CHAPTER 155: SUBDIVISIONS
Section
General Provisions
   155.001   Title
   155.002   Jurisdiction
   155.003   Purpose
   155.004   Severability
   155.005   Plat; when required
   155.006   Definitions
   155.007   Duties of Zoning Administrator
   155.008   Traffic studies
   155.009   Street access management
   155.010   Subdivision street and sidewalk
Location and Sketch Maps
   155.020   Purpose
   155.021   Submission requirements
   155.022   Subdivision site suitability
   155.023   Location and sketch maps review process
   155.024   Validity of location and sketch maps approval
Preliminary Plan
   155.030   Purpose
   155.031   Submission requirements
   155.032   Preliminary plan review process
   155.033   Commission action
   155.034   Village Board action
   155.035   Validity of preliminary plan; reaffirmation of preliminary plan
Construction Plans
   155.040   Purpose
   155.041   Construction plans in the event there is more than one final plat
   155.042   Submission requirements
   155.043   Construction plan review process
   155.044   Engineering plan review fees
Construction and Bonding of Subdivision Improvements
   155.050   Beginning construction of Subdivision Improvements
   155.051   Notification of construction
   155.052   Review and inspection fees
   155.053   Inspection and testing during construction
   155.054   Security for Subdivision Improvements
   155.055   Partial reduction of security
   155.056   Length security in effect; forfeiture
   155.057   Approval of Subdivision Improvements
Final Plat
   155.070   Purpose
   155.071   Submission requirements
   155.072   Final plat review process
   155.073   Submission of final plat to Village Board
   155.074   Village Board approval
   155.075   Recording the final plat
   155.076   Acceptance of public improvements
   155.077   Effect of final acceptance
Design Standards and Specifications for Required Subdivision Improvements
   155.090   Specific specifications
   155.091   Right-of-way streets
   155.092   Street design
   155.093   Lot and block design
   155.094   Erosion and sediment control
   155.095   Utility easements; location of utilities
   155.096   Surface water drainage
   155.097   Backfill over underground utilities
   155.098   Sidewalks
   155.099   Sewage disposal
   155.100   Water supply
   155.101   Electric distribution
   155.102   Street lighting
   155.103   Public areas and open space
Minor Subdivision
   155.110   Purpose
   155.111   Location map
   155.112   Final plat submission requirements
   155.113   Review process
   155.114   Submission of minor subdivision plat to the Village Board
   155.115   Village Board approval
   155.116   Recording the minor subdivision plat
   155.117   Limitations on minor subdivisions
Large Scale Developments
   155.130   Purpose
   155.131   Submission requirements
   155.132   Standards and requirements
   155.133   Review process
   155.134   Commission action
   155.135   Review by the Village Board
   155.136   Construction plans
   155.137   Construction and securities
Tract Survey
   155.150   Purpose
   155.151   Submission requirements
   155.152   Review process
   155.153   Recording the tract survey
Procedure at Public Hearing; Variations;
Review of Adverse Decisions; Penalty
   155.160   Procedure at public hearings
   155.161   Variance of subdivision requirements
   155.162   Review of adverse Commission decision
   155.999   Penalty
Appendices
   A-1   Village of Chatham Subdivision Jurisdiction
   A-2   Facilities Plan (on file with Springfield Metro Sanitary District)
   A-3   Arterial Roadway Network Plan
   A-4   Bill of Sale for Public Improvements
   A-5   Typical Residential Street Section
   A-6   Paved Ditch Detail
   A-7   Parallel Tee/Hydrant
   A-8   Typical Cul-de-sac ROW and Lot Layout
   A-9   Typical Corner Elbow ROW and Lot Layout
   A-10   Typical Sanitary Manhole Location in Easement
   A-11   Typical Trench Detail
   A-12   Residential Valley Gutter
 
SUBDIVISION REVIEW PROCEDURE
# of Prints
Reviewed By
Payment
Approval Valid For
# of Prints
Reviewed By
Payment
Approval Valid For
Location Map Minor Subdivision
12
CPC
Village Board
None
1 Year
Location and Sketch Maps
12
CPC
Village Board
None
1 Year
Preliminary Plan
13
CPC
Village Board
$200
3 Years
Construction Plans
4
Village Engineer
Fees described in Notes 1, 2, 3 and 4
As long as Prelim Plan is Current
Final Plat
13
CPC
Village Board
$200 plus Fee described in
Note 5
2 Years
Preliminary Plan Reaffirmation
13
CPC
Village Board
None
3 Years Renewable Time
Minor Subdivision
12
CPC
Village Board
$200
2 Years
Large Scale Development
13
CPC
Village Board
$200
 
 
CPC - Chatham Planning Commission
NOTES:
   (1)   Plan Review and Inspection Fee - 2.5% of estimated construction cost of Subdivision Improvements.
   (2)   Street Sign Fee - actual cost of new sign assemblies (See § 155.092(L)(2)).
   (3)   Electric Infrastructure Fee - fee identified in current electric ordinance.
   (4)   Early Warning Siren Fee - fee identified in current electric ordinance.
   (5)   Plan Review and Inspection Fee - fee described in note (1), if not already paid.