
Larger than 4 in.
$540
$540
$540
$552
$572
$588
 
   (n)   Special Service Calls.
 
2024
2025
2026
2027
2028
2029
$48
$48
$49
$51
$53
$54
 
   (o)   Special Service Calls – Expedited.
 
2024
2025
2026
2027
2028
2029
$96
$96
$99
$102
$105
$109
 
   (p)   Appointment Broken by Customer.
 
2024
2025
2026
2027
2028
2029
$42
$43
$44
$45
$46
$47
 
   (q)   Returned Check (per check).
 
2024
2025
2026
2027
2028
2029
$34
$34
$34
$34
$34
$34
 
   (r)   Tampering.
 
2024
2025
2026
2027
2028
2029
First Incident
$250
$250
$250
$250
$250
$250
Second Incident
$2,300
$2,300
$2,300
$2,300
$2,300
$2,300
Each Incident thereafter
$3,700
$3,700
$3,700
$3,700
$3,700
$3,700
 
   (s)   Lab Testing.
2024
2025
2026
2027
2028
2029
2024
2025
2026
2027
2028
2029
Bacteria Colilert - 18
$23
$23
$23
$23
$23
$23
Bacteria Ecoli for LT2
$24
$24
$24
$24
$24
$24
Halo Acetic Acids 552.2
$151
$151
$151
$151
$151
$151
Metals
$112
$112
$112
$112
$112
$112
Total Organic Carbon
$25
$25
$25
$25
$25
$25
Ion Chromatography *
$63
$100
$100
$100
$100
$100
Trihalomethanes 524.2
$45
$75
$75
$75
$75
$75
Total Microcystins ELISA-ADDA
$34
$100
$100
$100
$100
$100
Total Microcystins ELISA-ADDA follow-up sample **
$700
$700
$700
$700
$700
$700
Quantitative Polymerase Chain Reaction (aPCR) ***
$250
$250
$250
$250
$250
$250
General Wet Chemistry ****
$50
$50
$50
$50
$50
$50
 
* Includes fluoride, phosphate, bromide, chloride, nitrate, nitrite, and sulfate.
** Resample and repeat samples following a routine sample detection (price per day of sampling).
*** aPCR screening for cyanobacteria and cyanotoxin gene detection meeting Ohio EPA analytical requirements.
**** Includes pH, alkalinity, hardness, free and total chorine residual, and turbidity.
   (t)   Private Fire Protection Charges.
Fire Line Size
2024
2025
2026
2027
2028
2029
Fire Line Size
2024
2025
2026
2027
2028
2029
1-1/2 in.
$17.15
$17.71
$18.04
$18.09
$18.53
$18.75
2 in.
$17.15
$17.71
$18.04
$18.09
$18.53
$18.75
3 in.
$17.15
$17.71
$18.04
$18.09
$18.53
$18.75
4 in.
$46.60
$48.13
$49.02
$49.15
$50.35
$50.96
6 in.
$67.20
$69.41
$70.69
$70.87
$72.61
$73.48
8 in.
$119.95
$123.89
$126.18
$126.51
$129.60
$131.17
10 in.
$187.80
$193.96
$197.55
$198.07
$202.92
$205.36
12 in.
$256.35
$264.76
$269.66
$270.36
$276.98
$280.32
 
   (u)   The fees and charges are effective beginning January 1 of each year.
   (v)   The Commissioner may enter into payment arrangements for installment payments of the fees and charges contained in this section or in Section 535.23 and Section 535.24 when determined to be reasonable by the Commissioner. Failure to make any payment under an arranged payment plan when due shall cause the total unpaid amount to become payable on demand and may lead to termination of water service.
(Ord. No. 446-2024. Passed 6-3-24, eff. 7-3-24) (BOC Res. No. 347-24. Adopted 7-24-24)