Section
Sanitary Sewage; Public Water Supply
1. General
2. Pre-design conference
3. Utility coordination
4. Construction
5. Plans, specifications, and cost
6. Start of construction
7. Completion of construction
8. Off-site pollution protection
9. Inspection
10. Transfer of private ownership
11. Property ownership
12. Minimum design standards for new utilities
13. Utility accommodation
14. Contracts with subdivision developers
15. Service requirements
16. Water quality
17. Water pressure
18. Metering water use
19. Mandatory connection
20. Connection of building
21. Building permits and subdivision plats
22. Connection responsibility and costs
23. Rules and regulations
24. Right of entry for investigation and inspection
25. Exceptions
26. Penalty
Effluent Disposal Policy
35. Definitions
36. Approval of City Commission required for disposal of effluent generated outside city
37. Effluent generated within city to be disposed of at approved site; manner of disposal
38. Plan for effluent disposal system
39. Rules and regulations for effluent disposal
40. Powers of City Commission
41. Conflicting provisions
42. Variances
43. Minimum requirements
44. Existing laws
Waterline Project Engineering Requirements
55. Approval
56. Scope and intent
57. Variances, waivers, and amendments
58. Trade names of materials
59. Conflicting regulations
60. General procedures and requirements
61. Application
62. Sheeting and bracing materials
63. Workmanship
64. Minimum standards
65. Crossing requirements
66. Permit documents and data
67. Casing pipe materials and installation
68. Application
69. Pipe fittings
70. Valves
71. Installation
72. Application
73. Design standards
74. Standard requirements
75. Testing
76. Disinfecting
77. Penalty
Cross-reference: