9-13-44: IGCC GREEN CONSTRUCTION CODE AMENDMENT, SECTION 701.3.4 (7.3.4), AUTOMATED DEMAND RESPONSE (OPTIONAL):
   701.3.4 (7.3.4) Automated Demand Response (Optional). When chosen to be complied with, building projects may contain automatic control systems that have the capability to reduce building equipment loads to lower electric peak demand of the building.
   The building controls may be designed with automated demand-response (DR) infrastructure capable of receiving DR requests from the utility, electrical system operator, or third-party DR program provider and automatically implementing load adjustments to the HVAC and lighting systems. Consult with local utility company for any possible eligibility requirements.
(Ord. 9-23, 3-7-2023)