Section
Sewer Construction and Connections
Part A: Requirement for Connections; Cost of Construction
53.001 Property owner to make connection to sewer on abutting street or alley
53.002 Authority for borough to make connection and collect cost from property owner
53.003 Deposit required prior to construction of sewer line
53.004 Borough not required to construct sewer line following petition and deposit
Part B: Connection Procedures and Standards
53.015 Adequacy of sewer connections and drains
53.016 Work to be inspected; notice of readiness for inspection
53.017 Separate connections and drains; plans for private sewers
53.018 Standards for material and workmanship; manner of laying pipe and house sewer
53.019 Material for certain sewers laid between buildings
53.020 Connection of certain drains to sanitary sewer system prohibited
53.021 Correction of violations
Tapping and Connection Fees
53.035 Sewer capacity tap fee
53.036 Charges for sewer collection system taps
Sewer Rental
53.050 Short title
53.051 Purpose
53.052 Conditions of service
53.053 Monthly readiness-to-serve charges
53.054 Monthly additional waste charges
53.055 Monthly multi-user charges
53.056 Monthly charges based on private water usage
53.057 Monthly surcharges for high-strength wastewater
53.058 Pine Township, Liberty Township, Springfield Township, Mercer Township and Harrisville Borough rates
53.059 Rate review
53.060 Bookkeeping
53.061 Administration
53.062 Procedure for termination of service
53.063 Savings clause
Uses of Sewers
53.080 Short title
53.081 Purpose
53.082 Regulations
53.083 The disposal of waters not containing sewage
53.084 Materials and substances excluded from public sewers
53.085 Toxic substances prohibited or accepted conditionally
53.086 Terms and conditions for the issuance of a permit
53.087 Removal, transportation and disposition of scavenger wastes
53.088 Rules and regulations in force and validity
Industrial Wastewater Requirements
53.100 General provisions
53.101 Regulations
53.102 Fees
53.103 Administration
53.104 Enforcement
Backflow Prevention and Cross Connection
53.120 General policy
53.121 Definitions
53.122 Water system
53.123 Cross-connections prohibited
53.124 Surveys and investigations
53.125 Where protection required
53.126 Type of protection required
53.127 Backflow prevention devices
53.128 Installation
53.129 Inspection and maintenance
53.130 Booster pumps
53.131 Violations
Private Sanitary Sewer Laterals
53.140 Definitions
53.141 Certification application
53.142 Temporary document of certification
53.143 Sale without compliance
53.144 Water disconnection for non-compliance
53.145 Rules and regulations
53.999 Penalty
Appendix A: Applications; industrial sewer connection application wastewater discharge permit