Skip to code content (skip section selection)
Compare to:
West Jordan Overview
West Jordan, UT Code of Ordinances
West Jordan General Plan
West Jordan Midvale 3 Stations Plan
West Jordan Parks and Recreation Master Plan
West Jordan Sanitary Sewer Master Plan
West Jordan Storm Drainage Master Plan
West Jordan Active Transportation Plan
West Jordan Transportation Master Plan
West Jordan Water Master Plan
11-2-5: PLANS AND SPECIFICATIONS:
Each application for a land disturbance permit shall include the following plans, specifications, reports, documentation and information:
   A.   A vicinity sketch or other data adequately indicating the site location;
   B.   The property lines and dimensions and bearings of the property on which the work is to be performed;
   C.   The location of any existing buildings or structures on the property where the work is to be performed and the location of any building or structure on the land of adjacent property owners, which building or structure is within fifty feet (50') of the property boundary;
   D.   The location of landmark trees as indicated by the designation of the location of the center of the trunk;
   E.   Accurate topography showing suitable contours of the existing and proposed ground elevations. The contours shall be extended past the boundary lines of any project for a minimum of one hundred feet (100'). The city engineer may require the contours to be extended to include watershed areas and all other areas influencing the proposed project or site;
   F.   The elevations, dimensions, locations, extent and slopes of all proposed land disturbance activities shown by contours or other means;
   G.   A certification, by a soils engineer, of the quantity and type of material of any proposed excavation and fill;
   H.   The estimated starting and completion dates for the proposed land disturbance activities and proposed land disturbance activities schedule and permit term;
   I.   Detailed plans of all drainage devices, walls, cribbing, dams, or other protective devices to be constructed in connection with, or as a part of, the proposed work, together with a map showing the drainage area and estimated runoff of the area served by the drains. All hydrologic and hydraulic calculations shall be signed by a civil engineer;
   J.   Temporary construction entrance and exit plan as indicated in the LDDCS;
   K.   An indication as to the type of structures to be constructed or the proposed use of the site, such as single- family residence, multiple-family development, commercial or industrial; and
   L.   Any additional plans, drawings or calculations required herein or by the city engineer. (2001 Code § 81-2-040)