Skip to code content (skip section selection)
Compare to:
West Jordan Overview
West Jordan, UT Code of Ordinances
West Jordan General Plan
West Jordan Midvale 3 Stations Plan
West Jordan Parks and Recreation Master Plan
West Jordan Sanitary Sewer Master Plan
West Jordan Storm Drainage Master Plan
West Jordan Active Transportation Plan
West Jordan Transportation Master Plan
West Jordan Water Master Plan
11-2-12: APPROVED PLANS:
Prior to issuance of the land disturbance permit, the applicant shall provide the city with four (4) sets of the final grading plans, specifications and computations (full size) and two (2) sets of eleven inch by seventeen inch (11" x 17") plans. Upon issuance of the land disturbance permit, the city engineer shall endorse in writing, or stamp "Released For Construction" on all required sets of grading plans and specifications. The city engineer shall retain two (2) sets of the plans and specifications during the period of construction and as thereafter required by the government records access and management act (GRAMA). Upon approval, the city engineer shall return one set of the stamped final grading plans and specifications to the applicant. The applicant shall retain the stamped set of plans and specifications at the site covered by the land disturbance permit at all times during which the work authorized thereby is in progress. (2001 Code § 81-2-180; amd. Ord. 10-27, 9-8-2010)