As development continues and demands on the system trend towards buildout, additional projects will be necessary to maintain the City's level of service. Table 8-3 details the projects necessary for the water system at buildout. BC&A reviewed projects from the previous master plan and added, changed or removed projects based on whether the project had already been completed, the needs changed, or if additional capacity was needed.
ID | Previous ID | Problem | Proposed Solution |
ID | Previous ID | Problem | Proposed Solution |
TP-8 | BD-2 | Source transmission is needed for Zone 5 South Tank | Install 7,600 feet of 20-inch pipe in the future 6700 West between 10200 South and the Terminal Tanks |
TP-9 | BD-3 | Source transmission is needed for new Zone 5 North Tank | Install 2,575 feet of 16-inch pipeline between the proposed Zone 5 pump station at the U-111 Tanks and the 6950 West 10200 South JVWCD connection |
TP-10 | BD-4 | Outflow transmission is needed for new Zone 5 North Tank | Install 3,540 feet of 16-inch pipeline between the proposed Zone 5 North Tank and 6700 West 7400 South |
TP-11 | BD-5 | Transmission is needed for new Zone 5 South Tank | Install 6,000 feet of 24-inch pipeline from the Zone 5 Pump Station at the Terminal Tank Site across New Bingham Highway and then west to the Zone 5 South Tank |
TP-12 | BD-6 | Transmission is needed for new Zone 7 North Tank | Install 5,000 feet of 12-inch pipeline between the proposed Zone 7 North Tank and the Zone 7 distribution pipes |
TP-13 | BD-7 | Transmission is needed for new Zone 7 South Tank | Install 3,260 feet of 16-inch pipeline between the proposed Zone 7 South Tank and the Zone 7 distribution pipes |
TP-14 | BD-9 | Transmission is needed on north side of Maples area | Install 1,045 feet of 12-inch pipe in the planned future road between U-111 and 7400 South 6800 West |
TP-15 | BD-11 | Additional transmission capacity is needed | Install 2,670 feet of 20-inch & 8-inch pipe in 9400 South between U-111 and New Bingham Highway and a 16-inch PRV just west of the intersection of 9400 South and New Bingham Highway |
TP-16 | BD-13 | Additional transmission capacity is needed | Install 3,230 feet of 16-inch pipe in U-111 between 7500 South and 7000 South |
TP-17 | - | Transmission is needed for new Zone 5 South BPS | Install 2,510 feet of 20-inch pipe in New Bingham Highway between the Zone 5 BPS discharge at the Terminal Tank site and 6400 West |
TP-18 | - | Transmission is needed from the south end of Zone 5 to the north end. | Install 5,200 feet of 16-inch pipe along future 6700 W from New Bingham Hwy to 8600 South |
PRV-2 | BD-14 | Need PRV in Future 7000 South Transmission pipeline | Install a 12-inch PRV and vault in 7000 South at 6200 West |
PRV-3 | BD-15 | Need PRV in Future 7000 South Transmission pipeline | Install a 12-inch PRV and vault in 7000 South at about 5820 West |
PS-1 | W-11 | Zone 5 South Booster Station | New 4,500 gpm booster pump station at the Terminal Tank site to pump water into Zone 5 |
PS-2 | W-12 | Zone 5 North Booster Station | New 4,500 gpm booster pump station at the U-111 Tank site to pump water into Zone 5 |
PS-3 | W-16 | Zone 7 North Booster Station | New 1,500 gpm booster pump station at the Terminal Tank site to pump water into Zone 7 |
PS-4 | W-17 | Zone 7 South Booster Station | New 1,500 gpm booster pump station at the Bench Tank site to pump water into Zone 7 |
PS-5 | W-13 | Additional Zone 2 Booster Pump | Additional booster pump in the existing Zone 2 booster pump station |
PS-6 | W-14 | Additional Zone 3 Booster Pump | Additional booster pump in the existing Zone 3 booster pump station |
PS-7 | W-15 | Additional Zone 4 Booster Pump | Additional booster pump in the existing Zone 4 booster pump station |