Skip to code content (skip section selection)
Compare to:
§ 9-206 ADJUSTMENT OR DISTURBANCE OF INFRASTRUCTURE DURING MAINTENANCE BOND PERIOD.
   If a project requires an adjustment, cut, relocation, or disturbance of public infrastructure that has been accepted by the city and is covered by a maintenance bond, the contractor for the project must provide the city with a new maintenance bond covering the scope of work being performed by the contractor that is valid for a period of two years from acceptance of the community facilities. Compliance with the city's utility construction policy, if applicable, is required.
(Ord. 23656-05-2019, § 1, passed 5-7-2019, eff. 6-1-2019)