2.3.1   HISTORIC PRODUCTION REQUIREMENTS
In order to predict future water production requirements for the City of West Jordan, historical water use data was used to determine the appropriate factor. Historic water use for the years 2017 through 2020 as summarized in Table 2-3.
Table 2-3
West Jordan Historic Water Production
 
Year
Population
ERCs
Total Water Production (Acre-Ft)
Acre- Ft/ERC
gpd/ERC
Peak Day Water Production (mgd)
Peaking Factor
2017
102,000
39,935
22,200
0.56
496
43.6
2.20
2018
102,500
40,436
23,062
0.57
509
53.3
2.59
2019
103,250
40,943
20,853
0.51
455
46.0
2.47
2020
103,762
41,456
23,718
0.57
511
43.9
2.07
 
Based on the information in the table above, BC&A determined that the highest annual water use per ERC occurred in 2020 at 511 gal/day/ERC. The peaking factor from annual average to peak day water use was also calculated over the same span. The max peaking factor occurred in 2018 and was 2.59.