14-5-10: SOILS:
   A.   Geotechnical Report: A geotechnical report shall be prepared by a licensed geotechnical engineer and submitted to the city for any proposed subdivisions. The report shall be prepared in accordance with requirements of the city public improvement standards, specifications and plans manual. Recommendations in the report shall be incorporated into the design of the subdivision.
   B.   Excavations or Fill Near Jordan River: Subdivision of land adjacent to the Jordan River or its natural tributaries, or within any marsh or wetlands of the Jordan River, which will result in any discharge of excavated or fill materials into the navigable waters of the Jordan River, shall require a permit from any state or federal agency having jurisdiction prior to the issuance of local permits. This determination shall be made as part of the staff review of a preliminary plat. The owner/developer shall comply with the rules, regulations and conditions imposed by any agency having jurisdiction over such channels. (2001 Code § 87-5-113; amd. 2009 Code; Ord. 19-51, 12-11-2019, Effective at 12 noon on January 6, 2020)