§ 153.035 CHECKLIST FOR LOCATION AND SKETCH MAPS.
   (A)   Submission requirements.
Checklist for Location and Sketch Maps
Yes
No
N/A
Checklist for Location and Sketch Maps
Yes
No
N/A
A. Location map
 
 
 
   1. Suitable scale with one mile radius from proposed tract
 
 
 
   2. North point, scale and date
 
 
 
   3. Outline of the entire area owned or controlled by the subdivider with approximate boundary dimensions and total acreage
 
 
 
   4. Existing streets and roads expected to serve the area to be subdivided
 
 
 
   5. Existing utility lines expected to serve the area to be subdivided
 
 
 
B. Sketch map
 
 
 
   1. General layout for proposed development
 
 
 
   2. North point, scale and date (no more than one inch equals 100 feet)
 
 
 
   3. Area to be subdivided with general dimensions
 
 
 
   4. Proposed street network and alignments with existing streets
 
 
 
   5. General lot layout
 
 
 
   6. Potential open space - public parks, existing waterways, drainage or retention areas and the like
 
 
 
   7. Outstanding or unusual natural features and vegetation
 
 
 
C. Additional information required
 
 
 
   1. Title of the proposed subdivision
 
 
 
   2. Names, addresses and phone numbers of the owner, subdivider, engineer and land surveyor. A contact person should be designated
 
 
 
   3. Proposed use and approximate number of housing units
 
 
 
   4. Existing and proposed zoning
 
 
 
   5. Method of sewage disposal
 
 
 
   6. Method of water supply
 
 
 
   7. Electric service provider
 
 
 
   8. Fire protection district
 
 
 
   9. School district
 
 
 
   10. Gas service provider
 
 
 
   11. Percolation test results (one test per each four lots), if applicable
 
 
 
 
   (B)   Review process.
Checklist for Location and Sketch Maps
Yes
No
N/A
Checklist for Location and Sketch Maps
Yes
No
N/A
A. Subdivider submit nine prints of location and sketch maps with support data to the Village Clerk
 
 
 
B. Village Clerk shall distribute the location and sketch maps with support data as follows
 
 
 
   1. Retain two on file
 
 
 
   2. One to each Village Board member
 
 
 
   3. One to the Village President
 
 
 
C. Subdivider shall submit one print of location and sketch maps with support data to the following
 
 
 
   1. Village Engineer
 
 
 
   2. Village Water, Light and Power (Water Department)
 
 
 
   3. Springfield Metro Sanitary District
 
 
 
   4. Springfield Engineer Department
 
 
 
   5. Springfield Fire Department
 
 
 
   6. Appropriate School District
 
 
 
   7. County Highway Department, if applicable
 
 
 
   8. County Department of Public Health, if applicable
 
 
 
   9. County Soil and Water Conservation, if applicable
 
 
 
   10. Appropriate Township Commissioner, if applicable
 
 
 
   11. State Department of Transportation, if applicable
 
 
 
   12. Any additional utility provider, if applicable
 
 
 
      (List Utility Name):
 
 
 
      (List Utility Name):
 
 
 
      (List Utility Name):
 
 
 
D. Village Clerk received comments within seven calendar days from the following
 
 
 
   1. Each Board member
 
 
 
      A. Board member
 
 
 
      B. Board member
 
 
 
      C. Board member
 
 
 
      D. Board member
 
 
 
      E. Board member
 
 
 
      F. Board member
 
 
 
   2. Village President
 
 
 
   3. Village Engineer
 
 
 
   4. Village Water, Light and Power (Water Department)
 
 
 
   5. Springfield Metro Sanitary District
 
 
 
   6. Springfield Engineer Department
 
 
 
   7. Springfield Fire Department
 
 
 
   8. Appropriate School District
 
 
 
   9. County Highway Department, if applicable
 
 
 
   10. County Department of Public Health, if applicable
 
 
 
   11. County Soil and Water Conservation, if applicable
 
 
 
   12. Appropriate Township Commissioner, if applicable
 
 
 
   13. State Department of Transportation, if applicable
 
 
 
   14. Any additional utility provider, if applicable
 
 
 
      (List Utility Name):
 
 
 
      (List Utility Name):
 
 
 
      (List Utility Name):
 
 
 
E. The Village Clerk compiled comments within two calendar days
 
 
 
F. The Village Clerk shall distribute the compiled comment to the Village Board and Village President to evaluate at a special Board meeting within five calendar days from date of receipt of comments
 
 
 
G. The Village Clerk shall submit comments from special Board meeting to the subdivider 14 calendar days prior to next regular scheduled Board meeting
 
 
 
H. Next regular Board meeting, Village Board shall make recommendations for
 
 
 
   1. Approval
 
 
 
   2. Disapproval
 
 
 
 
CHECKLIST FOR LOCATION AND SKETCH MAPS
COMMENTS:
Completed by: _______________________________________________________________________
Address: ____________________________________________________________________________
Date: _______________________________________________________________________________
Completed Copy to Village Clerk:      Date: ____________________________________________
                  By: _____________________________________________
Date Received: ___________________________________      By: _______________________
                              Village Clerk
(Prior Code, § 153.035) (Ord. 06-01-01, passed 1-9-2006)