CHAPTER 53: SEWERS AND SEWAGE DISPOSAL
Section
Sewer Construction and Connections
Part A: Requirement for Connections; Cost of Construction
   53.001   Property owner to make connection to sewer on abutting street or alley
   53.002   Authority for borough to make connection and collect cost from property owner
   53.003   Deposit required prior to construction of sewer line
   53.004   Borough not required to construct sewer line following petition and deposit
Part B: Connection Procedures and Standards
   53.015   Adequacy of sewer connections and drains
   53.016   Work to be inspected; notice of readiness for inspection
   53.017   Separate connections and drains; plans for private sewers
   53.018   Standards for material and workmanship; manner of laying pipe and house sewer
   53.019   Material for certain sewers laid between buildings
   53.020   Connection of certain drains to sanitary sewer system prohibited
   53.021   Correction of violations
Tapping and Connection Fees
   53.035   Sewer capacity tap fee
   53.036   Charges for sewer collection system taps
Sewer Rental
   53.050   Short title
   53.051   Purpose
   53.052   Conditions of service
   53.053   Monthly readiness-to-serve charges
   53.054   Monthly additional waste charges
   53.055   Monthly multi-user charges
   53.056   Monthly charges based on private water usage
   53.057   Monthly surcharges for high-strength wastewater
   53.058   Pine Township, Liberty Township, Springfield Township, Mercer Township and Harrisville Borough rates
   53.059   Rate review
   53.060   Bookkeeping
   53.061   Administration
   53.062   Procedure for termination of service
   53.063   Savings clause
Uses of Sewers
   53.080   Short title
   53.081   Purpose
   53.082   Regulations
   53.083   The disposal of waters not containing sewage
   53.084   Materials and substances excluded from public sewers
   53.085   Toxic substances prohibited or accepted conditionally
   53.086   Terms and conditions for the issuance of a permit
   53.087   Removal, transportation and disposition of scavenger wastes
   53.088   Rules and regulations in force and validity
Industrial Wastewater Requirements
   53.100   General provisions
   53.101   Regulations
   53.102   Fees
   53.103   Administration
   53.104   Enforcement
Backflow Prevention and Cross Connection
   53.120   General policy
   53.121   Definitions
   53.122   Water system
   53.123   Cross-connections prohibited
   53.124   Surveys and investigations
   53.125   Where protection required
   53.126   Type of protection required
   53.127   Backflow prevention devices
   53.128   Installation
   53.129   Inspection and maintenance
   53.130   Booster pumps
   53.131   Violations
Private Sanitary Sewer Latterals
   53.140   Definitions
   53.141   Certification application
   53.142   Temporary document of certification
   53.143   Sale without compliance
   53.144   Water disconnection for non-compliance
   53.145   Rules and regulations
 
   53.999   Penalty
   Appendix A: Applications; industrial sewer connection application wastewater discharge permit