Section
General Provisions
153.001 Title
153.002 Jurisdiction
153.003 Authority and purpose
153.004 Interpretation; when plats required
153.005 Definitions
153.006 Official map
153.007 Plat officer
153.008 Variances
153.009 Amendments
153.010 Subdivision review procedure table
153.011 Village corporate limits and street map
153.012 2006 zoning map
153.013 2006 drainage map
153.014 2006 water distribution map
153.015 2006 sanitary sewer map
153.016 Subdivision submittal schematic
Location and Sketch Maps
153.030 Purpose
153.031 Submission requirements
153.032 Subdivision site suitability
153.033 Location and sketch maps review process
153.034 Validity of location and sketch maps approval
153.035 Checklist for location and sketch maps
153.036 Location and sketch maps; flow diagram
Preliminary Plan
153.050 Purpose
153.051 Submission requirements
153.052 Preliminary plan review process
153.053 Village Board action
153.054 Validity of preliminary plan; reaffirmation of preliminary plan
153.055 Checklist for preliminary plan
153.056 Preliminary plan; flow diagram
Construction Plans
153.070 Purpose
153.071 Submission requirements
153.072 Construction plan review process
153.073 Checklist for construction plans
153.074 Construction plans; flow diagram
Construction and Bonding of Public Improvements
153.085 Notification of construction
153.086 Review and inspection fees
153.087 Inspection of construction
153.088 Security for public improvements
153.089 Length security in effect; forfeiture
153.090 Approval of public improvements
153.091 Checklist for construction and bonding
Final Plat
153.105 Purpose
153.106 Submission requirements
153.107 Final plat review process
153.108 Submission of final plat to the Village Board
153.109 Village Board approval
153.110 Recording the final plat
153.111 Acceptance of public improvements
153.112 Sample surveyor’s certificate
153.113 Sample ownership certificate
153.114 Sample drainage certificate
153.115 Sample school district certificate
153.116 Sample tax certificate
153.117 Sample permission to record certificate
153.118 Checklist for final plat
153.119 Final plat; flow diagram
Design Standards and Specifications for Required Public Improvements
153.130 State specifications
153.131 Right-of-way of streets
153.132 Street design
153.133 Lot and block design
153.134 Erosion and sediment control
153.135 Utility easements location of utilities
153.136 Surface water drainage
153.137 Backfill over underground utilities
153.138 Sewage disposal
153.139 Water supply
153.140 Electric distribution
153.141 Street lighting
153.142 Public areas and open spaces
153.143 Sidewalks
Minor Subdivisions
153.155 Purpose
153.156 Location map
153.157 Final plat submission requirements
153.158 Review process
153.159 Submission of minor subdivision plat to the Village Board
153.160 Recording the minor subdivision plat
153.161 Limitations on minor subdivisions
153.162 Checklist for minor subdivision
153.163 Minor subdivision; flow diagram
153.164 Minor subdivision final plat; flow diagram
Site Development
153.175 Purpose
153.176 Submission requirements
153.177 Standard and requirements
153.178 Review process
153.179 Review by the Village Board
153.180 Construction plans
153.181 Construction and securities
153.182 Checklist for site development
153.183 Site development; flow diagram
Tract Survey
153.195 Purpose
153.196 Submission requirements
153.197 Review process
153.198 Recording the tract survey
153.199 Checklist for tract survey
153.999 Penalty