Loading...
9-13-56: IGCC GREEN CONSTRUCTION CODE AMENDMENT, SECTION 901.3.4 (9.3.4), AREAS FOR STORAGE AND COLLECTION OF RECYCLABLES AND DISCARDED GOODS:
   901.3.4 (9.3.4) Areas for Storage and Collection of Recyclables and Discarded Goods. Areas for recyclables and discarded goods shall be provided as described in this section. These areas shall be coordinated with the anticipated collection services to maximize the effectiveness of the dedicated areas. Instructions regarding the identification and handling of recyclables and discarded goods in these areas shall be posted in or adjacent to each dedicated area. Recycling areas shall be designed and constructed in accordance with the City of Boise Solid Waste Ordinance.
(Ord. 9-23, 3-7-2023)
9-13-57: IGCC GREEN CONSTRUCTION CODE AMENDMENT, DELETE SECTION 901.3.4.3 (9.3.4.3), FLUORESCENT AND HIGH-INTENSITY DISCHARGE (HID) LAMPS AND BALLASTS:
Delete section 901.3.4.3 (9.3.4.3), Fluorescent and High-Intensity Discharge (HID) Lamps and Ballasts. (Ord. 9-23, 3-7-2023)
9-13-58: IGCC GREEN CONSTRUCTION CODE AMENDMENT, DELETE SECTION 901.3.4.4 (9.3.4.4), ELECTRONICS AND BATTERIES:
Delete section 901.3.4.4 (9.3.4.4), Electronics and Batteries. (Ord. 9-23, 3-7-2023)
9-13-59: IGCC GREEN CONSTRUCTION CODE AMENDMENT, ADD SECTION 1001.1.1, FUNCTIONAL AND PERFORMANCE TESTING PROVIDER AND COMMISSIONING PROVIDER:
   1001.1.1 Functional and Performance Testing Provider and Commissioning Provider. The registered design professional in responsible charge, engineers independent from the design of the project, an approved commissioning provider, qualified designers experienced with a designated system, owner's qualified employees, or any combination thereof, shall perform functional and performance testing activities, as required by this Chapter.
   The registered design professional in responsible charge, engineers independent from the design of the project, an approved commissioning provider, or any combination thereof, shall perform building commissioning and testing activities, as required by this Chapter.
(Ord. 9-23, 3-7-2023)
9-13-60: IGCC GREEN CONSTRUCTION CODE AMENDMENT, ADD SECTION 1001.1.2, QUALIFICATIONS:
   1001.1.2 Qualifications. Personnel employed as a functional and performance testing provider or as an approved commissioning provider shall demonstrate competence, qualifications, and experience to the satisfaction of the code official. This includes having certifications such as from AABC Commissioning Group (ACG), American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE), National Environmental Balancing Bureau (NEBB), Association of Energy Engineers (AEE), Building Commissioning Association (BCXA), or equivalent.
   Professional architects or engineers conducting commissioning and/or testing shall be licensed with the State of Idaho, including in the applicable discipline for the type of work being commissioned and/or tested.
   Documentation outlining qualifications, experience, and copies of certifications or licenses shall be provided to the code official for acceptance.
(Ord. 9-23, 3-7-2023)
9-13-61: IGCC GREEN CONSTRUCTION CODE AMENDMENT, SECTION 1001.3.1.1.2.1 (10.3.1.1.2.1), ACOUSTICAL FIELD MEASUREMENT:
   1001.3.1.1.2 (10.3.1.1.2) Acoustical Field Measurement. As required by Chapter 8 (Section 8), the FPT specified in Section 1001.3.1.1.2.1.2 (10.3.1.1.2.1.2), Interior Sound Transmission, testing shall be completed.
   Other elements specified in Section 1001.3.1.1.2.1.1 (10.3.1.1.2.1.1), Interior Background Sound Levels, and Section 1001.3.1.1.2.1.3 (10.3.1.1.2.1.3), Property Line Sound, testing shall be completed when the designer chooses these as options in the design.
(Ord. 9-23, 3-7-2023)
Loading...