Skip to code content (skip section selection)
Compare to:
Chicago Overview
Municipal Code of Chicago
MUNICIPAL CODE OF CHICAGO
TITLE 1 GENERAL PROVISIONS
TITLE 2 CITY GOVERNMENT AND ADMINISTRATION
TITLE 3 REVENUE AND FINANCE
TITLE 4 BUSINESSES, OCCUPATIONS AND CONSUMER PROTECTION
TITLE 5 HOUSING AND ECONOMIC DEVELOPMENT
TITLE 6 HUMAN RIGHTS*
TITLE 7 HEALTH AND SAFETY
TITLE 8 OFFENSES AFFECTING PUBLIC PEACE, MORALS AND WELFARE
TITLE 9 VEHICLES, TRAFFIC AND RAIL TRANSPORTATION
TITLE 10 STREETS, PUBLIC WAYS, PARKS, AIRPORTS AND HARBORS
TITLE 11 UTILITIES AND ENVIRONMENTAL PROTECTION
TITLE 12 RESERVED
TITLE 13 BUILDINGS AND CONSTRUCTION
TITLE 14 RESERVED*
TITLE 14A ADMINISTRATIVE PROVISIONS OF THE CHICAGO CONSTRUCTION CODES*
TITLE 14B BUILDING CODE*
TITLE 14C CONVEYANCE DEVICE CODE*
TITLE 14E ELECTRICAL CODE*
TITLE 14F FIRE PREVENTION CODE*
TITLE 14G FUEL GAS CODE*
TITLE 14M MECHANICAL CODE*
TITLE 14N 2022 ENERGY TRANSFORMATION CODE*
TITLE 14P PLUMBING CODE*
TITLE 14R BUILDING REHABILITATION CODE*
TITLE 14X MINIMUM REQUIREMENTS FOR EXISTING BUILDINGS*
TITLE 15 FIRE PREVENTION
TITLE 16 LAND USE
TITLE 17 CHICAGO ZONING ORDINANCE
TITLE 18 BUILDING INFRASTRUCTURE
CHAPTER 18-11 RESERVED*
CHAPTER 18-13 RESERVED*
CHAPTER 18-14 BUILDING ENERGY USE BENCHMARKING
CHAPTER 18-27 RESERVED*
CHAPTER 18-28 MECHANICAL SYSTEMS*
CHAPTER 18-29 PLUMBING*
Article 1. Administration (18-29-101 et seq.)
Article 2. Definitions (18-29-201 et seq.)
Article 3. General Regulations (18-29-301 et seq.)
18-29-301 General.
18-29-301.1 Scope.
18-29-301.1.1 Reserved.
18-29-301.1.2 Reserved.
18-29-301.2 System installation.
18-29-301.3 Connections to drainage system.
18-29-301.4 Connections to water supply.
18-29-301.5 Pipe, tube and fitting sizes.
18-29-301.6 Prohibited locations.
18-29-301.7 Conflicts.
18-29-302 Exclusion of Materials Detrimental to the Sewer System.
18-29-302.1 Detrimental or dangerous materials.
18-29-302.2 Industrial wastes.
18-29-303 Materials.
18-29-303.1 Identification.
18-29-303.2 Installation of materials.
18-29-303.3 Plastic pipe, fittings and components.
18-29-303.4 Third-party certification.
18-29-303.4.1 Reserved.
18-29-303.4.2 Reserved.
18-29-303.4.2.1 Reserved.
18-29-303.4.2.2 Reserved.
18-29-303.4.2.3 Reserved.
18-29-303.5 Cast-iron soil pipe, fittings and components.
18-29-304 Rodent-Proofing.
18-29-304.1 General.
18-29-304.2 Strainer plates.
18-29-304.3 Meter boxes.
18-29-304.4 Openings for pipes.
18-29-305 Protection of Pipes and Plumbing System Components.
18-29-305.1 Protection against contact.
18-29-305.2 Reserved.
18-29-305.3 Stress and strain.
18-29-305.4 Reserved.
18-29-305.5 Pipes through or under footings or foundation walls.
18-29-305.6 Freezing.
18-29-305.6.1 Sewer depth.
18-29-305.6.2 Water main depth.
18-29-305.7 Waterproofing of openings.
18-29-305.8 Protection against physical damage.
18-29-305.9 Protection of components of plumbing system.
18-29-306 Trenching, Excavation and Backfill.
18-29-306.1 Support of piping.
18-29-306.2 Trenching and bedding.
18-29-306.2.1 Overexcavation.
18-29-306.2.2 Rock removal.
18-29-306.2.3 Soft loadbearing materials.
18-29-306.3 Backfilling.
18-29-306.4 Tunneling.
18-29-306.5 Reserved.
18-29-307 Structural Safety.
18-29-307.1 General.
18-29-307.2 Cutting, notching or boring of holes.
18-29-307.3 Penetrations of floor/ceiling assemblies and fire-resistance-rated assemblies.
18-29-307.4 Protection of footings.
18-29-307.5 Alterations to trusses.
18-29-307.6 Piping material exposed within plenums.
18-29-308 Piping Support.
18-29-308.1 General.
18-29-308.2 Piping seismic supports.
18-29-308.3 Materials.
18-29-308.4 Structural attachment.
18-29-308.5 Interval of support.
18-29-308.6 Sway bracing.
18-29-308.7 Anchorage.
18-29-308.7.1 Location.
18-29-308.8 Expansion joint fittings.
18-29-308.8.1 Vertical expansion.
18-29-308.9 Stacks.
18-29-308.10 Parallel water distribution systems.
18-29-308.11 Thermal expansion tanks.
18-29-309 Floodproofing.
18-29-309.1 General.
18-29-309.1.1 Base flood elevation.
18-29-309.2 Deliberately omitted.
18-29-310 Washroom and Toilet Room Requirements.
18-29-310.1 Light and ventilation.
18-29-310.2 Location of fixtures and compartments.
18-29-310.3 Interior finish.
18-29-310.4 Reserved.
18-29-311 Toilet Facilities for Workers.
18-29-311.1 General.
18-29-312 Tests and Inspections.
18-29-312.1 Required tests.
18-29-312.2 Drainage and vent water test.
18-29-312.3 Deliberately omitted.
18-29-312.4 Deliberately omitted.
18-29-312.5 Water supply system test.
18-29-312.6 Gravity sewer test.
18-29-312.7 Forced sewer test.
18-29-312.8 Storm drainage system test.
18-29-312.9 Cross connection control device inspections.
18-29-313 Equipment Efficiencies.
18-29-313.1 General.
18-29-314 Condensate Disposal.
18-29-314.1 Fuel-burning appliances.
18-29-314.2 Evaporators and cooling coils.
18-29-314.2.1 Condensate disposal.
18-29-314.2.2 Drain pipe materials and sizes.
18-29-314.2.3 Auxiliary and secondary drain systems.
18-29-314.2.3.1 Water-level monitoring devices.
18-29-314.2.3.2 Appliance, equipment and insulation in pans.
18-29-314.2.4 Traps.
18-29-314.2.4.1 Ductless mini-split system traps.
18-29-314.2.5 Drain line maintenance.
18-29-315 Penetrations.
18-29-315.1 Sealing of annular spaces.
Article 4. Fixtures, Faucets and Fixture Fittings (18-29-401 et seq.)
Article 5. Water Heaters (18-29-501 et seq.)
Article 6. Water Supply and Distribution (18-29-601 et seq.)
Article 7. Sanitary Drainage (18-29-701 et seq.)
Article 8. Indirect/Special Waste (18-29-801 et seq.)
Article 9. Vents (18-29-901 et seq.)
Article 10. Traps, Separators and Interceptors (18-29-1001 et seq.)
Article 11. Storm Drainage (18-29-1101 et seq.)
Article 12. Swimming Pools and Other Swimming Facilities* (18-29-1201 et seq.)
Article 13. Referenced Standards
Appendix A Procedures for Calculating the Minimum Sizing of the Water Supply System
CHAPTER 18-30 RESERVED*
CHAPTER 18-31 RESERVED*
CHAPTER 18-32 RESERVED*
CHAPTER 18-36 REFERENCE STANDARDS*
APPENDIX TO THE MUNICIPAL CODE OF CHICAGO (RESERVED)*
TABLES
Chicago Zoning Ordinance and Land Use Ordinance
Loading...
18-29-306 Trenching, Excavation and Backfill.
18-29-306.1 Support of piping.
   Buried piping shall be supported throughout its entire length.
18-29-306.2 Trenching and bedding.
   Where trenches are excavated such that the bottom of the trench forms the bed for the pipe, solid and continuous loadbearing support shall be provided between joints. Bell holes, hub holes and coupling holes shall be provided at points where the pipe is joined. Such pipe shall not be supported on blocks to grade. In instances where the material manufacturer's installation instructions are more restrictive than those prescribed by this chapter, the material shall be installed in accordance with the more restrictive requirement.
(Amend Coun. J. 10-14-21, p. 37722, Art. III, § 9)
18-29-306.2.1 Overexcavation.
   Where trenches are excavated below the installation level of the pipe such that the bottom of the trench does not form the bed for the pipe, the trench shall be backfilled to the installation level of the bottom of the pipe with sand or fine gravel placed in layers of 6 inches (150 mm) maximum depth and such backfill shall be compacted after each placement.
18-29-306.2.2 Rock removal.
   Where rock is encountered in trenching, it shall be removed to a minimum of 3 inches (75 mm) below the installation level of the bottom of the pipe, and the trench shall be backfilled to the installation level of the bottom of the pipe with sand tamped in place so as to provide uniform loadbearing support for the pipe between joints. The pipe, including the joints, shall not rest on rock at any point.
18-29-306.2.3 Soft loadbearing materials.
   If soft materials of poor loadbearing qualities are found at the bottom of the trench, stabilizing shall be achieved by overexcavating a minimum of two pipe diameters and backfilling to the installation level of the bottom of the pipe with fine gravel, crushed stone or a concrete foundation. The concrete foundation shall be bedded with sand tamped in place so as to provide uniform loadbearing support for the pipe between joints.
18-29-306.3 Backfilling.
   Backfill shall be free from discarded construction material and debris. Loose earth, free from rocks, broken concrete, frozen chunks and other rubble, shall be placed in the trench in 6-inch (150 mm) layers and tamped in place until the crown of the pipe is covered by 12 inches (305 mm) of tamped earth. The backfill under and beside the pipe shall be compacted for pipe support. Backfill shall be brought up evenly on both sides of the pipe so that the pipe remains aligned. In instances where the manufacturer's installation instructions are more restrictive than those prescribed by this chapter, the material shall be installed in accordance with the more restrictive requirement.
(Amend Coun. J. 10-14-21, p. 37722, Art. III, § 10)
18-29-306.4 Tunneling.
   Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from subsequent uneven loading. Where earth tunnels are used, adequate supporting structures shall be provided to prevent future settling or caving.
18-29-306.5 Reserved.
Editor's note – Coun. J. 10-14-21, p. 37722, Art. III, § 11, repealed § 18-29-306.5, which pertained to violations – penalties.
Loading...