701.4.1.1 (7.4.1.1) On-Site Renewable Energy Systems (Optional). When chosen to be complied with, building projects shall comply with either the Standard Renewables Approach in Section 701.4.1.1.1 (7.4.1.1.1) or the Alternate Renewables Approach in Section 701.4.1.1.2 (7.4.1.1.2). When complied with, this can be considered as equivalency to a Renewable Energy EA Credit in Normative Appendix E, Table E101.1.
(Ord. 9-23, 3-7-2023)
Amend exception 2, of section 801.3.1.8 (8.3.1.8) as follows:
2. Entrances that employ an entryway floor system that is not less than 4 ft. (1.3 m) in length to provide access to spaces that are less than 3,000 ft2 (300 m2) in area.
(Ord. 9-23, 3-7-2023)
801.3.3 (8.3.3) Acoustical Control. The provisions of this section shall govern acoustical control for the interior spaces within the building or structure for interior sound transmission.
Other elements specified in this section, such as the building envelope and the design of the related mechanical equipment and systems, are provided as designer options.
Designs shall be in compliance with Sections 801.3.3.1 (8.3.3.1) through 801.3.3.5 (8.3.3.5).
(Ord. 9-23, 3-7-2023)
801.3.4 (8.3.4) Soil-Gas Control. In known areas, per the Idaho Department of Health and Welfare, where elevated soil-gas may be present, soil-gas entry into enclosed spaces that are immediately above crawlspaces, slabs-on-grade, and basement slabs shall be controlled in accordance with Sections 801.3.4.1 (8.3.4.1) or 801.3.4.2 (8.3.4.2).
Exceptions:
1. Buildings or portions thereof that are not routinely occupied, such as warehouses and parking structures.
2. Ventilated garages that comply with ANSI/ASHRAE Standard 62.1, Sections 5.15 and 6.5.
(Ord. 9-23, 3-7-2023)