2.6   WATER REQUIREMENTS BY ZONE
Water production requirements are typically analyzed for a system as a whole to assure that there is adequate water available for the system. However, it is also beneficial to look at requirements by zone for infrastructure planning, which this report analyzes in later section. As such, BC&A completed an ERC analysis by zone.
Billing data for 2019 was provided by the City as the latest typical use year, as well as the ERC count the City completed for that year. Based on water use from the billing data, ERCs were determined for each pressure zone in 2019. This data was then compared to the 2013 ERC values that were used in the previous master plan. Since the previous master plan, the City has kept track of approved developments in each zone. The projected ERCs were compared to the currently approved developments to determine how many ERCs remain approved, but not constructed. This was projected forward to 2021 to provide final ERC projections by zone. Table 2-5 shows the results of this analysis, as well as the buildout ERCs for each zone.
Table 2-5
ERCs by Zone
Year
TOTAL
Zone 1
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Year
TOTAL
Zone 1
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
2013
37,993
11,493
5,834
9,473
5,526
4,983
684
0
2014
38,470
11,532
5,840
9,518
5,623
5,144
829
0
2015
38,952
11,571
5,845
9,563
5,720
5,305
974
0
2016
39,441
11,609
5,850
9,608
5,817
5,466
1,119
0
2017
39,935
11,648
5,856
9,652
5,914
5,627
1,264
0
2018
40,436
11,687
5,861
9,697
6,010
5,788
1,408
0
2019
40,943
11,725
5,866
9,742
6,107
5,949
1,553
0
2020
41,456
11,766
5,872
9,788
6,208
6,117
1,705
0
2021
41,976
11,807
5,878
9,836
6,311
6,288
1,858
0
Approved, Not Completed
6,638
522
72
604
1,307
2,175
1,957
0
2021 + Approved, Not Completed
48,614
12,329
5,950
10,439
7,618
8,463
3,815
0
Buildout
66,253
12,800
6,106
11,147
15,178
11,621
6,869
2,532
 
Once the ERCs by zone have been set, water requirements by zone can be determined. Previously, the peak day water supply requirement was determined based on the State's minimum sizing requirement. This is necessary for supply redundancy for the system as a whole. For modeling and infrastructure planning in individual zones, peak demand without redundancy can be used. Table 2-6 details the peak water demand by zone for 2021 and at buildout.
Table 2-6
Water Demand by Zone
Pressure Zone
2021 Peak Day Demand (gpm)
Buildout Peak Day Demand (gpm)
Pressure Zone
2021 Peak Day Demand (gpm)
Buildout Peak Day Demand (gpm)
Zone 1
11,583
12,211
Zone 2
5,766
5,911
Zone 3
9,649
10,478
Zone 4
6,191
11,797
Zone 5
6,168
9,540
Zone 6
1,823
4,991
Zone 7
0
1,601
Total
41,181
56,528