The size, slope, alignment and materials of construction of a building sewer, and the methods to be used in excavating, placing the pipe, jointing, testing or backfilling the trench, shall conform to the requirements of the Building and Plumbing Codes or other applicable rules and regulations of the village. In the absence of Code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Standard for Test-Materials and Water Pollution Control Federation Manual of Practice No. 9, as amended, shall apply.
(`80 Code, § 1032.05) (Ord. 1584, passed 10-18-82)