20.50.070   Conversions–Submission of reports.
   At the time of submission of the subdivision map to the city, and in addition to all documents, maps, plans, information and reports required by Title 18 of this code, any person seeking approval of a condominium conversion development shall submit the following reports:
   A.   A report showing the extent to which the proposed condominium conversion will not comply fully with the building and zoning requirements of the city existing as of the date of application, and also as to the date of the issuance of the building permit for the original construction of the building;
   B.   A property report describing the condition and useful life of the roof, foundations, mechanical, electrical, plumbing, and structural elements of all existing buildings and structures. Such report shall be prepared by a registered civil or structural engineer or a licensed general building contractor or general engineering contractor. Such report may be waived where the building official finds that comparable information is available in a different form;
   C.   Any other information which the director of planning and community development determines will assist in determining whether the proposed project will be consistent with the purposes of this chapter.
(Ord. 83-03-904 § 5 (part): Ord. 78-11-809 § 2 (part): prior code § 19.52.060(B))