(a) All IPRC engineering plan review fees and the CFA application fee specified in § 2-321 of the city code shall be paid to the city:
(1) Before a standard review project will be scheduled by IPRC for a first review; or
(2) Before an express CFA review project will be scheduled by IPRC for a pre-submittal conference.
(b) For purposes of calculating the IPRC engineering plan review fee, all detail sheets, regardless of the number of pages, will be considered one page.
(c) The IRPC engineering plan review fee will not apply to the following engineering sheets:
(1) Cover sheet;
(2) Plat notes; and
(3) General notes.
(d) When there is city participation in the design of a project, the IPRC engineering plan review fees will not be charged to the developer for the portion of the design that is attributable to the city participation in the design of the project as outlined in the written agreement between the city and the developer.
(Ord. 23656-05-2019, § 1, passed 5-7-2019, eff. 6-1-2019)