Asphalt paving operations shall not begin until all utilities, including, but not limited to, electrical power, natural gas, telephone, cable television, culinary water, irrigation water, sanitary sewer and storm sewer are installed under the streets. Provisions shall be made for future installation of signalized intersections, electrical power, natural gas, telephone and cable television through sleeves or conduits placed under the pavement. The city shall not be responsible for coordinating the timely installation of these utilities, and the city administrator or designee may require evidence of such coordination prior to or as a condition of any approvals or permits involving asphalt paving. (2001 Code § 89-6-405; amd. 2009 Code; Ord. 19- 48, 12-11-2019, Effective at 12 noon on January 6, 2020)