§ 53.003 DEPOSIT REQUIRED PRIOR TO CONSTRUCTION OF SEWER LINE.
   Sanitary sewer lines be constructed only after the parties requesting the sewer line deposit with the borough an amount equal to the cost of constructing that portion of the said line which directly serves the lands owned by the petitioners.
(1980 Code, Ch. 20, Part 1A, § 3) (Res. 4/16/1951, passed 4-16-1951, § 3)