Section
General Provisions
155.001 Title
155.002 Jurisdiction
155.003 Purpose
155.004 Severability
155.005 Plat; when required
155.006 Definitions
155.007 Duties of Zoning Administrator
155.008 Traffic studies
155.009 Street access management
155.010 Subdivision street and sidewalk
Location and Sketch Maps
155.020 Purpose
155.021 Submission requirements
155.022 Subdivision site suitability
155.023 Location and sketch maps review process
155.024 Validity of location and sketch maps approval
Preliminary Plan
155.030 Purpose
155.031 Submission requirements
155.032 Preliminary plan review process
155.033 Commission action
155.034 Village Board action
155.035 Validity of preliminary plan; reaffirmation of preliminary plan
Construction Plans
155.040 Purpose
155.041 Construction plans in the event there is more than one final plat
155.042 Submission requirements
155.043 Construction plan review process
155.044 Engineering plan review fees
Construction and Bonding of
Subdivision
Improvements
155.050 Beginning construction of Subdivision Improvements
155.051 Notification of construction
155.052 Review and inspection fees
155.053 Inspection and testing during construction
155.054 Security for Subdivision Improvements
155.055 Partial reduction of security
155.056 Length security in effect; forfeiture
155.057 Approval of Subdivision Improvements
Final Plat
155.070 Purpose
155.071 Submission requirements
155.072 Final plat review process
155.073 Submission of final plat to Village Board
155.074 Village Board approval
155.075 Recording the final plat
155.076 Acceptance of public improvements
155.077 Effect of final acceptance
Design Standards and Specifications for Required
Subdivision
Improvements
155.090 Specific specifications
155.091 Right-of-way streets
155.092 Street design
155.093 Lot and block design
155.094 Erosion and sediment control
155.095 Utility easements; location of utilities
155.096 Surface water drainage
155.097 Backfill over underground utilities
155.098 Sidewalks
155.099 Sewage disposal
155.100 Water supply
155.101 Electric distribution
155.102 Street lighting
155.103 Public areas and open space
Minor Subdivision
155.110 Purpose
155.111 Location map
155.112 Final plat submission requirements
155.113 Review process
155.114 Submission of minor subdivision plat to the Village Board
155.115 Village Board approval
155.116 Recording the minor subdivision plat
155.117 Limitations on minor subdivisions
Large Scale Developments
155.130 Purpose
155.131 Submission requirements
155.132 Standards and requirements
155.133 Review process
155.134 Commission action
155.135 Review by the Village Board
155.136 Construction plans
155.137 Construction and securities
Tract Survey
155.150 Purpose
155.151 Submission requirements
155.152 Review process
155.153 Recording the tract survey
Procedure at Public Hearing; Variations;
Review of Adverse Decisions; Penalty
Review of Adverse Decisions; Penalty
155.160 Procedure at public hearings
155.161 Variance of subdivision requirements
155.162 Review of adverse Commission decision
155.999 Penalty
Appendices
A-1 Village of Chatham Subdivision Jurisdiction
A-2 Facilities Plan (on file with Springfield Metro Sanitary District)
A-3 Arterial Roadway Network Plan
A-4 Bill of Sale for Public Improvements
A-5 Typical Residential Street Section
A-6 Paved Ditch Detail
A-7 Parallel Tee/Hydrant
A-8 Typical Cul-de-sac ROW and Lot Layout
A-9 Typical Corner Elbow ROW and Lot Layout
A-10 Typical Sanitary Manhole Location in Easement
A-11 Typical Trench Detail
A-12 Residential Valley Gutter
SUBDIVISION REVIEW PROCEDURE
# of Prints | Reviewed By | Payment | Approval Valid For |
# of Prints | Reviewed By | Payment | Approval Valid For | |
Location Map Minor Subdivision | 12 | CPC Village Board | None | 1 Year |
Location and Sketch Maps | 12 | CPC Village Board | None | 1 Year |
Preliminary Plan | 13 | CPC Village Board | $200 | 3 Years |
Construction Plans | 4 | Village Engineer | Fees described in Notes 1, 2, 3 and 4 | As long as Prelim Plan is Current |
Final Plat | 13 | CPC Village Board | $200 plus Fee described in Note 5 | 2 Years |
Preliminary Plan Reaffirmation | 13 | CPC Village Board | None | 3 Years Renewable Time |
Minor Subdivision | 12 | CPC Village Board | $200 | 2 Years |
Large Scale Development | 13 | CPC Village Board | $200 | |
CPC - Chatham Planning Commission
NOTES:
(1) Plan Review and Inspection Fee - 2.5% of estimated construction cost of Subdivision Improvements.
(2) Street Sign Fee - actual cost of new sign assemblies (See § 155.092(L)(2)).
(3) Electric Infrastructure Fee - fee identified in current electric ordinance.
(4) Early Warning Siren Fee - fee identified in current electric ordinance.
(5) Plan Review and Inspection Fee - fee described in note (1), if not already paid.