18-29-308.8.1 Vertical expansion.
   In buildings more than 150 ft (45.75 m) in height, all vertical lines of piping shall be provided with swing sections or traverse joints or other device which shall absorb the strains or stresses due to the expansion and contraction or vibration of the vertical pipe lines.