(A) Submission requirements.
Checklist for Location and Sketch Maps | Yes | No | N/A |
Checklist for Location and Sketch Maps | Yes | No | N/A |
A. Location map | |||
1. Suitable scale with one mile radius from proposed tract | |||
2. North point, scale and date | |||
3. Outline of the entire area owned or controlled by the subdivider with approximate boundary dimensions and total acreage | |||
4. Existing streets and roads expected to serve the area to be subdivided | |||
5. Existing utility lines expected to serve the area to be subdivided | |||
B. Sketch map | |||
1. General layout for proposed development | |||
2. North point, scale and date (no more than one inch equals 100 feet) | |||
3. Area to be subdivided with general dimensions | |||
4. Proposed street network and alignments with existing streets | |||
5. General lot layout | |||
6. Potential open space - public parks, existing waterways, drainage or retention areas and the like | |||
7. Outstanding or unusual natural features and vegetation | |||
C. Additional information required | |||
1. Title of the proposed subdivision | |||
2. Names, addresses and phone numbers of the owner, subdivider, engineer and land surveyor. A contact person should be designated | |||
3. Proposed use and approximate number of housing units | |||
4. Existing and proposed zoning | |||
5. Method of sewage disposal | |||
6. Method of water supply | |||
7. Electric service provider | |||
8. Fire protection district | |||
9. School district | |||
10. Gas service provider | |||
11. Percolation test results (one test per each four lots), if applicable | |||
(B) Review process.
Checklist for Location and Sketch Maps | Yes | No | N/A |
Checklist for Location and Sketch Maps | Yes | No | N/A |
A. Subdivider submit nine prints of location and sketch maps with support data to the Village Clerk | |||
B. Village Clerk shall distribute the location and sketch maps with support data as follows | |||
1. Retain two on file | |||
2. One to each Village Board member | |||
3. One to the Village President | |||
C. Subdivider shall submit one print of location and sketch maps with support data to the following | |||
1. Village Engineer | |||
2. Village Water, Light and Power (Water Department) | |||
3. Springfield Metro Sanitary District | |||
4. Springfield Engineer Department | |||
5. Springfield Fire Department | |||
6. Appropriate School District | |||
7. County Highway Department, if applicable | |||
8. County Department of Public Health, if applicable | |||
9. County Soil and Water Conservation, if applicable | |||
10. Appropriate Township Commissioner, if applicable | |||
11. State Department of Transportation, if applicable | |||
12. Any additional utility provider, if applicable | |||
(List Utility Name): | |||
(List Utility Name): | |||
(List Utility Name): | |||
D. Village Clerk received comments within seven calendar days from the following | |||
1. Each Board member | |||
A. Board member | |||
B. Board member | |||
C. Board member | |||
D. Board member | |||
E. Board member | |||
F. Board member | |||
2. Village President | |||
3. Village Engineer | |||
4. Village Water, Light and Power (Water Department) | |||
5. Springfield Metro Sanitary District | |||
6. Springfield Engineer Department | |||
7. Springfield Fire Department | |||
8. Appropriate School District | |||
9. County Highway Department, if applicable | |||
10. County Department of Public Health, if applicable | |||
11. County Soil and Water Conservation, if applicable | |||
12. Appropriate Township Commissioner, if applicable | |||
13. State Department of Transportation, if applicable | |||
14. Any additional utility provider, if applicable | |||
(List Utility Name): | |||
(List Utility Name): | |||
(List Utility Name): | |||
E. The Village Clerk compiled comments within two calendar days | |||
F. The Village Clerk shall distribute the compiled comment to the Village Board and Village President to evaluate at a special Board meeting within five calendar days from date of receipt of comments | |||
G. The Village Clerk shall submit comments from special Board meeting to the subdivider 14 calendar days prior to next regular scheduled Board meeting | |||
H. Next regular Board meeting, Village Board shall make recommendations for | |||
1. Approval | |||
2. Disapproval | |||
CHECKLIST FOR LOCATION AND SKETCH MAPS
COMMENTS:
Completed by: _______________________________________________________________________
Address: ____________________________________________________________________________
Date: _______________________________________________________________________________
Completed Copy to Village Clerk: Date: ____________________________________________
By: _____________________________________________
Date Received: ___________________________________ By: _______________________
Village Clerk
(Prior Code, § 153.035) (Ord. 06-01-01, passed 1-9-2006)