CHAPTER 53: WATER, SEWERS, AND SEWAGE DISPOSAL
Section
General Provisions
   53.001   Excavations; water
   53.002   Trench specifications
   53.003   Excavations; sewers
Sewers
   53.015   Supervision and specifications
   53.016   Tapping
   53.017   Connections
   53.018   Rates
   53.019   Lifts
Water; Generally
   53.030   Definition
   53.031   Application for service; deposits
   53.032   Work on mains; restrictions
   53.033   Work on mains; permits required
   53.034   Duty of Water Superintendent to report taps
   53.035   Liability
   53.036   Right of entry for inspection; other powers of city officials
   53.037   Tampering prohibited
   53.038   Individual service required
   53.039   Breaking seals
   53.040   Charges
   53.041   Shutting off; sewer repair
   53.042   Shutting off; other repairs and the like
   53.043   Right of city to limit use
Water; Service Pipes
   53.055   Installation
   53.056   Testing of pipes
   53.057   Service pipes; protection from frost
   53.058   Stop boxes
   53.059   Curb boxes
   53.060   Cutoffs and reconnections
   53.061   Leaking service pipes
   53.062   Pipes and fixtures; owner responsible
   53.063   Duty of plumbers to turn water on and off
   53.064   Cross-connections prohibited
   53.065   Meter pits
Water Rates and Charges
   53.075   Rates
   53.076   Monthly collections; delinquency
   53.077   Turn-on charges
Water Meters
   53.090   Required
   53.091   Water meter install
   53.092   Access
   53.093   Reading
   53.094   Estimates; where permitted
   53.095   Consumer’s responsibility
   53.096   Meters; setting
   53.097   Valves between meters and boilers
   53.098   Insulation required
Waste Water System; User Service Charge
   53.110   Purpose
   53.111   Determining the total annual cost of administration and operation and maintenance
   53.112   Determining each user’s waste water classification
   53.113   Determining estimated waste water loads for each classification of user
   53.114   Determining the total estimated number of users connected to the waste water system
   53.115   Determining the waste water system administrative cost service charge
   53.116   Determining the waste water system operation and maintenance service charge
   53.117   Determining each user’s total waste water service charge
   53.118   Payment of the user’s waste water service charge and penalties
   53.119   Review of each user’s waste water service charge
   53.120   Notification
   53.121   Wastes prohibited from being discharged to the waste water treatment system
   53.122   Prohibition of clear water connections
   53.123   Proper design and construction of new sewers and connections
Storm Drainage
   53.135   Storm drainage fee
   53.136   Collection
   53.137   Fund established
   53.138   Annual review
 
   53.999   Penalty