Skip to code content (skip section selection)
Compare to:
Chicago Overview
Prior Chicago Building Code
BUILDING CODE AND RELATED EXCERPTS OF THE MUNICIPAL CODE OF CHICAGO
DIVISION 1 - ADMINISTRATION
DIVISION 2 - DEFINITIONS
DIVISION 3 - USE AND OCCUPANCY CLASSIFICATIONS
Subdivision 302 - Classification
Subdivision 303 - Assembly
CHAPTER 13-84 ASSEMBLY UNITS
13-84-010 General requirements.
13-84-020 Capacity of schools.
13-84-030 Frontage requirements.
13-84-040 Special height limitations.
13-84-050 Special enclosures and separations.
13-84-060 Special fire-resistive requirements.
13-84-070 Definitions.
13-84-080 Construction requirements - Type 1 stages.
13-84-090 Construction requirements - Type 2 stages.
13-84-100 Stage vents - Type 1 stages.
13-84-110 Proscenium opening - Type 1 stages.
13-84-120 Projection rooms.
13-84-130 Bowling alleys.
13-84-140 Planning requirements for Type I schools.
13-84-150 Planning requirements for Type III schools.
13-84-160 Special exit requirements.
13-84-170 Minimum number of exits.
13-84-180 Width of exits.
13-84-190 Location of exits.
13-84-200 Exit connections.
13-84-210 Exit courts and exit passageways.
13-84-220 Waiting spaces.
13-84-230 Aisles and seating.
13-84-240 Railings.
13-84-250 Ramps and steps.
13-84-260 Exits from stage block.
13-84-270 Fixed seating.
13-84-280 Schools for handicapped children - Elevator requirements.
13-84-290 Accessibility for handicapped.
13-84-300 Exhibition areas in excess of 10,000 square feet.
13-84-310 Automatic smoke and heat vents - Requirements for topmost occupied levels.
13-84-320 Noncombustible draft curtains - Where required.
13-84-330 Automatic smoke and heat vents - Requirements for lower floor levels.
13-84-331 Special requirement for nightclubs and restaurants.
13-84-340 Exhibition area minimum aisle width.
13-84-350 Smoke detectors.
13-84-351 Temporary display booths.
13-84-360 Storage of combustible containers.
13-84-370 Open plan schools - Individual plan floor areas.
13-84-380 Stair enclosures.
13-84-390 Fire guard requirements.
13-84-400 Floor plan diagram to be submitted to department of buildings.
13-84-410 Building capacity - Signs to be posted.
13-84-420 Building capacity - Approval required.
13-84-430 Exit and aisle regulations.
CHAPTER 13-88 OPEN AIR ASSEMBLY UNITS
Subdivision 304 - Business
Subdivision 306 - Factory
Subdivision 307 - High-Hazard
Subdivision 308 - Institutional
Subdivision 309 - Mercantile
Subdivision 310 - Residential
Subdivision 311 - Storage
Subdivision 312 - Utility and Miscellaneous
DIVISION 4 - SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
DIVISION 5 - GENERAL BUILDING HEIGHTS AND AREAS
DIVISION 6 - TYPES OF CONSTRUCTION
DIVISION 7 - FIRE-RESISTANCE-RATED CONSTRUCTION
DIVISION 8 - INTERIOR FINISHES (NA)
DIVISION 9 - FIRE PROTECTION SYSTEMS
DIVISION 10 - MEANS OF EGRESS
DIVISION 11 - ACCESSIBILITY
DIVISION 12 - INTERIOR ENVIRONMENT
DIVISION 13 - ENERGY EFFICIENCY AND ENVIRONMENTAL PROTECTION
DIVISION 14 - EXTERIOR WALLS (NA)
DIVISION 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES (NA)
DIVISION 16 - STRUCTURAL DESIGN
DIVISION 17 - STRUCTURAL TESTS AND SPECIAL INSPECTIONS
DIVISION 18 - SOILS AND FOUNDATIONS
DIVISION 19 - CONCRETE
DIVISION 20 - ALUMINUM (NA)
DIVISION 21 - MASONRY
DIVISION 22 - STEEL
DIVISION 23 - WOOD
DIVISION 24 - GLASS AND GLAZING (NA)
DIVISION 25 - GYPSUM BOARD AND PLASTER (NA)
DIVISION 26 - PLASTIC (NA)
DIVISION 27 - ELECTRICAL
DIVISION 28 - MECHANICAL SYSTEMS
DIVISION 29 - PLUMBING SYSTEMS
DIVISION 30 - ELEVATORS AND CONVEYING SYSTEMS
DIVISION 31 - SPECIAL CONSTRUCTION (NA)
DIVISION 32 - ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
DIVISION 33 - SAFEGUARDS DURING CONSTRUCTION
DIVISION 34 - EXISTING STRUCTURES
DIVISION 35 - REFERENCED STANDARDS

You are viewing an archived code

Loading...
13-84-020  Capacity of schools.
   The total capacity of a school shall be determined in accordance with the occupancy content factors established in Section 13-56-310, except that rooms not used or used only occasionally by students shall not be included in computing each total capacity. Such rooms and spaces include the following:
   Assembly rooms and gymnasiums;
   Cafeterias and lunchrooms;
   Locker, toilet and storage rooms;
   Corridors and other circulation space;
   Service and equipment rooms.
(Prior code § 54-2)
13-84-030  Frontage requirements.
   Every assembly unit shall have frontage upon one or more open spaces consisting of streets not less than 30 feet wide or public alleys or other open spaces not less than ten feet wide which lead directly to a street. Frontage requirements shall be determined according to capacity and shall comply with the requirements established in Table 13-84-030 as set out in this section.
Table 13-84-030
Frontage Required for Assembly Units
 
Capacity Frontage
Frontage
Type I Schools
Other Assembly Units
On Street
On Street or Other Open Space
200 or less
One side
501 or less
200 to 800
One side
One side
501 to 1,000
More than 800
One side
Two sides
1,001 to 2,500
Two sides
One side
More than 2,500
Three sides
One side
 
(Prior code § 54-3)
13-84-040  Special height limitations.
   (a)   The main seating level of every theater shall be so located that normal exits from the foyer shall lead to a public street without change in level other than by means of ramps having a slope not exceeding one in 10.
   (b)   No seating level in rooms used for assembly occupancy and having a capacity of more than 300 persons shall be at a level more than 20 feet above grade except in buildings of Types I-A or I-B construction.
   (c)   No assembly occupancy shall be located at a level more than 20 feet below grade in buildings of Types I-A or I-B construction, nor more than ten feet below grade in buildings of other types of construction.
(Prior code § 54-4)
13-84-050  Special enclosures and separations.
   (a)   The floor construction and enclosing partitions of assembly rooms having a capacity exceeding 300 persons shall be of construction providing fire resistance of not less than two hours.
   (b)   The floor construction and enclosing partitions of assembly rooms having a capacity not exceeding 300 persons shall be of construction providing fire resistance of not less than one hour.
   (c)   Partitions, floor constructions and ceiling construction enclosing all public corridors of assembly units shall be of construction providing fire resistance of not less than one hour.
   (d)   Floor construction over basements of Type III schools shall comply with Section 13-60-200 of this Code.
(Prior code § 54-5)
13-84-060  Special fire-resistive requirements.
   Every assembly unit hereafter erected shall comply with special fire-resistive requirements as provided in Sections 13-84-070 to 13-84-130, inclusive.
(Prior code § 54-6)
13-84-070  Definitions.
   The terms used in this section are hereby defined as follows:
   (a)   Stage. “Stage” means the space in a theater or assembly room separated from the auditorium equipped for theatrical or similar performances that provide for the use of curtains, portable or fixed scenery, lights, or mechanical appliances.
   Recesses at the front of an auditorium used or designed solely for the mounting of a motion picture screen and its required sound equipment containing no fixed or movable scenery other than curtains of flame- resistive material shall not be deemed to be a stage under the requirements of this section.
   (b)   Type 1 Stage. “Type 1 stage” means every stage other than a Type 2 stage as defined in paragraph (c).
   (c)   Type 2 Stage. “Type 2 stage” means a stage complying with each of the following conditions:
      (1)   The stage shall be located in a school, church, community building, club or similar occupancy in which the use of the stage for theatrical productions is occasional.
      (2)   The capacity of such assembly rooms shall not exceed 1,000 persons.
      (3)   The proscenium opening between the stage and the auditorium shall not exceed 32 feet in width nor 22 feet in height.
      (4)   All stage material, scenery, decorations, drapes and curtains shall be of noncombustible materials.
   (d)   Stage Block. “Stage block” means that portion of a theater or assembly room containing only the stage or the stage in combination with dressing rooms, storage and property rooms, workshops and other rooms appurtenant to the operation thereof.
   (e)   Projection Block. “Projection block” means that portion of a theater or assembly room containing a projection room alone or in combination with other rooms appurtenant to the operation thereof.
   (f)   Dressing Room. “Dressing room” means a room used or intended to be used by a performer or performers for dressing or changing of clothing.
   (g)   Proscenium. “Proscenium” means the vertical plane of separation between an auditorium and a stage.
   (h)   Property Room. “Property room” means a room for the storage of any adjunct of a theatrical or similar performance, except scenery, commonly known and described as stage properties.
   (i)   Stage Workshop. “Stage workshop” means any shop or room in which carpentry, electrical work, painting, or any other work incidental to the preparation, operation, or maintenance of any stage is done.
   (j)   Storage Room. “Storage room” means a room other than a property room used for storage purposes.
(Prior code § 54-6.1)
Loading...