Checklist for Construction and Bonding | Yes | No | N/A |
Checklist for Construction and Bonding | Yes | No | N/A |
A. General | |||
1. The Village Engineer has inspected the construction and all necessary repairs and corrections, and certifies that the public improvements required by this chapter have been constructed | |||
2. “As built plans” have been prepared by the subdivider’s engineer and delivered to the Village Engineer | |||
3. The Village Engineer has received a signed statement of a registered professional engineer stating that the public improvements have been observed during construction and are installed to the specifications shown on the construction plans | |||
4. The improvements, such as drainage swales and the like, which are not to be dedicated to public use but which benefit the subdivision generally, have been built to specifications shown in the construction plans | |||
B. Approval | |||
C. Disapproval | |||
COMMENTS:
Completed by: _______________________________________________________________________
Address: ____________________________________________________________________________
Date: ________________________________________________________________________________
Completed Copy to Village Clerk: Date: _____________________________
By: ______________________________
Date Received: ________________________ By: ______________________________
Village Clerk
(Prior Code, § 153.091) (Ord. 06-01-01, passed 1-9-2006)