Where earthquake loads are applicable in accordance with the Chicago Building Code, plumbing piping supports, anchorage and bracing shall be designed and installed for seismic forces in accordance with Chapter 14B-16.
(Amend Coun. J. 10-14-21, p. 37722, Art. III, § 16)
Pipe shall be supported in accordance with Table 18-29-308.5.
Piping Material | Maximum Horizontal Spacing (feet) | Maximum Vertical Spacing (feet) |
Cast-iron pipe | 5 a | 15 |
Copper or copper-alloy pipe | 12 | 10 |
Copper or copper-alloy tubing, 1 1/4-inch diameter and smaller | 6 | 10 |
Copper or copper-alloy tubing, 1 1/2-inch diameter and larger | 10 | 10 |
Polyvinyl chloride (PVC) pipe | 4 | 10 b |
Stainless steel drainage systems | 10 | 10 b |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
a. The maximum horizontal spacing of cast-iron pipe hangers shall be increased to 10 feet where 10-foot lengths of pipe are installed.
b. For sizes 2 inches and smaller, a guide shall be installed midway between required vertical supports. Such guides shall prevent pipe movement in a direction perpendicular to the axis of the pipe.
(Amend Coun. J. 3-27-02, p. 82090, § 3; Amend Coun. J. 10-14-21, p. 37722, Art. III, § 17)
For pipe sizes greater than 4 inches (100 mm), restraints shall be provided for drain pipes at all changes in direction and at all changes in diameter greater than two pipe sizes. Braces, blocks, rodding and other suitable methods as specified by coupling manufacturer shall be utilized.
In buildings more than 150 ft (45.75 m) in height, all vertical lines of piping shall be provided with swing sections or traverse joints or other device which shall absorb the strains or stresses due to the expansion and contraction or vibration of the vertical pipe lines.