18-29-711.1 Horizontal branch connections above or below vertical stack offsets.
   If a horizontal branch connects to the stack within 2 feet (610 mm) above or below a vertical stack offset, and the offset is located more than four branch intervals below the top of the stack, the offset shall be vented in accordance with Section 18-29-915.