1. In the event the Council determines the necessity of constructing a major sanitary sewer facility or major water main facility, and determines that the utilization of a connection fee is the most equitable manner in which to recover the City’s costs associated therewith, the Council shall cause a “Notice of Public Hearing on the Proposed Adoption of an Ordinance to Establish a Benefited District and a Connection Fee” to be published in a newspaper of general circulation within the City as hereinafter provided. In addition to indicating the date, time and place of the public hearing, the notice shall:
A. Identify by general description the proposed benefited district to be served by the major sanitary sewer facility or facilities, or major water main facility or facilities; and
B. Set forth the proposed schedule of connection fees to be paid by property owners within the benefited district who connect to said facilities, expressed in dollars per acre of land area served or such other method as the City shall determine to be equitable for the benefited district.
2. The notice shall also state that the proposed connection fee ordinance is on file, along with a plat of the area to be served, and both are available for public inspection in the office of the City Clerk. The notice shall be published not more than 45 days and not less than 20 days prior to the scheduled date of the public hearing, and shall be mailed to each property owner within the benefited district as shown by the records of the County Assessor.
3. At the public hearing, the owners of property within the proposed benefited district shall be heard and may offer comments or objections as to:
A. The calculation of the area benefited by the proposed major sanitary sewer facilities or major water main facilities; and
B. The proposed connection fee.
4. Upon concluding the hearing, the City Council shall rule upon the objections presented during the hearing and may consider the adoption of the proposed connection fee ordinance. Upon consideration of the proposed connection fee ordinance, the Council may:
A. Adopt the ordinance as proposed;
B. Delete elements or portions of the proposed major sanitary sewer facilities and major water main facilities and the properties served thereby from the benefited district proposed; or
C. Amend the ordinance to revise the connection fee.
1. The owners of parcels of less than one acre in size located within the benefited district may connect such parcels to the sanitary sewer facility or water main facility upon approval of their application for connection, payment of the minimum connection fee, or the fee for one acre if the connection fee is a per-acre fee for the parcel, and construction, at the owner’s expense, of appropriate connection structures, as determined necessary by the City.
2. The owners of residences on parcels in excess of one acre in size located within the benefited district may connect such residences to the major sanitary sewer facility or major water main facility upon approval of their application for connection and division of said parcel into a residence parcel and a remainder parcel, payment of the connection fee for the residence parcel and construction, at the owner’s expense, of appropriate connection structures, as determined necessary by the City. The connection fee for the remainder parcel shall be payable at such time as the remainder parcel shall be connected to the major sanitary sewer facility or major water main facility. For purposes of this section, a parcel may be divided once. For purposes of this section, division of the property into a residence parcel and a remainder parcel may be accomplished by submitting a drawing showing a graphical depiction of the two parcels including dimensions accurate to within a distance of one foot, a legal description of the entire parcel and a legal description of the residence parcel with such accuracy as to allow the City to determine a reasonable description of the remainder parcel. For purposes of this section, the division of property does not require a subdivision of the property or a plat of survey.
3. No connection shall be made for the purpose of providing water or sewer service to any property except direct connections to serve property included within the benefited district.
4. Sanitary sewer service or water service can be provided to parcels and facilities owned by a political subdivision of the State of Iowa, in the same manner and under the same procedures set forth in this section for parcels less than one acre in size, described in subsection 1, above.
5. All other property located within the benefited district shall be eligible for connection to the sanitary sewer facility or water main facility upon approval of an application for connection by the owner thereof, as hereafter provided, and payment of the connection fee for such property, provided such property has been appropriately subdivided for development, and, where applicable, all sanitary sewer improvements and/or water main improvements necessary to serve said property have been constructed, at the owner’s expense, and accepted by the City.
6. The owner of any parcel making a connection to water main or sanitary sewer facilities, as authorized and permitted herein, shall be solely responsible for the cost of making such connection. Such connection shall be designed and installed in complete accordance with all applicable City ordinances, rules, and regulations.
1. All owners of those properties within the benefited district whose properties are eligible for connection and who propose to connect such properties directly or indirectly to the sanitary sewer facility or water main facility shall make application to the City for such connection. No connection shall be made to a major sanitary sewer facility or major water main facility until such application has been approved and until the required connection fee has been paid.
2. The submittal of construction plans to the City for sanitary sewer improvements and/or water main improvements on property being subdivided for development shall constitute an application to the City for purposes of this section.
3. In addition to the application for connection and the required connection fee, the owner of the parcel to be serviced by the connection that is not within the corporate limits at that time shall file with the City an Application for Annexation, said application to be in a form as provided by the City and subsequently acted upon by the City Council.
4. In the event any property owner connects his or her property within a benefited district to a major sanitary sewer facility or major water main facility without having made application therefor or without having received approval thereof, or without having paid the required connection fee established by a connection fee ordinance, the City shall be entitled to disconnect such private sewer connection or private water connection until such time as the property owner has made and received approval of the application, and/or has paid the required connection fee.
1. The sewer connection fee or water connection fee shall be due and payable at the time application is made to the City for connection to the major sanitary sewer facility or major water main facility. The sewer connection fee and/or water connection fee required by this section shall be paid before the City will approve the final plan of property subject to the connection fee.
2. The sewer connection fee or water connection fee shall be in an amount equal to the maximum acre area of contiguous property, or fraction thereof, within the benefited district under common ownership which can be lawfully served through such proposed connection, multiplied by the per acre connection fee or such other fee basis as determined for the benefited district established in the connection fee ordinance for that benefited district. The connection fee may be a graduated connection fee, with annual interest adjustments, such that property owners who connect in later years pay interest on the connection fee for their property.
3. The sewer connection fees or water connection fees required by this chapter shall be due and payable to the City.
4. The sewer connection fees and/or water connection fees required by this chapter are in addition to, and not in lieu of, fees required in Sections 90.06 and 96.02 of this Code of Ordinances.
5. Any person violating the provisions of this chapter by connecting to a major sanitary sewer facility or major water main facility without having complied with the provisions of this chapter shall be punished as provided in Section 1.14.
The following water connection districts have been established and all connection requirements provided in this chapter shall apply.
1. Crosswinds Water Connection District 1.
A. Crosswinds Water Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Beginning at the SE corner of Section 7, Township 79 North, Range 23 West of the 5th P.M. (Section 7-79-23); thence west along the south line of Section 7-79-23 to the east ROW line of Interstate Highway 35; thence northerly along the east ROW line of Interstate Highway 35 to the north line of Section 6, Township 79 North, Range 23 West of the 5th P.M. (Section 6-79-23); thence east along the north line of Section 6-79-23 to the centerline of SE Four Mile Drive; thence south along the centerline of SE Four Mile Drive to the NE corner of Section 7-79-23; thence south along the east line of Section 7-79-23 to the point of beginning.
and: EX S 1065.15F- W 757F S OF RR LESS RD SW 1/4 SEC 5-79-23 GEOPARCEL # 7923-05-300-001
and: EX W 60F RD- BEG 1040.15F N OF SW COR THN E 1155F THN N TO PT 330F S OF N LN THN W TO PT 1584F W OF E LN THN N TO S LN RR THN SWLY ALNG RR TO PT 757F E OF W LN & 1064.5F N OF S LN THN W 757F TO W LN THN S 25F TO POB SW 1/4 SEC 5-79-23 GEOPARCEL # 7923-05-300-002
and: PARCEL D S1039.5F W1155F SW 1/4 SW 1/4 LESS 2.94A RD SEC 5-79-23 GEOPARCEL # 7923-05-300-008
and: 1 SQUARE A NW COR NW 1/4 NW 1/4 LESS .458A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-001
and: EX 1 SQUARE A NW COR & PARCEL F BK 8529 PG 964 BEG 884.67F E OF NW COR THN E 435F S 545F W 435F N 545F TO POB & BEG 1314.2F N OF W 1/4 COR OF SEC THN N 258F ALNG W LN E 100F S 258F W 100F TO POB- NW 1/4 NW 1/4 LESS 2.24A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-009
and: PARCEL F N 545F E 435F NW 1/4 NW 1/4 LESS .44A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-008
B. The owner of any parcel included within the Crosswinds Water Connection District 1 desiring to make a residential service connection shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the Crosswinds Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner shall pay a connection fee in the amount of $1,800.00 per acre, or $3,000.00, whichever is greater.
2. Delaware Avenue. No person shall be allowed to connect onto the existing SE Delaware Avenue water main outside the City limits of the City, except under the following conditions:
A. Only residential dwellings constructed and occupied in 1980 shall be allowed to hook onto said water line and the water provided to said premises through said line shall be used solely for residential purposes.
B. In the event that any person who owns premises which qualify under the preceding subsection desires to connect to the SE Delaware Avenue water main, such person must first file an application with the City, requesting such service. Such application shall be accompanied by payment of a hook-on fee in the amount of $2,500.00.
C. All of the water lines required to connect the existing building to the City water system as well as the water meter shall be installed in accordance with City rules and regulations governing such installation and at the sole cost of the applicant.
3. Eastside Rural Water Connection District 1.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Eastside Rural Water Main Extension Phase I” means the water main installed along SE Oralabor Road (County NE 78
th
Avenue), NE 29
th
Street, NE Berwick Drive and SE Magazine Road (County NE 86
th
Avenue) within the Eastside Rural Water Connection District 1.
(2) “Eastside Rural Water Connection District 1” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Beginning at a point on the south line of Section 30, Township 80 North, Range 23 West of the 5th P.M. (Section 30-80-23) that is 907.2 feet east of the South ¼ Corner of said Section 30; thence northerly 355.09 feet; thence westerly 153.05 feet to the SE Corner of Metro North II Plat 2, thence northerly 285.21 feet along the east line of Lot 5 Metro North II Plat 2; thence northerly 457.52 feet along the east line of Lot 4 Metro North II Plat 2; thence northerly 264.45 feet along the east line of Lot 3 Metro North II Plat 2 to a point on the north line of the SW¼ SE¼ of Section 30-80-23; to the NW Corner of the SE¼ SE¼ Section 30-80-23; thence east along the north line of the west 30 acres of the SE¼ SE¼ Section 30-80-23 to the SW Corner of the east 30 acres of the NE¼ SE¼ Section 30-80-23; thence north along the west line of the east 30 acres of the NE¼ SE¼ Section 30-80-23 to the NW Corner of the north 10 acres of the east 30 acres of the NE¼ SE¼ Section 30-80-23; thence west along the south line of the SE¼ NE¼ Section 30-80-23 to the SW Corner of the SE¼ NE¼ Section 30-80-23; thence north along the west line of the SE¼ NE¼ Section 30-80-23 to the SE Corner of Lot 6 Mallorys Park, an Official Plat; thence west along the south line of Lots 6, 5, 4, 3, 2 and 1 Mallorys Park to the SW Corner of Lot 1 Mallorys Park; thence north along the west line of Lot 1 Mallorys Park to the NW Corner of Lot 1 Mallorys Park;
thence north 33 feet to the south line of Section 19, Township 80 North, Range 23 West of the 5th P.M. (Section 19-80-23); thence west along the south line of Section 19-80-23 to the SW Corner of the SE¼ Section 19-80-23; thence north along the west line of the SE¼ Section 19-80-23 to the SE Corner of the north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23; thence west along the south line of the north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23 to the SW Corner of said north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23; thence north along the west line of the north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23 to the NW Corner of said north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23; thence east along the north line of the north 3 acres of the east 8 acres NE¼ SW Fractional ¼ Section 19-80-23 to the NW Corner of the SE¼ Section 19-80-23; thence east along the north line of the SE¼ Section 19-80-23 to the NE Corner of the W½ SE¼ Section 19-80-23; thence south along the east line of the W½ SE¼ Section 19-80-23 to the NW Corner of the SE¼ SE¼. Section 19-80-23; thence east along the north line of the SE¼ SE¼ Section 19-80-23 to the NE Corner of the SE¼ SE¼ of Section 19-80-23; thence south along the east line of Section 19-80-23 to the NW Corner of the South 26 acres of the SW¼ SW¼ Section 20, Township 80 North, Range 23 West of the 5th P.M. (Section 20-80-23);
thence east along the north line of the South 26 acres of the SW¼ SW¼ Section 20-80-23 to the NE Corner of the South 26 acres of the SW¼ SW¼ Section 20-80-23; thence south along the east line of the South 26 acres of the SW¼ SW¼ Section 20-80-23 to the SE Corner of the SW¼ SW¼ Section 20, Township 80 North, Range 23 West of the 5th P.M. (Section 20-80-23);
thence south along the east line of the NW¼ NW¼ Section 29-80-23 to the SE Corner of the NW¼ NW¼ Section 29-80-23; thence east along the north line of the SE¼ NW¼ Section 29-80-23 to the NW Corner of SW¼ NE¼ Section 29-80-23; thence east along the north line of the SW¼ NE¼ Section 29-80-23 to the NE Corner of the SW¼ NE¼ Section 29-80-23; thence south along the east line of the SW¼ NE¼ Section 29-80-23 to the SE Corner of the SW¼ NE¼ Section 29-80-23; thence south along the east line of Lots 1, 2, 4, 5, 6 and 7, J.A.D. Farms Plat 1, an Official Plat, and continuing south to the SE Corner of the SW¼ SE¼ Section 29-80-23; thence south along the east line of Lots 3 and 2, Four Mile Woods Plat 2, an Official Plat, to the SE Corner of Lot 2, Four Mile Woods Plat 2; thence west along the south line of Lots 2 and 1, Four Mile Woods Plat 2, to the SW Corner of Lot 1, Four Mile Woods Plat 2;
thence west along the south line of the N½ NW¼ Section 32, Township 80 North, Range 23 West of the 5th P.M. (Section 32-80-23) to the SE Corner of Lot 7, Oakland Timber Estates, an Official Plat, and continuing west along the south line of said Lot 7, to the SW Corner of said Lot 7; and continuing west along the south line of the N½ NW¼ Section 32-80-23 to the SW Corner of the N½NW¼ Section 32-80-23, and continuing west along the south line of N½NE¼ Section 31, Township 80 North, Range 23 West of the 5th P.M. (Section 31-80-23) to the SE Corner of Lot 5 Metro North Air Park, an Official Plat; thence north along the east line of Lots 5, 4 and 3, Metro North Air Park, an Official Plat, to the south line of Section 30-80-23; thence east along the south line of Section 30-80-23 to the point of beginning.
B. The owner of any parcel included within the Eastside Rural Water District 1 desiring to make a residential service connection to the Eastside Rural Water Main Extension Phase I shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the Eastside Rural Water District 1 is developed for industrial or commercial use, or is subdivided and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Eastside Rural Water Main or extensions of mains connected to the Eastside Rural Water Main as necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in three components: cost per platted lot, cost per frontage foot on the Eastside Rural Water Main, and cost per square foot within the subdivision. The fees for each component are as follows and the total fee will be the sum of the components, or $3,000.00, whichever is greater:
Cost per platted lot $ 1,275.00
Cost per frontage foot $ 3.60
Cost per square foot $ 0.003
D. In the event any parcel within the Eastside Rural Water District 1 is developed for urban residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Eastside Rural water main or extensions of mains connected to the Eastside Rural Water Main as necessary their development. The fee will be paid prior to the connection, prior to final plat approval by the City, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The connection fee for urban residential development is $1,800.00 per acre within the plat boundary.
E. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Eastside Rural Water Main Extension Phase I for the purpose of providing water service to property other than established parcels included in the Eastside Rural Water Connection District 1. It is the intent of this section that, whether or not the Eastside Rural Water Main Extension Phase I is hereafter further extended, no direct service connections shall be made to that portion of the Eastside Rural Water Main Extension Phase I defined hereunder as the Eastside Rural Water Main Extension Phase I except as provided for hereunder.
4. Northside Rural Water Connection District 1.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Northside Rural Water Main Extension Phase I” means the water main installed along NE Delaware Avenue (County NE 22
nd
Street), NE 54
th
Street (County NE 118
th
Avenue), and NW Ash Drive (County NE 6
th
Street) within the Northside Rural Water Connection District 1.
(2) “Northside Rural Water Connection District 1” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Beginning at a point on the west ROW line of NW Ash Drive that is 556.97 feet north of the NE Corner of Ashland Meadows Plat 2, an Official Plat; thence west 816.2 feet to a point; thence south 496.96 feet to a point; thence east 185 feet to a point; thence south 60 feet to a point on the north line of Lot 20 Ashland Meadows Plat 5, an Official Plat; thence west along the north line of Lot 20 Ashland Meadows Plat 5 to the NW Corner of Lot 20 Ashland Meadows Plat 5; thence west along the north line of Lots 7, 6, 5 and 4 of Ashland Meadows Plat 6, an Official Plat, to the SE Corner of the W½ NW¼ of Section 11, Township 80 North, Range 24 West of the 5th P.M. (Section 11-80-24); thence north along the cast line of the W½ NW¼ Section 11-80-24 to the NE Corner of the W½ NW¼ Section 11-80-24;
thence east alone the south line of Section 2, Township 80 North, Range 24 West of the 5th P.M. (Section 2-80-24) to the SW Corner of the east 35 acres of the SE¼ SW¼ Section 2-80-24; thence north along the west line of the east 35 acres of the SE¼ SW¼ Section 2-80-24 to the NW Corner of the east 35 acres of the SE¼ SW¼ Section 2-80-24; thence west along the south line of the N½ SW¼ Section 2-80-24 to the SW Corner of the N½ SW¼ Section 2-80-24; thence north along the west line of the N½ SW¼ Section 2-80-24 to the NW Corner of the N½ SW¼ Section 2-80-24; thence east along the north line of the N½ SW¼ Section 2-80-24 to the SW Corner of the SE¼ NW Fractional ¼ Section 2-80-24; thence north along the west line of the SE¼ NW Fractional ¼ Section 2-80-24 to the NW Corner of the SE¼ NW Fractional ¼ Section 2-80-24; thence west along the south line of the N½ NW Fractional ¼ Section 2-80-24 to the SW Corner of the N½ NW Fractional ¼ Section 2-80-24;
thence south along the east line of the E½ NE Fractional ¼ of Section 3, Township 80 North, Range 24 West of the 5th P.M. (Section 3-80-24) to the SE Corner of the E½ NE Fractional ¼ Section 3-80-24; thence west along the south line of the NE Fractional ¼ Section 3-80-24 to the SW Corner of the W½ NE Fractional ¼ Section 3-80-24; thence north along the west line of the W½ NE Fractional ¼ Section 3-80-24 to the NW Corner of the W½ NE Fractional ¼ Section 3-80-24;
thence north along the west line of the W½ SE¼ of Section 34, Township 81 North, Range 24 West of the 5th P.M. (Section 34-81-24) to the NW Corner of the W½ SE¼ Section 34-81-24; thence east along the north line of the SE ¼ Section 34-81-24 to the NE corner of the SE¼ Section 34-81-24;
thence east along the north line of the S½ of Section 35, Township 81 North, Range 24 West of the 5th P.M. (Section 35-81-24) to the NE Corner of the S½ Section 35-81-24;
thence south along the west line of the Section 36, Township 81 North, Range 24 West of the 5th P. M. (Section 36-81-24) to the SW Corner of the NW¼ SW¼ and the west 6 acres of Section 36-81-24; thence cast along the south line of the NW¼ SW¼ and the west 6 acres of the NE¼ SW¼ of Section 36-81-24 to the SE Corner of the NW¼ SW¼ and the west 6 acres of the NE¼ SW¼ of Section 36-81-24; thence north along the east line of the NW¼ SW¼ and the west 6 acres of the NE¼ SW¼ of Section 36-81-24 to the NE Corner of the NW¼ SW¼ and the west 6 acres of the NE¼ SW¼ of Section 36-81-24; thence east along the north line of the east 68 acres of the E½ SW¼ of Section 36-81-24 to the NE Corner of the east 68 acres of the E½ SW¼ of Section 36-81-24; thence south along the east line of the east 68 acres of the E½ SW¼ of Section 36-81-24 to the SW Corner of the N½ SE¼ of Section 36-81-24; thence east along the south line of the N½ SE¼ of Section 36-81-24 to the SE Corner of the N½ SE¼ of Section 36-81- 24;
thence south along the west line of Section 31, Township 81 North, Range 23 West of the 5th P. M. (Section 31-81-23) to the SW Corner of the S¾ SW Fractional ¼ of Section 31-81-23; thence cast along the south line of the S¾ SW Fractional ¼ of Section 31-81-23 to the west ROW line of Interstate Highway 35; thence south along the west ROW line of Interstate Highway 35 to a point on the south line of Section 31-81-23;
thence continuing south along the west ROW line of Interstate Highway 35 to a point on the south line of the NW Fractional ¼ of Section 6, Township 80 North, Range 23 West of the 5th P.M. (Section 6-80-23); thence west along the south line of the NW Fractional ¼ Section 6-80-23 to the SW Corner of the NW Fractional ¼ Section 6-80-23;
thence north along the cast line of Section 1, Township 80 North, Range 24 West of the 5th P.M. (Section 1-80-24) to a point located 1641.57 feet south of the NE Corner of the NE Fractional ¼ of Section 1-80-24; thence westerly 1102.40 feet along the centerline of the Iowa Electric Power and Light electric transmission line easement to a point on the north line of the Creekside PUD, an official Planned Unit Development; thence westerly 800.54 feet along the easement centerline to a point on the north line of the Creekside PUD; thence westerly 205.80 feet along the easement centerline to the NW Corner of the Creekside PUD, thence southeasterly 47.35 feet to a point of the west line of the Creekside PUD; thence southerly 100.29 feet to a point on the west line of the Creekside PUD; thence southerly 157.26 feet to a point on the west line of the Creekside PUD; thence southerly 52.47 feet to a point on the west line of the Creekside PUD; thence southerly 50.00 feet to a point on the west line of the Creekside PUD; thence southerly 95.29 feet to a point on the west line of the Creekside PUD; thence southwesterly 44.13 feet to a point on the west line of the Creekside PUD; thence northwesterly 88.91 feet to a point on the west line of the Creekside PUD; thence southwesterly 67.10 feet to a point on the west line of the Creekside PUD; thence southerly 56.80 feet to a point on the east line of the Creekside PUD; thence southerly 50.00 feet to a point on the west line of the Creekside PUD; thence southwesterly 44.98 feet to a point on the west line of the Creekside PUD; thence northwesterly 110.25 feet to a point on the west line of the Creekside PUD; thence southerly 25.54 feet to a point on the west line of the Creekside PUD; thence southerly 70.60 feet to a point on the west line of the Creekside PUD; thence southwesterly 37.47 feet to a point on the west line of the Creekside PUD; thence southerly 68.88 feet to a point on the west line of the Creekside PUD; thence northwesterly 137.36 feet to a point on the west line of the Creekside PUD; thence southwesterly 45.01 feet to a point on the west line of the Creekside PUD;
thence northerly 119.73 feet to a point on the east line of the Avondale Trace PUD, an official Planned Unit Development; thence northwesterly 19.87 feet to a point on the east line of the Avondale Trace PUD; thence northwesterly 25.90 feet to a point on the east line of the Avondale Trace PUD; thence southwesterly 99.18 feet to a point on the east line of the Avondale Trace PUD; thence southwesterly 110.00 feet to a point on the east line of the Avondale Trace PUD; thence southwesterly 65.00 feet to a point on the east line of the Avondale Trace PUD; thence northwesterly 235.00 feet to a point on the east line of the Avondale Trace IPUD; thence northwesterly 334.94 feet to the northeasterly Corner of the Avondale Trace PUD; thence westerly 2025.00 feet along the north line of the Avondale Trace to the NW Corner of the Avondale Trace PUD;
thence continuing along said line westerly 60 feet to the east line of Section 2, Township 80 North, Range 24 West of the 5th P.M. (Section 2-80-24); thence north along the east line of Section 2-80-24 to the NE Corner of the N 562.5 feet of the S 1125 feet of the E 1960 feet of the N½ NE Fractional ¼ of Section 2-80-24; thence west 1960 feet along the north line of the N 562.5 feet of the S 1125 feet of the E 1960 feet of the N½ NE Fractional ¼ of Section 2-80-24 to the NW Corner of the N 562.5 feet of the S 1125 feet of the E 1960 feet of the N½ NE Fractional ¼ of Section 2-80-24; thence south 562.5 feet along the west line of the N 562.5 feet of the S 1125 feet of the E 1960 feet of the N½ NE Fractional ¼ of Section 2-80-24 to the SW Corner of the N 562.5 feet of the S 1125 feet of the E 1960 feet of the N½ NE Fractional ¼ of Section 2-80-24; thence south 562.5 feet along the west line of the E1960 feet of the S 562.5 feet of the N½ NE Fractional ¼ Section 2-80-24 to the SW Corner of the E 1960 feet of the S 562.5 feet of the N½ NE Fractional ¼ Section 2-80-24; thence east 1960 feet along the south line of the E 1960 feet of the S 562.5 feet of the N½ NE Fractional ¼ Section 2-80-24 to the SE Corner of the E 1960 feet of the S 562.5 feet of the N½ NE Fractional ¼ Section 2-80-24; thence south along the east line of Section 2-80-24 to the SE Corner of the S½ NE Fractional ¼ Section 2-80-24; thence south along the east line of Section 2-80-24 to the NE Corner of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80-24; thence west 1597.2 feet along the north line of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80-24 to the NW Corner of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80- 24; thence south 600 feet along the west line of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80-24 to the SW Corner of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80-24; thence east 427.2 feet along the south line of the E 1597.2 feet of the S 600 feet of the N½ SE¼ Section 2-80-24 to a point; thence southeasterly 375.88 feet to a point; thence southeasterly 418.42 feet to a point; thence easterly 345.00 feet to a point on the east line of the S½ SE¼ Section 2-80-24; thence south 970.45 feet along the east line of Section 2-80-24 to the SE Corner of Section 2-80-24;
thence south along the east line of the N 140 acres of the NE¼ of Section 11, Township 80 North, Range 24 West of the 5th P.M. (Section 11-8,0-24) to the SE Corner of the N 140 acres of the NE¼ of Section 11-80-24; thence west along the south line of the N 140 acres of the NE¼ of Section 11-80-24 to the SW Corner of the N 140 acres of the NE¼ of Section 11-80-24; thence continuing west to a point on the west ROW line of NW Ash Drive; thence north along the west ROW line of NW Ash Drive to the Point of Beginning.
B. The owner of any parcel included within the Northside Rural Water District 1 desiring to make a residential service connection to the Northside Rural Water Main Extension Phase I shall make application therefor to the City, and at the time of making application, shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the Northside Rural Water District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Northside Rural Water Main or extensions of mains connected to the Northside Rural Water Main as necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the Northside Rural Water Main, or cost per acre within the subdivision. The costs for each component are as follows and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Cost per frontage foot $ 60.00
Cost per acre $ 1,400.00
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Northside Rural Water Main Extension Phase I for the purpose of providing water service to property other than established parcels included in the Northside Rural Water Connection District 1. It is the intent of this section that, whether or not the Northside Rural Water Main Extension Phase I is hereafter further extended, no direct service connections shall be made to that portion of the Northside Rural Water Main Extension Phase I defined hereunder as the Northside Rural Water Main Extension Phase I except as provided for hereunder.
5. Northwest 18th Street Water Connection District 1.
A. For the purposes of this section, the following terms have the following meanings:
(1) “NW 18
th
Street Water Main Phase 1” means the water main installed along NW 18
th
Street between the abandoned Railroad ROW and NW State Street.
(2) “NW 18
th
Street Water Connection District 1” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Beginning at a point being the SE Corner of Section 10, Township 80 North, Range 24 West of the 5th P.M. (Section 10-80-24) thence north along the east line Section 10-80-24 to the NE Corner of the SE¼ Section 10-80-24; thence west along the north line of the SE¼ Section 10-80-24 to NW Corner of the SE¼ Section 10-80-24; thence south along the west line of the SE¼ Section 10-80-24 to the NE Corner of the S½ SW¼ and the south 3 acres of the N½ SW¼ Section 10-80-24; thence west along the north line of the S½ SW¼ and the south 3 acres of the N½ SW¼ Section 10-80-24 to a point on the east ROW line of NW Irvinedale Road; thence south along the east ROW line of NW Irvinedale Road to a point on the north ROW line of the abandoned Union Pacific Railroad; thence southeasterly along the north ROW line of the abandoned Union Pacific Railroad to a point on the south line of Section 10-80-24; thence east along the south section line of Section 10-80-24 to the point of beginning.
B. The owner of any parcel included within the NW 18th Street Water Connection District 1 to make a residential service connection to the NW 18th Street Water Main Phase I shall make application therefor to the City, and at the time of making application, shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the NW 18th Street Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the NW 18th Street Water Main Phase I or extensions of mains connected to the NW 18th Street Water Main Phase I as necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the NW 18th Street Water Main Phase I, or cost per acre within the subdivision. The costs for each component are as follows and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Cost per frontage foot $ 65.00
Cost per platted acre $ 1,000.00
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the NW 18th Street Water Main Phase I for the purpose of providing water service to property other than established parcels included in the NW 18th Street Water Connection District 1. It is the intent of this section that, whether or not the NW 18th Street Water Main Phase I is hereafter further extended, no direct service connections shall be made to that portion of the NW 18th Street Water Main Phase I except as provided for hereunder.
6. Northwest Weigel Drive Water Connection District 1.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Northwest Weigel Drive Water Main” means the water main installed along Northwest Weigel Drive between north of Northwest 5
th
Street and Northwest 18
th
Street.
(2) “Northwest Weigel Drive Water Connection District 1” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
-EX BEG NE CORNER W½ NW¼ SEC 16 THN S 1570.96F W 40.01F N 1496.1F NWLY 39.53F W 1249.4F N 50F E 1314.69F TO POB ROAD & ROAD EASM- & -EX E 433F S 1089F- W½ NW¼ SEC 16-80-24 (GEOPARCEL # 8024-16-100-007)
and
E 433F S 1089F W½ NW¼ LESS 1A RD SEC 16-80-24 (GEOPARCEL #8024-16-100-008)
and
OUTLOT Z WATERCREST PLAT 4 (GEOPARCEL # 8024-16-301-006)
B. No connection shall be made to the Northwest Weigel Drive Water Main for the purpose of providing water service to any property except direct connections to serve property included within the Northwest Weigel Drive Water Connection District 1 and then, only on the conditions set forth in subsection C below.
C. The right to make connections to the Northwest Weigel Drive Water Main from parcels included within the Northwest Weigel Drive Water Connection District 1 shall be subject to the following conditions:
(1) No connection shall be permitted other than a direct connection to serve a residential structure located on an established parcel within the Northwest Weigel Drive Water Connection District 1, except as provided in paragraph D below.
(2) The owner of any parcel included within the Northwest Weigel Drive Water Connection District 1 desiring to make a residential service connection to the Northwest Weigel Drive Water Main shall make application therefor to the City and, at the time of making application, shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
(3) The owner of any parcel within the Northwest Weigel Drive Water Connection District 1 making a connection to the Northwest Weigel Drive Water Main, as authorized and permitted hereunder, shall be solely responsible for the cost of making such connection, all as provided for in Section 90.12. Such connection shall be designed and installed in complete accordance with all applicable City ordinances, rules, and regulations.
D. In the event any parcel within the Northwest Weigel Drive Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial, or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Northwest Weigel Drive Water Main or extensions of mains connected to the Northwest Weigel Drive Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the Northwest Weigel Drive Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Connection Fee (per acre) | Connection Fee (per front foot) |
Prior to and through December 31, 2008 | $2,104.00 | $59.50 |
January 1, 2009 | $2,188.20 | $61.90 |
January 1, 2010 | $2,272.40 | $64.30 |
January 1, 2011 | $2,356.60 | $66.70 |
January 1, 2012 | $2,440.80 | $69.10 |
January 1, 2013 | $2,525.00 | $71.50 |
January 1, 2014 | $2,609.20 | $73.90 |
January 1, 2015 | $2,693.40 | $76.30 |
January 1, 2016 | $2,777.60 | $78.70 |
January 1, 2017 and thereafter | $2,861.80 | $81.10 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
E. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Northwest Weigel Drive Water Main for the purpose of providing water service to property other than established parcels included in the Northwest Weigel Drive Water Connection District 1. It is the intent of this section that, whether or not the Northwest Weigel Drive Water Main is hereafter further extended, no direct service connections shall be made to that portion of the Northwest Weigel Drive Water Main defined hereunder as the Northwest Weigel Drive Water Main except as provided for hereunder.
7. Northwest 18
th
Street Water Connection District 2.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Northwest 18
th
Street Water Main Phase 2” means the water main installed along Northwest 18
th
Street between Northwest Irvinedale Drive and Northwest Weigel Drive.
(2) “Northwest 18
th
Street Water Connection District 2” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
PARCEL A BK 11144 PG 750 CORR AFF BK 11555 PG 364 BEG SE COR THN W1976.35F N 50F NELY 39.27F N 25F NWLY 176.54F W 138.07F N 156.65F NE 185.85F NE 225.54F N 1069.69F TO S ROW LN ABND UP RR SE 1965.1F TO E LN OF SEC S 1178.94F TO POB SE¼ LESS 1.28A RD EAS & 2.44A RD SEC 9-80-24 (GEOPARCEL # 8024-09-400-008)
and
-EX S 60F W 356.48F- & -EX PARCEL A BK 11144 PG 750 CORR AFF BK 11555 PG 364 BEG SE COR THN W 1976.35F N 50F NELY 39.27F N 25F NWLY 176.54F W 138.07F N 156.65F NE 185.85F NE 225.54F N 1069.69F TO S ROW LN ABND UP RR SE 1965.1F TO E LN OF SEC S 1178.94F TO POB-SE¼ LYG S OF ABND UP RR ROW LESS RD SEC 9-80-24 (GEOPARCEL # 8024-09-400-006)
and
-EX S 50F RD- BEG 405F W OF SE COR THN W 249F N 488.1F E 249F S 487.74F TO POB S½ SW¼ SEC 9-80-24 (GEOPARCEL # 8024-09-300-012)
and
-EX S 50F W 658F & S 60F E 405.52F- & -EX BEG 405F W OF SE COR THN W 249F N 488.1F E 249F S 487.74F TO POB- & -EX BEG 50F N OF SW CORNER SE¼ SW¼ SEC 9 THN 1270.34F TO NW CORNER SE¼ SW¼ E 40F S 1245.29F SE 39.37F W 65.1F TO POB LESS EXISTING ROAD EASM- SE¼ SW¼ LESS RD SEC 9-80-24 (GEOPARCEL # 8024-09-300-014)
and
-EX N 50F W 1000F & N 70F E 312.52F- NE¼ NW¼ LESS RD SEC 16-80-24 (GEOPARCEL # 8024-16-100-003)
and
-EX N 70F & HIDDEN CREEK PLT 3- NW¼ NE¼ SEC 16-80-24 (GEOPARCEL # 8024-16-201-002)
and
-EX BEG NW COR THN E 429.21F S 33F W 211.95F WLY ALNG CRV 282.83F THN N 68.02F TO POB- & -EX PARCEL Q BK 10493 PG 562 & HIDDEN CREEK PLTS 2 & 3- NE¼ NE¼ SEC 16-80-24 (GEOPARCEL 8024-16-226-018)
and
-EX BEG NE COR TUN W 522.74F S 33F E 428.47F SELY ALNG CRV 94.78F TO E LN THN N 43.47F TO POB- PARCEL Q BK 10493 PG 562 NE¼ NE¼ SEC 16-80-24 (GEOPARCEL # 8024-16-226-017)
B. No connection shall be made to the Northwest 18
th
Street Water Main Phase 2 for the purpose of providing water service to any property except direct connections to serve property included within the Northwest 18
th
Street Water Connection District 2, and then, only on the conditions set forth in subsection C below.
C. The right to make connections to the Northwest 18
th
Street Water Main Phase 2 from parcels included within the Northwest 18
th
Street Water Connection District 2 shall be subject to the following conditions:
(1) No connection shall be permitted other than a direct connection to serve a residential structure located on an established parcel within the Northwest 18
th
Street Water Connection District 2 except as provided in subsection D below.
(2) The owner of any parcel included within the Northwest 18
th
Street Water Connection District 2 desiring to make a residential service connection to the Northwest 18
th
Street Water Main Phase 2 shall make application therefor to the City and, at the time of making application, shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fee set forth in Section 94.04, subsections 1 through 4.
(3) The owner of any parcel within the Northwest 18
th
Street Water Connection District 2 making a connection to the Northwest 18
th
Street Water Main Phase 2, as authorized and permitted hereunder, shall be solely responsible for the cost of making such connection, all as provided for in Section 90.12. Such connection shall be designed and installed in complete accordance with all applicable City ordinances, rules, and regulations.
D. In the event any parcel within the Northwest 18
th
Street Water Connection District 2 is developed for industrial or commercial use, or is subdivided for industrial, commercial, or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Northwest 18
th
Street Water Main Phase 2 or extensions of mains connected to the Northwest 18
th
Street Water Main Phase 2 as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the Northwest 18
th
Street Water Main Phase 2, or cost per acre within the subdivision plat. The cost for each component is as follows and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Connection Fee (per acre) | Connection Fee (per front foot) |
Prior to and through December 31, 2008 | $1,305.00 | $30.00 |
January 1, 2009 | $1,357.20 | $31.20 |
January 1, 2010 | $1,409.40 | $32.40 |
January 1, 2011 | $1,461.60 | $33.60 |
January 1, 2012 | $1,513.80 | $34.80 |
January 1, 2013 | $1,566.00 | $36.00 |
January 1, 2014 | $1,618.20 | $37.20 |
January 1, 2015 | $1,670.40 | $38.40 |
January 1, 2016 | $1,722.60 | $39.60 |
January 1, 2017 and thereafter | $1,774.80 | $40.80 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
E. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Northwest 18
th
Street Water Main Phase 2 for the purpose of providing water service to property other than established parcels included in the Northwest 18
th
Street Water Connection District 2. It is the intent of this section that, whether or not the Northwest 18
th
Street Water Main Phase 2 is hereafter further extended, no direct service connections shall be made to that portion of the Northwest 18
th
Street Water Main Phase 2 defined hereunder as the Northwest 18
th
Street Water Main Phase 2 except as provided for hereunder.
8. Eastside Rural Water Connection District 2.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Eastside Rural Water Main Phase 2” means the water main installed along SE Creekview Drive, E. First Street, NE Frisk Drive, and NE 18
th
Street (NE 102
nd
Avenue).
(2) “Eastside Rural Water Connection District 2” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
-EX BEG SW COR THN N 767.2F E 70F S 195F W10F S578.44F W60.32F TO POB- W 200F S 334.4F SW FRL 1/4 LESS RD SEC 7-80-23 (GEOPARCEL # 8023-07-300-004)
and: E 160F W 360F S 770F LESS 1.60 A RD SEC 7-80-23 (GEOPARCEL # 8023-07-300-005)
and: BEG 360F E SW COR THN N 285F E 150F S 185F W 20F S 100F W 130F TO BEG SW FRL 1/4 SW FRL 1/4 LESS RD SEC 7-80-23 (GEOPARCEL # 8023-07-300-006)
and: -EX PARCEL D BEG 2200.87F E & 85F S OF NW COR THN E 120.22F SELY 541.55F SW 32.74F W 260.51F N 552.5F TO POB- NE 1/4 NW FRL 1/4 LYG NLY OF CREEKVIEW GOLF PLT 1 & E OF SE CREEKVIEW DR LESS RD SEC 19-80-23 (GEOPARCEL # 8023-19-128-001)
and: -EX BEG 1961.8F E & 75F N OF SW COR SEC 18 THN W 289.3F NW162.3F N91.2F SELY 223.5F E270.5F S40F TO POB- W 650F SE 1/4 SW 1/4 LESS .75A RD SEC 18-80-23 (GEOPARCEL # 8023-18-376-001)
and: -EX W 650F- SE 1/4 SW 1/4 LESS 2.203 A RD SEC 18-80-23 (GEOPARCEL # 8023-18-377-001)
and: S 418.85F W520F OUTLOT X GREENWOOD ACRES PLT NO 6 (GEOPARCEL # 8023-18-452-002)
and: OUTLOT Y GREENWOOD ACRES PLAT NO. 7 (GEOPARCEL # 8023-18-452-019)
and: N 75A MEAS ON LN PAR TO N LN NE 1/4 LESS RD SEC 18-80-23 (GEOPARCEL # 8023-18-200-007)
and: E 1/2 NW 1/4 LYG E OF NE FRISK DR & -EX N 75A PAR TO N LN & DEER CREEK ESTATES PLAT 1- N 1950.35F NE 1/4 SEC 18-80-23 (GEOPARCEL # 8023-18-200-009)
and: -EX N 1950.35- LYG E OF DEER CREEK ESTATES PLAT 1 NE 1/4 SEC 18-80-23 (GEOPARCEL # 8023-18-200-011)
and: -EX DEER CREEK ESTATES PLAT 1- BEG 2199F N OF S 1/4 COR THN E 300F SE 190.5F NELY 889.3F ELY 1471.3F TO E LN N 269.35F W2636F S 437.75F TO POB SE 1/4 SEC 18-80-23 (GEOPARCEL # 8023-18-426-012)
and: PARCEL C BEG CNT OF SEC THN N 695.45F E 329.3F S 694.65F TO S LN W 329.5F TO POB W1/2 W1/2 SW1/4 NE1/4 LESS .667A RD SEC 18-80-23 (GEOPARCEL # 8023-18-200-005)
and: -EX N 1950.35 & PARCEL C BOOK 10528 PAGE 961 BEG CNT OF SEC THN N 695.45F E 329.3F S 694.65F TO S LN W 329.5F TO POB- LYG N & W OF DEER CREEK ESTATES PLT 1 NE 1/4 SEC 18-80-23 (GEOPARCEL # 8023-18-200-010)
and: LOT 26 DEER CREEK ESTATES PLAT 1 (GEOPARCEL # 8023-18-401-014)
B. No connection shall be made to the Eastside Rural Water Main Phase 2 for the purpose of providing water service to any property except direct connections to serve property included within the Eastside Rural Water Connection District 2 and then, only on the conditions set forth in subsection C below.
C. The right to make connections to the Eastside Rural Water Main Phase 2 from parcels included within the Eastside Rural Water Connection District 2 shall be subject to the following conditions:
(1) No connection shall be permitted other than a direct connection to serve a residential structure located on an established parcel within the Eastside Rural Water Connection District 2, except as provided in subsection D below.
(2) The owner of any parcel included within the Eastside Rural Water Connection District 2 desiring to make a residential service connection to the Eastside Rural Water Main Phase 2 shall make application therefor to the City and, at the time of making application, shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fee set forth in Section 94.04, subsections 1 through 4.
(3) The owner of any parcel within the Eastside Rural Water Connection District 2 making a connection to the Eastside Rural Water Main Phase 2, as authorized and permitted hereunder, shall be solely responsible for the cost of making such connection, all as provided for in Section 90.12. Such connection shall be designed and installed in complete accordance with all applicable City ordinances, rules and regulations.
D. In the event any parcel within the Eastside Rural Water Connection District 2 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the Eastside Rural Water Main Phase 2 or extensions of mains connected to the Eastside Rural Water Main Phase 2 as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to city approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the Eastside Rural Water Main Phase 2, or cost per acre within the subdivision plat. The cost for each component is as follows and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Connection Fee (per acre) | Connection Fee (per front foot) |
Prior to and through December 31, 2008 | $3,440.00 | $88.50 |
January 1, 2009 | $3,577.60 | $92.04 |
January 1, 2010 | $3,630.80 | $93.36 |
January 1, 2011 | $3,684.00 | $94.68 |
January 1, 2012 | $3,737.20 | $96.00 |
January 1, 2013 | $3,790.40 | $97.32 |
January 1, 2014 | $3,843.60 | $98.64 |
January 1, 2015 | $3,896.80 | $99.96 |
January 1, 2016 | $3,950.00 | $101.28 |
January 1, 2017 and thereafter | $4,003.20 | $102.60 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
E. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Eastside Rural Water Main Phase 2 for the purpose of providing water service to property other than established parcels included in the Eastside Rural Water Connection District 2. It is the intent of this section that, whether or not the Eastside Rural Water Main Phase 2 is hereafter further extended, no direct service connections shall be made to that portion of the water main defined hereunder as the Eastside Rural Water Main Phase 2 except as provided for hereunder.
(Ord. 1618 – Oct. 08 Supp.)
9. SE Four Mile Drive Water Connection District 1.
A. SE Four Mile Drive Water Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
S 285F N 498.54F E 315F & -EX PARCEL D BK 7272 PG 963 & PARCEL E BK 7272 PG 964 & BEG 540.15F W OF SE COR OF SEC THN W 249.25F N 1021.02F E 249.9F S 1021.07F TO POB- PARCEL C BK 7277 PG 908 & PARCEL O BK 10289 PG 392 BEG 1534.44F S & 315F W OF E ¼ COR OF SEC THN S86.76F W236.29F N86.76F E 237.25F TO POB SE ¼ LESS RD SEC 31-80-23 GEOPARCEL # 8023-31-400-031
and: PARCEL D BEG 631.9F N OF SE COR THN W 255F N 170.8F E 255F S 170.8F TO POB SE ¼ LESS .26A RD EAS SEC 31-80-23 GEOPARCEL 3 8023-31-400-007
and: LT 1 SPREITZER PROPERTY PLAT 1 GEOPARCEL # 8023-31-400-032
and: -EX BEG 521.19F S & 145.67F W OF NE COR THN SW 169.24F N 119.83F E 118.33F TO POB- N 538F S 800.03F E 264F NE ¼ SE ¼ LESS .741A RD EAS SEC 31-80-23 GEOPARCEL # 8023-31-400-021
and: W 60A S ½ NW ¼ LESS 1.82A RD SEC 32-80-23 GEOPARCEL # 8023-32-151-001
and: -EX S 235F N 1156F E400F W 460F- & -EX BEG 1156F S OF NW COR THN E 460F N 51F E 388.84F NE97.51F E158F S453.16F W1074.58F N 330.3F TO POB- N45A W½ SW¼ & W 275F N1650F E ½ SW ¼ LESS RD SEC 32-90-23 GEOPARCEL # 8023-32-300-001
and: S 235F N 1156F E 400F W 460F N 45A W ½ SW ¼ SEC 32-80-23 GEOPARCEL # 8023-32-300-002
and: BEG 1156F S OF NW COR THN E 460F N51F E388.84F NE 97.51F E158F S453.16F W1074.58F N330.3F TO POB SW ¼ LESS RD SEC 32-80-23 GEOPARCEL # 8023-32-300-003
and: S 35A W ½ SW ¼ & S ½ NW ¼ SE ¼ SW ¼ LESS RD EASM SEC 32-80-23 GEOPARCEL # 8023-32-300-004
and: BEG 77.01F S OF NE COR THN W 46.29F SE 150.87F SE 53.76F N 181.09F TO POB N ½ NE FRL ¼ SEC 6-79-23; AND –EX BEG NE COR THN S 784.61F W TO E ROW LN NE 29TH ST NLY ALG ROW TO N LN E TO POB- N ½ NE FRL ¼ LYG E OF NE 29TH ST SEC 6-79-23; AND –EX RD EAS- & -EX BEG 258.1F S OF NW COR THN SE 227.37F S 119.99F W TO W LN N TO POB- N 780F NW FRL ¼ NW FRL ¼ & -EX 10A NE COR & S 20.65A E 35.65A- N 780F NE FRL ¼ NW FRL ¼ SEC 5-79-23 GEOPARCEL # 7923-05-101-004
BEG 258.1F S OF NE COR THN NW 53.76F SELY 284.1F E TO E LN N TO POB NE FRL ¼ SEC 6-79-23; AND BEG 258.1F S OF NW COR THN SE 227.37F S 119.99F W TO W LN N TO POB N ½ NW FRL ¼ SEC 5-79-23 GEOPARCEL # 7923-05-101-001
B. The owner of any parcel included within the SE Four Mile Drive Water Connection District 1 desiring to make a residential service connection to the SE Four Mile Drive Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such fee is in lieu of, and not in addition to, the fee set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the SE Four Mile Drive Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay a connection fee in the amount of $1,800.00 per acre, or $3,000.00, whichever is greater.
(Ord. 1657 – Jul. 10 Supp.)
10. Crosswinds Business Park Water Main Connection District 1.
A. Crosswinds Business Park Water Main Connection District 1 means and includes only portions of the following described real estate shown on the Crosswinds Business Park Neighborhood Plan #1 dated January 13, 2012:
(Ord. 1798 – Apr. 14 Supp.)
N 1/2 NE 1/4 LYING W OF SE CROSSWINDS DR LESS RD SEC 7-79-23 (Geoparcel 7923-07-200-006); and
-EX E 478.5F- N 1/2 NE 1/4 LYING E OF SE CROSSWINDS DR LESS RD SUBJ TO DRAIN EAS SEC 7-79-23 (Geoparcel 7923-07-200-007); and
S & W OF LN COM E 1/4 COR SEC 7 THN S 171.2F S 247.89F TO BEG THN W 60F TO EXISTING W RD ROW LN N 25.89F NW 70.6F WLY 7.42F ALNG CRV W 571.89F NW 285.63F W 427.09F WLY 121.83F ALNG CRV SW 61.24F SLY 19.46F ALNG CRV SE 10F SW 81.04F NLY 32.77F ALNG CRV NW 64.1F WLY 19.04F ALNG CRV WLY 9.81F ALNG CRV NW 80.5F ELY 31.24F ALNG CRV NE 64.35F NLY 17.66F ALNG CRV NW 1298.41F NLY 263.87F ALNG CRV TO N LN SW 1/4 NE 1/4 BNG NE 1/4 LESS RD SEC 7-79-23 (Geoparcel 7923-07-400-004); and
N & E OF A LN COM E 1/4 COR SEC 7 THN S 171.2F TO BEG THN W 60F TO EXISTING W RD ROW LN SW 65.78F SWLY 91.26F ALNG CRV WLY 1216.29F SWLY 103.8F ALNG CRV SWLY 7.44F ALNG CRV NW 67.92F NWLY 92.33F ALNG CRV NW 1220.48F NELY 250.75F ALNG CRV TO N LN SW 1/4 NE 1/4 BNG NE 1/4 LESS RD SEC 7-79-23 (Geoparcel 7923-07-200-008); and
B. The owner of any parcel included within the Crosswinds Business Park Water Main Connection District 1 shall pay a water connection fee in the amount of $1,139 per acre to the City at the time of site plan approval. Such fee is in addition to the fees set forth in Section 94.05, subsection 1.
(Ord. 1755 – Apr. 13 Supp.)
11. NW 36th Street Water Connection District 1.
A. NW 36th Street Water Connection District 1 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
-EX W 471.5F N 287.4F ON E LN & N 294.4F S 894.4F ON W LN- S 1/2 SW 1/4 LESS RD SEC 3-80-24 GEOPARCEL NUMBER 8024-03-300-004; and
- OUTLOT Y ANKENY ELEMENTARY 10 GEOPARCEL NUMBER 8024-03-401-001; and
PARCEL A BOOK 14618 PAGE 637 E 1/2 SE 1/4 LESS .67A RD SEC 3-80-24 GEOPARCEL NUMBER 8024-03-400-010; and
PARCEL H BK 11793 PG 908 BEG 60.02F N OF SW COR THN N 400.13F E 582.18F S 400.13F W 582.18F TO POB SW 1/4 SW 1/4 SEC 2-80-24 GEOPARCEL NUMBER 8024-02-300-013; and
PARCEL G BK 11793 PG 908 BEG 460.15F N OF SW COR THN N 860.9F E 742.61F S 1260.69F TO N ROW LN OF NW 36TH ST W 160.28F N 400.13F W 582.18F TO POB SW 1/4 SW 1/4 SEC 2-80-24 GEOPARCEL NUMBER 8024-02-300-012; and
-EX COM NE COR SEC 10-80-24 THN W 806.80F ON N LN NE 1/4 NE 1/4 THN S 33F TO POB THN S 27F TO PT ON S ROW LN NW 36TH ST W 14.99F N 27F E 14.66F TO POB- PARCEL B BK 13005 PG 608 BEG 806.8F W OF NE COR THN S 60F E 736.06F TO W ROW LN NW STATE ST SE 14.06F S 685.32F W 447.61F NW 443.08F N 438.31F E14.27F TO POB NE 1/4 NE 1/4 LESS .011A RD EAS SEC 10-80-24 GEOPARCEL NUMBER 8024-10-226-004; and
-EX COM N 1/4 COR SEC 10 S 33F TO POB THN E 195.23F ALNG S ROW LN NW 36TH ST THN S 27F W 195.58F N 27F TO POB- & -EX N 33F RD EAS & BEG CNT SEC THN N 1734.47F NE 291.63F TO SW COR FIELDSTREAM PLAT 1 SELY ALNG CRV 1140.93F SELY ALNG CRV 712.91F E 575.18F NELY ALNG CRV 39.23F TO W ROW LN S 59.85F S 1322.12F TO S LN NE 1/4W1264.37F W 1324.49F TO POB & FIELDSTREAM PLAT 1-W 1/2 NE 1/4 SEC 10-80-24 GEOPARCEL NUMBER 8024-10-201-004
B. The owner of any parcel included within the NW 36th Street Water Connection District 1 desiring to make a residential service connection to the NW 36th Street Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such connection fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the NW 36th Street Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the NW 36th Street Water Main or extensions of mains connected to the NW 36th Street Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the NW 36th Street Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Prior to and through December 31, 2015 | $1,232.60 | $50.07 |
January 1, 2016 | $1,281.90 | $52.07 |
January 1, 2017 | $1,331.20 | $54.07 |
January 1, 2018 | $1,380.50 | $56.07 |
January 1, 2019 | $1,429.80 | $58.07 |
January 1, 2020 | $1,479.10 | $60.07 |
January 1, 2021 | $1,528.40 | $62.07 |
January 1, 2022 | $1,577.70 | $64.07 |
January 1, 2023 | $1,627.00 | $66.07 |
January 1, 2024 and thereafter | $1,676.30 | $68.07 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the NW 36th Street Water Main for the purpose of providing water service to property other than established parcels included in the NW 36th Street Water Connection District 1. It is the intent of this section that, whether or not the NW 36th Street Water Main is hereafter further extended, no direct service connections shall be made to that portion of the NW 36th Street Water Main defined hereunder as the NW 36th Street Water Main, except as provided for hereunder.
(Ord. 1839 - Apr. 15 Supp.)
12. NE 36th Street Water Connection District 1.
A. NE 36th Street Water Connection District 1 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
-EX ALBAUGH ESTS- & -EX BEG SW COR LT 1 ALBAUGH ESTS THN N 67.49F NW 511.31F N 719.48F NW 872.89F N 740F NW 117.15F TO E ROW LN I-35 THN S 300.64F SW 124.64F S 249.13F SE 205.34F SW 414.51F SE 52.73F S 60.86F SW 61.83F S 599.94F S 298.48F E 692.92F TO POB- & -EX BEG 1828.03F N & 336.53F E OF S 1/4 COR THN N 165.06F NE 377.78F S 201.12F SW 354.43F TO POB- SE 1/4 LESS 12.2 A INTST 35 ROW & RD SEC 6-80-23 GEOPARCEL NUMBER 8024-03-300-004; and
PRT PARCEL A W 347.43F N 280F E 100A NE 1/4 LESS .263A RD SEC 7-80-23 GEOPARCEL NUMBER 8023-07-200-008; and
W 60A NE 1/4 LYG ELY & SLY OF I-35 ROW SEC 7-80-23 GEOPARCEL NUMBER 8023-07-200-012
B. The owner of any parcel included within the NE 36th Street Water Connection District 1 desiring to make a residential service connection to the NE 36th Street Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such connection fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the NE 36th Street Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the NE 36th Street Water Main or extensions of mains connected to the NE 36th Street Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the NE 36th Street Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Prior to and through December 31, 2015 | $691.66 | $55.11 |
January 1, 2016 | $719.32 | $57.31 |
January 1, 2017 | $746.99 | $59.51 |
January 1, 2018 | $774.66 | $61.72 |
January 1, 2019 | $802.32 | $63.92 |
January 1, 2020 | $829.99 | $66.13 |
January 1, 2021 | $857.66 | $68.33 |
January 1, 2022 | $885.32 | $70.54 |
January 1, 2023 | $912.99 | $72.74 |
January 1, 2024 and thereafter | $940.65 | $74.94 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the NE 36th Street Water Main for the purpose of providing water service to property other than established parcels included in the NE 36th Street Water Connection District 1. It is the intent of this section that, whether or not the NE 36th Street Water Main is hereafter further extended, no direct service connections shall be made to that portion of the NE 36th Street Water Main defined hereunder as the NE 36th Street Water Main, except as provided for hereunder.
(Ord. 1851 – Jul. 15 Supp.)
13. East 1st Street Rural Water Connection District 1.
A. East 1st Street Rural Water Connection District 1 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
- EX W 700F N 175F- BEG SW COR THN N 2146.9F E 1522F S 443F W 1015.6F S 411.6F W 208.7F S1302.1F W320.4F TO POB SW 1/4 LESS RD SEC 17-80-23
GEOPARCEL NUMBER 8023-17-300-005; and
GEOPARCEL NUMBER 8023-17-300-005; and
N 1/2 N 1/2 NW 1/4 LESS 2.5A RD SEC 20-80-23
GEOPARCEL NUMBER 8023-20-100-001; and
GEOPARCEL NUMBER 8023-20-100-001; and
N 380.21F E 1320F N 1/2 NE 1/4 LESS 1.52A RD SEC 19-80-23
GEOPARCEL NUMBER 8023-19-200-001; and
GEOPARCEL NUMBER 8023-19-200-001; and
-EX N 380.21F E 1320F & PARCEL I BK 8245 PG 716 BEG 796.15F E OF NW COR THN S 414.06F E 258.94F N 414F W 273.11F TO POB- N 1/2 NE 1/4 E OF FRISK DR LESS RD SEC 19-80-23
GEOPARCEL NUMBER 8023-19-200-009; and
GEOPARCEL NUMBER 8023-19-200-009; and
PARCEL I BK 8245 BK 716 BEG 796.15F E OF NW COR THN S 414.06F E 258.94F N 414F W 273.11F TO POB NE 1/4 LESS .331A RD SEC 19-80-23
GEOPARCEL NUMBER 8023-19-200-010
GEOPARCEL NUMBER 8023-19-200-010
B. The owner of any parcel included within the East 1st Street Rural Water Connection District 1 desiring to make a residential service connection to the East 1st Street Rural Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such connection fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the East 1st Street Rural Water Connection District 1 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the East 1st Street Rural Water Main or extensions of mains connected to the East 1st Street Rural Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the East 1st Street Rural Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Prior to and through December 31, 2017 | $4,257.80 | $104.10 |
January 1, 2018 | $4,404.69 | $107.69 |
January 1, 2019 | $4,551.58 | $111.28 |
January 1, 2020 | $4,698.48 | $114.87 |
January 1, 2021 | $4,845.37 | $118.46 |
January 1, 2022 | $4,992.27 | $122.05 |
January 1, 2023 | $5,139.16 | $125.64 |
January 1, 2024 | $5,286.05 | $129.23 |
January 1, 2025 | $5,432.95 | $132.83 |
January 1, 2026 and thereafter | $5,579.84 | $136.42 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the East 1st Street Rural Water Main for the purpose of providing water service to property other than established parcels included in the East 1st Street Rural Water Connection District 1. It is the intent of this section that, whether or not the East 1st Street Rural Water Main is hereafter further extended, no direct service connections shall be made to that portion of the East 1st Street Rural Water Main defined hereunder as the East 1st Street Rural Water Main, except as provided for hereunder.
(Ord. 1899 - Feb. 17 Supp.)
14. NW 18th Street Water Connection District 3.
A. NW 18th Street Water Connection District 3 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
-EX E 33F & S33F RD EAS- & -EX BEG SW COR SEC 9 THN N 50F E 1249.9F NELY 39.02F N 1245.74F E 40F TO NE COR SW 1/4 SW 1/4 S 1320.34F W 1314.69F TO POB- SW 1/4 SW 1/4 SEC 9-80-24
GEOPARCEL NUMBER 8024-09-300-013; and
GEOPARCEL NUMBER 8024-09-300-013; and
-EX BEG SE COR SEC THN W 248.05F N 23.65F NELY ALNG CRV 29.24F NELY ALNG CRV 219.43F E 1.05F S 50F TO POB- PARCEL 2019-236 BK 17573 PG 282 BEG SE COR SEC 8 THN W 248F N 352F W 410F W 106.5F NW 254.01F N 1039.1F E 934F S 268F S 1325.92F TO POB LESS 0.23A RD E 1/2 SE 1/4 SEC 8-80-24
GEOPARCEL NUMBER 8024-08-400-013; and
GEOPARCEL NUMBER 8024-08-400-013; and
-PARCEL A BK 10865 PG 248 BEG 248F W OF SE COR THN W410F N352F E410F S 352F TO POB SE 1/4 SE ¼ LESS .31A RD SEC 8-80-24
GEOPARCEL NUMBER 8024-08-400-010; and
GEOPARCEL NUMBER 8024-08-400-010; and
-S 1/2 NE 1/4 SE 1/4 & SE 1/4 SE 1/4 -EX PARCEL 2019-236 BK 17573 PG 282- & -EX PARCEL A BK 10865 PG 248- & -EX BEG SW COR SE 1/4 SE 1/4 SEC 8 THN N 50F E 439.83F SELY ALNG CRV 215.72F S 31.43F W 654.51F TO POB- SEC 8-80-24
GEOPARCEL NUMBER 8024-08-400-014; and
GEOPARCEL NUMBER 8024-08-400-014; and
-SW 1/4 SE 1/4 SEC 8-80-24
GEOPARCEL NUMBER 8024-08-400-005
GEOPARCEL NUMBER 8024-08-400-005
B. The owner of any parcel included within the NW 18th Street Water Connection District 3 desiring to make a residential service connection to the NW 18th Street Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such connection fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the NW 18th Street Water Connection District 3 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the NW 18th Street Water Main or extensions of mains connected to the NW 18th Street Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the NW 18th Street Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Effective Date | Water Connection Fee (per acre) | Water Connection Fee (per frontage foot) |
Prior to and through December 31, 2021 | $2,636.26 | $93.23 |
January 1, 2022 | $2,653.13 | $93.83 |
January 1, 2023 | $2,670.00 | $94.43 |
January 1, 2024 | $2,686.87 | $95.03 |
January 1, 2025 | $2,703.74 | $95.63 |
January 1, 2026 | $2,720.61 | $96.23 |
January 1, 2027 | $2,737.48 | $96.83 |
January 1, 2028 | $2,754.35 | $97.43 |
January 1, 2029 | $2,771.22 | $98.03 |
January 1, 2030 and thereafter | $2,788.09 | $98.63 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the NW 18th Street Water Main for the purpose of providing water service to property other than established parcels included in the NW 18th Street Water Connection District 3. It is the intent of this section that, whether or not the NW 18th Street Water Main is hereafter further extended, no direct service connections shall be made to that portion of the NW 18th Street Water Main defined hereunder as the NW 18th Street Water Main, except as provided for hereunder.
(Ord. 2068 - Oct. 21 Supp.)
15. NW Weigel Drive Water Connection District 2.
A. NW Weigel Drive Water Connection District 2 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
-S 250 F W 120 F NE 1/4 SW 1/4 LESS .19 A RD SEC 9-80-24 & S 250F E 80F W 200F NE 1/4 SW 1/4 SEC 9-80-24
GEOPARCEL NUMBERS 8024-09-300-007 & 8024-09-300-008; and
GEOPARCEL NUMBERS 8024-09-300-007 & 8024-09-300-008; and
-EX S 250F W 200F- S 1/2 NE 1/4 SW 1/4 LESS .31A RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-300-006; and
GEOPARCEL NUMBER 8024-09-300-006; and
-N 1/2 NE 1/4 SW 1/4 S OF UP RR LESS .5A RD EAS SEC 9-80-24
GEOPARCEL NUMBER 8024-09-300-005; and
GEOPARCEL NUMBER 8024-09-300-005; and
-E 1/2 NW 1/4 LYG SW OF RY LESS RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-100-004; and
GEOPARCEL NUMBER 8024-09-100-004; and
-E 1/2 NW 1/4 LYG NE OF RY LESS RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-100-005
GEOPARCEL NUMBER 8024-09-100-005
-EX S 629.52F N 1458.35F E 278.32F- W 1/2 NW ¼ LYG NE OF RY LESS RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-100-001
GEOPARCEL NUMBER 8024-09-100-001
-W 1/2 NW 1/4 LYG SW OF RY LESS RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-100-003
GEOPARCEL NUMBER 8024-09-100-003
-EX S 272.25F N 1106.36F W 160F E193F- NW 1/4 SW 1/4 LESS RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-300-001
GEOPARCEL NUMBER 8024-09-300-001
-S 272.25F N 1106.36F W 160F E 193F NW 1/4 SW ¼ SEC 9-80-24
GEOPARCEL NUMBER 8024-09-300-002
GEOPARCEL NUMBER 8024-09-300-002
-EX E 33F RD EAS- S 629.52F N 1458.35F E 278.32F W 1/2 NW 1/4 SEC 9-80-24
GEOPARCEL NUMBER 8024-09-100-002
GEOPARCEL NUMBER 8024-09-100-002
-W 1/2 SW 1/4 -EX N 719 FT- LESS 2.5 A RD SEC 4-80-24
GEOPARCEL NUMBER 8024-04-300-002
GEOPARCEL NUMBER 8024-04-300-002
-S 36.50 A E 1/2 SW 1/4 LESS 2 A RD SEC 4-80-24
GEOPARCEL NUMBER 8024-04-300-005
GEOPARCEL NUMBER 8024-04-300-005
-NW 1/4 NE 1/4 LESS .99A RD SEC 9-80-24
GEOPARCEL NUMBER 8024-09-200-001
GEOPARCEL NUMBER 8024-09-200-001
-EX S 379.5F- NE 1/4 NE 1/4 LESS 2.04A RD SEC 09-80-24
GEOPARCEL NUMBER 8024-09-200-003
GEOPARCEL NUMBER 8024-09-200-003
-S 1/2 SE 1/4 LESS RD SEC 4-80-24
GEOPARCEL NUMBER 8024-04-400-002
GEOPARCEL NUMBER 8024-04-400-002
B. The owner of any parcel included within the NW Weigel Drive Water Connection District 2 desiring to make a residential service connection to the NW 36th Street and NW Weigel Drive Water Main shall pay a connection fee in the amount of $3,000.00 to the City. Such connection fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. In the event any parcel within the NW Weigel Drive Water Connection District 2 is developed for industrial or commercial use, or is subdivided for industrial, commercial or residential use and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fees for the right to make connections to the NW 36th Street and NW Weigel Drive Water Main or extensions of mains connected to the NW 36th Street and NW Weigel Drive Water Main as is necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a water main extension to serve a subdivision. The fees are determined in two components: cost per frontage foot on the NW 36th Street and NW Weigel Drive Water Main, or cost per acre within the subdivision plat. The cost for each component is as follows, and the total connection fee will be the least of the two components, or $3,000.00, whichever is greater:
Water Connection Fee | ||
Effective Date | (per acre) | (per frontage foot) |
Prior to and through December 31, 2022 | $2,975.18 | $85.57 |
January 1, 2023 | $3,055.21 | $91.48 |
January 1, 2024 | $3,135.24 | $97.39 |
January 1, 2025 | $3,215.27 | $103.30 |
January 1, 2026 | $3,295.30 | $109.21 |
January 1, 2027 | $3,375.33 | $115.12 |
January 1, 2028 | $3,455.36 | $121.03 |
January 1, 2029 | $3,535.39 | $126.94 |
January 1, 2030 | $3,615.42 | $132.85 |
January 1, 2031 and thereafter | $3,695.45 | $138.76 |
Such connection fee is in addition to the fees set forth in Section 94.04, subsections 1 through 4.
D. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the NW 36th Street and NW Weigel Drive Water Main for the purpose of providing water service to property other than established parcels included in the NW Weigel Drive Water Connection District 2. It is the intent of this section that, whether or not the NW 36th Street and NW Weigel Drive Water Main is hereafter further extended, no direct service connections shall be made to that portion of the NW 36th Street and NW Weigel Drive Water Main defined hereunder as the NW 36th Street and NW Weigel Drive Water Main, except as provided for hereunder.
(Ord. 2122 - Nov. 22 Supp.)
The following sewer connection districts have been established and all connection requirements provided in this chapter shall apply.
1. Seasons Ridge Sanitary Sewer Connection District I.
A. The “Seasons Ridge Sanitary Sewer Connection District I” means and includes only the following described real estate:
(1) “Seasons Ridge Sanitary Sewer Extension I” means the sanitary sewer installed along and adjacent to Golfview Acres Plats 3 and 5, official plats now included in and forming a part of the City.
(2) “Seasons Ridge Sanitary Sewer Connection District I” means and includes only the following described real estate:
Lots 1, 2, 3, 4, 5, 6, 7, 8, 9 and 15 in Golfview Acres Plat 3, an official plat now included in and forming a part of the City; and
Lots 1, 2, 3, 4 and 5 in Golfview Acres Plat 5, an official plat now included in and forming a part of the City.
B. The owner of any lot included within the Seasons Ridge Sanitary Sewer Connection District I desiring to make a service connection to the Seasons Ridge Sanitary Sewer Extension I shall pay a connection fee to the City in the amount of $2,000.00 for the right of make such connection. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4. In the event any such lot is subdivided and additional residential structures are permitted thereon, the owner of each such structure shall be required to pay an additional $2,000.00 fee.
C. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Seasons Ridge Sanitary Sewer Extension for the purpose of providing sanitary sewer service to property other than property included in the Seasons Ridge Sanitary Sewer Connection District I. It is the intent of this section that, whether or not the Seasons Ridge Sanitary Sewer Extension is hereafter further extended, no direct service connections shall be made to that portion of the Seasons Ridge Sanitary Sewer Extension defined hereunder as the Seasons Ridge Sanitary Sewer Extension I except as provided for hereunder.
2. Oralabor Road Trunk Sewer Connection District 1.
A. For the purposes of this section, the following terms have the following meanings:
(1) “Oralabor Road Trunk Sewer Project” means the eighteen-inch diameter and twelve-inch diameter gravity trunk sewer extending from the WRA Four Mile Interceptor Extension sewer north of SE Oralabor Road (County NE 78
th
Avenue) northwesterly under SE Four Mile Drive (County NE 29
th
Street) to a point near the north line of the SE¼ SE¼ of Section 30 Township 80 North Range 23 West of the 5
th
P.M.
(2) “Oralabor Road Trunk Sewer Connection District 1” means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Beginning at the SE corner of Section 30-80-23; thence N. 89°59'17" W. along the south line of said Section 30-80-23, a distance of 1,728.62 feet; thence N. 01°28'18" W., 355.10 feet to the south line of Lot 3, LGI Business Park, an O.P.; thence N. 89°59'17" W. along said south line of said Lot 3, 153.05 feet to the SW corner of said Lot 3; thence N. 25°08'11" E., along the west line of said LGI Business Park, a distance of 285.21 feet, said west line also being the east line of Metro North II – Plat Two, an O.P.; thence continuing along said east line of Metro North II – Plat Two, N. 14°04'24" E., a distance of 457.02 feet; thence N. 04°54'17" E., a distance of 423.03 feet to the NE corner of said Metro North II – Plat Two, said point also being the SE corner of Metro North II – Plat Three, an O.P.; thence N. 04°54'17" E. along the east line of said Metro North II – Plat Three, 90.06 feet; thence N. 00°00'30" E., 911.28 feet to the NE corner of said Metro North II – Plat Three; thence N. 89°59'30" W. along the north line of Metro North II – Plat Three, a distance of 601.88 feet; thence continuing along said north line of said Plat Three, S. 55°17'58" W., 70.00 feet; thence N. 89°59'30" W., 466.64 feet to the NW corner of said Plat Three, said point also being on the east line of Lot 4, Metro North II – Plat One; thence N. 0°00'30" E. along said east line of Lot 4, 203.52 feet to the north line of the SW¼ of Section 30-80-23; thence S. 89°52'44" E. along the north line of the SW¼ of Section 30-80-23; 105.00 feet to the center of Section 30-80-23; thence easterly along the north line of the SE¼ of Section 30-80-23 to the west line of the E. thirty acres of the NE¼ SE¼ Section 30-80-23; thence southerly along the west line of the east thirty acres of the NE¼ SE¼ Section 30-80-23 to the north line of Parcel “D” as shown on the plat of survey recorded in Book 8043, Page 803; thence S. 89°56'01" E. along the north line of said Parcel “D” to the NW corner of LGI Business Park; thence continuing S. 89°56'0l" E. along the north line of LGI Business Park, 452.94 feet to the NE corner of LGI Business Park, and continuing easterly along the north line of the SE¼ SE¼ Section 30-80-23, 330 feet to the NE corner of the SE¼ SE¼ Section 30-80-23; thence easterly along the north line of the SW¼ SW¼ Section 29-80-23 to the west right-of-way line of NE 29th Street; thence southerly along said west right-of-way line of NE 29th Street to the north line of Lot 2 of the O.P. SW¼ SW¼ Section 29-80-23; thence easterly to the NE corner of said Lot 2; thence southerly along the east line of Lots 2 and 3 of the O.P. of the SW¼ SW¼ Section 29-80-23 to the south line of the SW¼ SW¼ Section 29-80-23; thence westerly along said south line to the point of beginning.
B. The owners of residences on parcels of less than one acre in size may connect such residences to the Oralabor Road Lift Station and Trunk Sewer Project upon approval of their application for connection, approval of the size of the connection, and payment of a connection fee in the amount of $2,600.00 to the City. Such fee is in lieu of, and not in addition to, the fees set forth in Section 94.04, subsections 1 through 4.
C. The owners of residences on parcels in excess of one acre in size may connect such residences to the Oralabor Road Lift Station and Trunk Sewer Project upon payment of a connection fee in the amount of $2,600.00 per acre. However, the owner may divide said parcel into a residence parcel of no more than one acre and a remainder parcel, and pay the connection fee in the amount of $2,600.00 for the residence parcel. The connection fee for the remainder parcel shall be payable at such time as the remainder parcel shall be connected to the Oralabor Road Lift Station and Trunk Sewer Project. For purposes of this section, division of the property into a residence parcel and a remainder parcel may be accomplished by submitting a drawing showing a graphical depiction of the two parcels including dimensions accurate to within a distance of one foot, a legal description of the entire parcel and a legal description of the residence parcel with such accuracy as to allow the City to determine a reasonable description of the remainder parcel. For purposes of this section, the division of property does not require a subdivision of the property or a plat of survey.
D. In the event any parcel within the Oralabor Road Lift Station and Trunk Sewer Connection District I is developed for industrial or commercial use, or is subdivided and additional structures are permitted thereon, the owner or developer of the parcel shall be required to pay the fee for the right to make connections to the Oralabor Road Trunk Sewer or extensions of sewer mains connected to the Oralabor Road Trunk Sewer as necessary for their development. The fee will be paid prior to the connection, in the case of service connections to industrial or commercial buildings, or prior to City approval of construction contracts for a sewer main extension to serve a subdivision. The fee is determined at a rate of $2,600.00 per acre for the entire parcel being developed or subdivided.
E. Nothing in this section is intended to preclude future further extensions, by the City or upon approval of the City, of the Oralabor Road Trunk Sewer or sewer mains connected to the Oralabor Road trunk sewer, or sewer mains connected to the Oralabor Road lift station for the purpose of providing sanitary sewer service to property other than established parcels included in the Oralabor Road Lift Station and Trunk Sewer Connection District I. It is the intent of this section that, whether or not the Oralabor Road Trunk Sewer is hereafter further extended, no connections shall be made to that Oralabor Road Lift Station and Trunk Sewer Project or extension except as provided for hereunder.
3. Rock Creek Trunk Sewer Connection District 1.
A. The “Rock Creek Trunk Sewer Connection District 1” means and includes only the following described real estate:
Beginning at the SE Corner of Section 17, Township 80 North, Range 24 West of the 5th P.M. (Section 17-80-24); thence west along the south line of Section 17-80-24 to the SW corner of the SE 1/4 SW 1/4 of Section 17-80-24; thence north along the west line of the E 1/2 SW 1/4 of Section 17-80-24 to the NW corner of the NE 1/4 SW 1/4 of Section 17-80-24; thence east along the north line of the NE 1/4 SW 1/4 to the center of Section 17-80-24; thence north along the west line of the NE 1/4 of Section 17-80-24 to the NW corner of the NW 1/4 NE 1/4 of Section 17-80-24; thence east along the north section line of Section 17-80-24 to the NE Corner of the NW 1/4 NE 1/4 of Section 17-80-24; thence south along the east line of the NW 1/4 NE 1/4 of Section 17-80-24 to the SE corner of the NW 1/4 NE 1/4 of Section 17-80-24; thence east along the north line of the SE 1/4 NE 1/4 of Section 17-80-24 to the NE corner of the SE 1/4 NE 1/4 of Section 17-80-24;
thence east along the north line of the S 1/2 NW 1/4 of Section 16, Township 80 North, Range 24 West of the 5th P.M. (Section 16-80-24); to the NE comer of the S 1/2 NW 1/4 of Section 16-80-24; thence east 623.27 feet along the north line of the of S 1/2 NE 1/4 of Section 16-80-24 to the SW corner of Lot 31, Hidden Creek Plat 3, an Official Plat; thence northerly along the west plat boundary to the NW corner of Lot 32, Hidden Creek Plat 3; thence easterly 175.17 feet along the north plat boundary to the NE corner of Lot 33, Hidden Creek Plat 3; thence south 138.44 feet along the east lot line of Lot 33, Hidden Creek Plat 3 to the SE corner of Lot 33, Hidden Creek Plat 3, said point also being on the north right-of-way line of NW 14th Street; thence west along said north right-of-way line to a point at the centerline of NW Boulder Drive extended; thence south 30.00 feet to the centerline of NW 14th Street and its intersection with NW Boulder Drive; thence continuing south along the centerline of NW Boulder Drive 200.00 feet to the south plat boundary, Hidden Creek Plat 3;
thence south 190.04 feet along the centerline of NW Boulder Drive to the south right-of-way line of NW 13th Street, Boulder Brook Plat 15, an Official Plat; thence southwesterly along the centerline of NW Boulder Drive to the north line of Lot 161, Boulder Brook Plat 15 extended; thence southeasterly 30.00 feet to the to the NW Corner of Lot 161, Boulder Brook Plat 15; thence southeasterly along the north line of Lot 161 to the NE Corner of Lot 161, Boulder Brook Plat 15; thence southwesterly 12.41 feet to the NW Corner of lot 79, Boulder Brook Plat 14, an Official Plat; thence southeasterly along the north lot line of Lot 79 and continuing on said north line extended, 155.00 feet to the centerline of NW Rolling Rock Road, Boulder Brook Plat 14; thence northeasterly along the centerline of NW Rolling Rock Road to the centerline of NW Rockcrest Road, Boulder Brook Plat 14; thence southeasterly along the centerline of NW Rockcrest Road to the south lot line of Lot 61, Boulder Brook Plat 14 extended; thence west 30.00 feet to the westerly right-of-way line of NW Rockcrest Road and continuing west 28.31 feet along the south line of Lot 61, Boulder Brook Plat 14 to the NE Corner of Lot 62, Boulder Brook Plat 14; thence southwesterly 721.08 feet along the eastern lots lines of Lots 62 - 68 and Lot 42 to the SE Corner of Lot 42, Boulder Brook Plat 14 and continuing that alignment to the centerline of NW Rockridge Road, Boulder Brook Plat 14; thence southeasterly along the centerline of NW Rockridge Road to a point perpendicular to the north lot line of Lot 40, Boulder Brook Plat 14 extended; thence southwesterly 30.00 feet to the northeast corner of Lot 40, Boulder Brook Plat 14, and continuing along the north lot line of Lot 40, Boulder Brook Plat 14 127.95 feet to the NW Corner of Lot 40, Boulder Brook Plat 14; thence southeasterly 838.12 feet along the south lot lines of Lots 40 — 32, Boulder Brook Plat 14 and continuing to the centerline of NW Rockcrest Road, Boulder Brook Plat 14; thence south along the centerline of NW Rockcrest Road to the centerline of NW Boulder Point Place, Boulder Brook Plat 14; thence east along the centerline of NW Boulder Point Place 155.00 feet to the east plat boundary, Boulder Brook Plat 14; thence south along the east line of the NW 1/4 SE 1/4 of Section 16-80-24 to the SE corner of the NW 1/4 SE 1/4 of Section 16-80-24; thence west along the south line of the NW 1/4 SE 1/4 of Section 16-80-24 to the SW corner of the NW 1/4 SE 1/4 of Section 16-80-24; thence west along the south line of the N 1/2 SW 1/4 of Section 16-80-24 to a point on the west lot line of Street Lot “A”, Watercrest Plat 4, an Official Plat;
thence northerly along the west lot line of Lot “A”, Watercrest Plat 4 to the SE corner of Outlot Z, Watercrest Plat 4; thence west 769.66 feet along the south lot line of Outlot Z, Watercrest Plat 4 to the SW corner of Outlot Z, Watercrest Plat 4; thence north along the west lot line of Outlot Z, Watercrest Plat 4 to a point on the north line of the SW 1/4 of Section 16-80-24; thence west along the north line of the SW 1/4 of Section 16-80-24 to the NW corner of the SW 1/4 of Section 16-80-24; thence south along the west line of the SW 1/4 of Section 16-80-24 to the point of beginning.
and: -EX BEG 220F NE OF SW COR SE 1/4 NW 1/4 OF SEC THIN SE 79.5F NWLY 273F NELY 53.7F SE 203.4F TO POB RD EAS - LT 1 VADEN PLACE GEOPARCEL # 8024-17-177-007
and: -EX BEG W COR NE 35F SE 63.4F SWLY 53.7F TO N ROW HWY 415 NW 84.2F TO POB- LOT A & ALL LOT 3 VADEN PLACE GEOPARCEL # 8024-17-177-002
and: -EX BEG SW COR THN N 52.8F SE 41.6F SW 35F TO POB- LOT 4 SUBJ TO .07A POND EAS VADEN PLACE GEOPARCEL # 8024-17-177-008
and: LT 2 VADEN PLACE GEOPARCEL # 8024-17-177-004
and: -EX BEG 33F N & 30F W OF SE COR THN W 565.13F NE 147.36F E 420.52F S 26.78F TO POB RD EAS & E 30F N 434F S 467F & MINK ACRES & VADEN PLACE- E 1/2 NW 1/4 LESS RD SEC 17-80-24 GEOPARCEL # 8024-17-126-001
B. The owner of any parcel included within the Rock Creek Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre – 1 acre minimum) |
Prior to and through December 31, 2007 | $ 2,350.00 |
January 1, 2008 | $ 2,540.00 |
January 1, 2009 | $ 2,730.00 |
January 1, 2010 | $ 2,920.00 |
January 1, 2011 | $ 3,110.00 |
January 1, 2012 | $ 3,300.00 |
January 1, 2013 | $ 3,490.00 |
January 1, 2014 | $ 3,680.00 |
January 1, 2015 | $ 3,870.00 |
January 1, 2016 and thereafter | $ 4,060.00 |
C. Connection fees established by this section, or any part of said connection fees, may be used to pay the costs associated with the Rock Creek Phase III Sanitary Trunk Sewer Project in accordance with the Development Agreement dated April 3, 2006, between the City of Ankeny and DML Land Development, L.C.
4. Otter Creek Trunk Sewer Connection District 1.
A. Otter Creek Trunk Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
The Southwest Fractional ¼ of Section 6, Township 80 North, Range 23 West of the 5th P.M. (Section 6-80-23); less 7 acres Interstate Highway 35 right-of-way and 6.74 acres road; GEOPARCELS # 8023-06-300-001, # 8023-06-300-002, and # 8023-06-300-003; and
Lots 1 and 2, Albaugh Golf and Commercial Plat 1, an Official Plat; GEOPARCELS # 8023-07-126-002 AND # 8023-07-126-003.
B. The owner of any parcel included within the Otter Creek Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Connection Fee (per acre – 1 acre minimum) |
Prior to and through December 31, 2007 | $ 1,711.00 |
January 1, 2008 | $ 1,769.00 |
January 1, 2009 | $ 1,827.00 |
January 1, 2010 | $ 1,885.00 |
January 1, 2011 | $ 1,943.00 |
January 1, 2012 | $ 2,001.00 |
January 1, 2013 | $ 2,059.00 |
January 1, 2014 | $ 2,117.00 |
January 1, 2015 | $ 2,175.00 |
January 1, 2016 and thereafter | $ 2,233.00 |
5. SE Four Mile Drive Trunk Sewer Connection District 1.
A. SE Four Mile Drive Trunk Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Clover Ridge West Plat 1, an official plat; and
Hillside Estates Plat 1, an official plat; and
Clover Ridge Plat 1, an official plat; and
Clover Ridge Plat 2, an official plat; and
Clover Ridge Plat 3, an official plat; and
Clover Ridge West Plat 4, an official plat; and
N 10A S 20A SE¼ NW¼ lying W of RD Sec 29-80-23 GEOPARCEL # 8023-29-100-007; and
S 10A SE¼ NW¼ lying W of RD Sec 29-80-23 GEOPARCEL # 8023-29-100-008.
B. The owner of any parcel included within the SE Four Mile Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Connection Fee (per acre – 1 acre minimum) |
Prior to and through December 31, 2007 | $ 2,105.00 |
January 1, 2008 | $ 2,176.00 |
January 1, 2009 | $ 2,247.00 |
January 1, 2010 | $ 2,318.00 |
January 1, 2011 | $ 2,389.00 |
January 1, 2012 | $ 2,460.00 |
January 1, 2013 | $ 2,531.00 |
January 1, 2014 | $ 2,602.00 |
January 1, 2015 | $ 2,673.00 |
January 1, 2016 and thereafter | $ 2,744.00 |
6. Nicholas Heights Sanitary Sewer Connection District 1.
A. Nicholas Heights Sanitary Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Lots 1 through 4 and Lots 8 through 11, Nicholas Heights, an official plat; and
Except the west 550 feet of Lots 5 through 7, Nicholas Heights, an official plat.
B. The owner of any parcel included within the Nicholas Heights Sanitary Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Connection Fee (per parcel) |
Prior to and through December 31, 2007 | $ 2,037.28 |
January 1, 2008 | $ 2,128.14 |
January 1, 2009 | $ 2,219.01 |
January 1, 2010 | $ 2,309.87 |
January 1, 2011 | $ 2,400.73 |
January 1, 2012 | $ 2,491.59 |
January 1, 2013 | $ 2,582.46 |
January 1, 2014 | $ 2,673.32 |
January 1, 2015 | $ 2,764.18 |
January 1, 2016 and thereafter | $ 2,855.04 |
7. Otter Creek Trunk Sewer Connection District 2.
A. Otter Creek Trunk Sewer Connection District 2 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
-EX ALBAUGH ESTS- SE 1/4 LESS 12.2 A INTST 35 ROW & RD SEC 6-80-23 (GEOPARCEL # 8023-06-400-001)
and: OUT LOT Z ALBAUGH ESTATES (GEOPARCEL # 8023-06-400-002)
and: -EX 2.7 A INTST =35- SW 1/4 NE FRL 1/4 SEC 6-80-23 (GEOPARCEL # 8023-06-200-002)
B. The owner of any parcel included within the Otter Creek Trunk Sewer Connection District 2 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre—1 acre minimum) |
Prior to and through December 31, 2008 | $ 2,445 |
January 1, 2009 | $ 2,527 |
January 1, 2010 | $ 2,613 |
January 1, 2011 | $ 2,701 |
January 1, 2012 | $ 2,792 |
January 1, 2013 | $ 2,887 |
January 1, 2014 | $ 2,984 |
January 1, 2015 | $ 3,085 |
January 1, 2016 | $ 3,190 |
January 1, 2017 and thereafter | $ 3,297 |
(Ord. 1619 – Oct. 08 Supp.)
8. Crosswinds Trunk Sewer Connection District 1.
A. Crosswinds Trunk Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
EX COM SW COR THN E 1246.93F NE 970.08F E 138.28F TO BEG THN NE 144.42F NELY 1245.44F N 999.71F NE 15.32F SE 735.22F S 1010.13F S 338.1F SE 318.65F W 228.11F TO POB- BEG 572.26F N OF CNTR OF SEC THN N 415.28F W1354.98F NLY 1024.7F TO N LN E 1991.85F S 1462.98F W 735.15F TO POB N 1/2 SEC 6-79-23 GEOPARCEL # 7923-06-100-018
AND: CORPORATE WOODS BUSINESS PARK PLAT 2, AN OFFICIAL PLAT
AND: CORPORATE WOODS BUSINESS PARK PLAT 1, AN OFFICIAL PLAT
AND: EX COM SW COR OF SEC THN E 1041.8F ALNG S LN N 55F TO N ROW LN NE 62ND AV & POB THN NE 623.25F NE 651.55F ALNG EXISTING ROW LN I-35 E 197.44F SW 423.04F SW 888.62F TO N ROW LN NE 62ND AV W TO POB- BEG 1033.1F E & 55.7F N OF SW COR OF SEC THN E 624F NE 394.1F NELY 355.7F N 773.6F W 1001.6F SW 1275.2F TO POB SW 1/4 SEC 6-79-23 GEOPARCEL # 7923-06-300-017
AND: EX E 210F S 416F & W 150F E 360F S 367F- SW FRL 1/4 LYG S & E OF RY LESS RD SEC 6-79-23 GEOPARCEL # 7923-06-300-008
AND: BEG 50F N & 210F W OF SE COR THN N 317F W 150F S 317F E 150F TO POB SW FRL 1/4 SEC 6-79-23 GEOPARCEL # 7923-06-300-009
AND: E 210F S 416F SW FRL 1/4 LESS RD SEC 6-79-23 GEOPARCEL # 7923-06-300-010
AND: EX PARCEL I BK 8629 PG 421 BEG 1327.15F E & 779.03F N OF S 1/4 COR SEC 6 THN W 845.01F NE 566.28F E 761.81F S 541.67F TO POB- SW 1/4 SE 1/4 LYING SW OF CORPORATE WOODS DR LESS RY & RD SEC 6-79-23 GEOPARCEL # 7923-06-400-025
AND: BEG 202.7F N OF SE COR THN NWLY 771.51F NW 37.31F E TO E LN S TO POB SW 1/4 SE 1/4 SEC 6-79-23 GEOPARCEL # 7923-06-400-026
AND: EX S 240F E 316.23F- & -EX PAR A BK 7359 PG 636- & -EX BEG 316.33F W SE COR THN W 1010.88F N 202.7F SELY ALNG CUR 603.59F E 440.6F S TO POB- BEG 316.23F E OF SE COR THN W TO SW COR N 430F SELY 1010F TO PT 385F N OF S LN THN S TO POB SE 1/4 SE 1/4 SEC 6-79-23 GEOPARCEL # 7923-06-400-027
AND: EX S 33F & E60F RD EAS- S 206.16F E 316.23F SE 1/4 SE 1/4 SEC 6-79-23 GEOPARCEL # 7923-06-400-006
AND: PARCEL A N334.38F S540.54F E316.23F SE 1/4 LESS .46A RD EAS SEC 6-79-23 GEOPARCEL # 7923-06-400-012
AND: EX PAR G 8629-419 BEG 1327.15F E & 779.03F N OF S 1/4 COR SECTION 6 THN N 541.67F W 1170.17F TO S LN RR ROW NE ALONG RR ROW 912.86F NW 50F NELY 1220.27F S 501.35F SE 876.36F W 904.99F TO POB- NW 1/4 SE1/4 LYG S OF RR ROW & -EX E 60F RD EAS- & -EX PAR A N 334.38F S 540.54F E 316.23F SE 1/4- & -EX S 206.16F E 316.23F SE 1/4- & -EX BEG SE COR THN W TO SW COR N 430F SE 1010F TO PT 385F N OF S LN THN S TO PT 314.5F W & 240F N OF SE COR E 314.5F S240F TO POB- E 1/2 SE 1/4 LYG SE OF RR ROW SEC 6-79-23 GEOPARCEL # 7923-06-400-020
AND: EX S 1065.15F- W 757F S OF RR LESS RD SW 1/4 SEC 5-79-23 GEOPARCEL # 7923-05-300-001
AND: EX W 60F RD- BEG 1040.15F N OF SW COR THN E 1155F THN N TO PT 330F S OF N LN THN W TO PT 1584F W OF E LN THN N TO S LN RR THN SWLY ALNG RR TO PT 757F E OF W LN & 1064.5F N OF S LN THN W 757F TO W LN THN S 25F TO POB SW 1/4 SEC 5-79-23 GEOPARCEL # 7923-05-300-002
AND: PARCEL D S1039.5F W1155F SW 1/4 SW 1/4 LESS 2.94A RD SEC 5-79-23 GEOPARCEL # 7923-05-300-008
AND: N 1/2 NW FRL 1/4 LYG BET RY ROW & I-35 & S OF NE 62ND AVE SEC 7-79-23 GEOPARCEL # 7923-07-100-005
AND: EX COM W 1/4 COR THN E 1299.81F NW 845.77F E 113.55F TO BEG THN NW 557F NE 515.22F SE 231.44F SE 330.78F SE 507.37F W500.63F TO POB- NWFRL1/4 LYG E OF RR ROW & E OF I-35 & N OF S LN OF N33A OF S 1/2 LESS RD SEC 7-79-23 GEOPARCEL # 7923-07-100-008
AND: EX E 478.5F- N 1/2 NE 1/4 LESS RD SUBJ TO DRAIN EAS SEC 7-79-23 GEOPARCEL # 7923-07-200-001
AND: EX S 240F NLY 1154.12F E 110F- E 478.5F N 1/2 NE 1/4 LESS RD SEC 7-79-23 GEOPARCEL # 7923-07-200-005
AND: 1 SQUARE A NW COR NW 1/4 NW 1/4 LESS .458A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-001
AND: EX 1 SQUARE A NW COR & PARCEL F BK 8529 PG 964 BEG 884.67F E OF NW COR THN E 435F S 545F W 435F N 545F TO POB & BEG 1314.2F N OF W 1/4 COR OF SEC THN N 258F ALNG W LN E 100F S 258F W 100F TO POB- NW 1/4 NW 1/4 LESS 2.24A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-009
AND: PARCEL F N 545F E 435F NW 1/4 NW 1/4 LESS .44A RD SEC 8-79-23 GEOPARCEL # 7923-08-100-008
AND: S 54.25A NW FRL 1/4 E OF I 35 SEC 7-79-23 GEOPARCEL # 7923-07-100-009
AND: S 1/2 NE 1/4 LESS 1.81A RD SEC 7-79-23 GEOPARCEL # 7923-07-200-003
AND: N 1/2 SW 1/4 NW 1/4 LESS RD SEC 8-79-23 GEOPARCEL # 7923-08-100-003
AND: LOT 1 SULT ACRES GEOPARCEL # 7923-08-100-004
AND: NE 1/4 SW FRL 1/4 E OF I 35 SEC 7-79-23 GEOPARCEL # 7923-07-300-011
AND: N 1/2 SE 1/4 LESS 1.81A RD SEC 7-79-23 GEOPARCEL # 7923-07-400-001
AND: N 195F W 314F NW 1/4 SW 1/4 LESS RD SEC 8-79-23; AND S 80F W 314F SW 1/4 NW 1/4 LESS RD SEC 8-79-23 GEOPARCEL # 7923-08-300-001
AND: PARCEL B BEG 195F S OF NW COR THN E 314F N 170.02F E 1007.21F S 631.25F W 1316.06F N 461.16F TO POB NW 1/4 SW 1/4 LESS .63A RD SEC 8-79-23 GEOPARCEL # 7923-08-300-009
AND: PARCEL C BEG 656.16F S OF NW COR THN E 1316.06F S 666.45F W 860.17F N 208.71F W 450.42F N 453.54F TO POB NW 1/4 SW 1/4 LESS .62A RD SEC 8-79-23 GEOPARCEL # 7923-08-300-010
AND: SW 1/4 SE 1/4 LESS 1 A RD SEC 7-79-23 GEOPARCEL # 7923-07-400-002
AND: SE 1/4 SE 1/4 LESS 2.44A RD SEC 7-79-23 GEOPARCEL # 7923-07-400-003
AND: S 416F N 493F W 225F SW 1/4 SW 1/4 LESS RD SEC 8-79-23 GEOPARCEL # 7923-08-300-004
AND: S 208.71F W450.42F NW1/4 SW1/4 & -EX S 416F N493F W 225F & BEG 60F E OF SW COR THN N 70F E 453.5F NE 553.48F SWLY 338.35F W 760F TO POB- SW1/4 SW 1/4 LYG N OF RR ROW LESS RD SEC 8-79-23 GEOPARCEL # 7923-08-300-008
B. The owner of any parcel included within the Crosswinds Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre—1 acre minimum) |
Prior to and through December 31, 2008 | $ 1,768 |
January 1, 2009 | $ 1,835 |
January 1, 2010 | $ 1,905 |
January 1, 2011 | $ 1,977 |
January 1, 2012 | $ 2,053 |
January 1, 2013 | $ 2,131 |
January 1, 2014 | $ 2,212 |
January 1, 2015 | $ 2,296 |
January 1, 2016 | $ 2,383 |
January 1, 2017 and thereafter | $ 2,473 |
(Ord. 1626 – Oct. 08 Supp.)
9. Eastside Sanitary Sewer Connection District 1.
A. Eastside Sanitary Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
EX BEG SW COR THN N 767.2F E 70F S 195F W10F S578.44F W60.32F TO POB- N 435.6F S 770F W 200F SW FRL 1/4 SEC 7-80-23 GEOPARCEL # 8023-07-300-003
and: -EX BEG SW COR THN N 767.2F E 70F S 195F W10F S578.44F W60.32F TO POB- W 200F S 334.4F SW FRL 1/4 LESS RD SEC 7-80-23 GEOPARCEL # 8023-07-300-004
and: E 160F W 360F S 770F LESS 1.60 A RD SEC 7-80-23 GEOPARCEL # 8023-07-300-005
and: BEG 360F E SW COR THN N 285F E 150F S 185F W 20F S 100F W 130F TO BEG SW FRL 1/4 SW FRL 1/4 LESS RD SEC 7-80-23 GEOPARCEL # 8023-07-300-006
and: OUTLOT D GREENWOOD ACRES PLAT 2; AND PARCEL B BEG 575F W OF S1/4 COR THN W685.3F NELY 435F SE 446.4F SE 378F TO POB S 1/2 SW FRL 1/4 LESS .19A RD SEC 7-80-23 GEOPARCEL # 8023-07-300-008
and: -EX PARCEL B BEG 575F W OF S 1/4 COR THN W685.3F NELY 435F SE 446.4F SE 378F TO POB- E 44.34A LYG E OF I 35 S 1/2 SW FRL 1/4 LESS .51A RD SEC 7-80-23 GEOPARCEL # 8023-07-300-009
and: -EX NURSERY DRIVE ESTS PLTS 1 & 2- W 45A S 1/2 SE 1/4 LESS RD SEC 7-80-23 GEOPARCEL # 8023-07-451-001
and: PARCEL F BOOK 11144 PAGE 966 NW FRL 1/4 SEC 18-80-23; AND LOT 1 GREENWOOD ACRES PLAT 2 GEOPARCEL # 8023-18-128-004
and: N 75A MEAS ON LN PAR TO N LN NE 1/4 LESS RD SEC 18-80-23 GEOPARCEL # 8023-18-200-007
and: E 1/2 NW 1/4 LYG E OF NE FRISK DR & -EX N 75A PAR TO N LN & DEER CREEK ESTATES PLAT 1- N 1950.35F NE 1/4 SEC 18-80-23 GEOPARCEL # 8023-18-200-009
and: PARCEL C BEG CNT OF SEC THN N 695.45F E 329.3F S 694.65F TO S LN W 329.5F TO POB W1/2 W1/2 SW1/4 NE1/4 LESS .667A RD SEC 18-80-23 GEOPARCEL # 8023-18-200-005
and: -EX N 1950.35 & PARCEL C BOOK 10528 PAGE 961 BEG CNT OF SEC THN N 695.45F E 329.3F S694.65F TO S LN W 329.5F TO POB- LYG N & W OF DEER CREEK ESTATES PLT 1 NE 1/4 SEC18-80-23 GEOPARCEL # 8023-18-200-010
and: -EX N 1950.35- LYG E OF DEER CREEK ESTATES PLAT 1 NE 1/4 SEC 18-80-23 GEOPARCEL # 8023-18-200-011
and: -EX DEER CREEK ESTATES PLAT 1- BEG 2199F N OF S 1/4 COR THN E 300F SE 190.5F NELY 889.3F ELY 1471.3F TO E LN N 269.35F W2636F S 437.75F TO POB SE 1/4 SEC 18-80-23 GEOPARCEL # 8023-18-426-012
and: DEER CREEK ESTATES PLAT 1, AN OFFICIAL PLAT
and: LOTS 16 AND 17 IN GREENWOOD ACRES PLAT 3, AN OFFICIAL PLAT
and: LOTS 9, 10 AND 11 IN HERITAGE WOODS, AN OFFICIAL PLAT
and: IRREG 6.5A PC NE COR N OF CNTY RD H & E OF INTRSTATE-35 SW 1/4 SW FRL 1/4 SEC 18-80-23 GEOPARCEL # 8023-18-352-001
and: -EX BEG 1961.8F E & 75F N OF SW COR SEC 18 THN W 289.3F NW162.3F N91.2F SELY 223.5F E270.5F S40F TO POB- W 650F SE 1/4 SW 1/4 LESS .75A RD SEC 18-80-23 GEOPARCEL # 8023-18-376-001
and: BEG 1961.8F E & 75F N OF SW COR THN W 289.3F NW 162.3F N 91.2F SELY 223.5F E 270.5F S 40F TO POB SW FRL 1/4 SEC 18-80-23 GEOPARCEL # 8023-18-376-002
and: -EX W 650F- SE 1/4 SW 1/4 LESS 2.203 A RD SEC 18-80-23 GEOPARCEL # 8023-18-377-001
and: OUTLOT Y GREENWOOD ACRES PLAT NO. 7 GEOPARCEL # 8023-18-452-019
and: S 418.85F W520F OUTLOT X GREENWOOD ACRES PLT NO 6 GEOPARCEL # 8023-18-452-002
B. The owner of any parcel included within the Eastside Sanitary Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre—1 acre minimum) |
Prior to and through December 31, 2009 | $ 2,227 |
January 1, 2010 | $ 2,352 |
January 1, 2011 | $ 2,477 |
January 1, 2012 | $ 2,602 |
January 1, 2013 | $ 2,727 |
January 1, 2014 | $ 2,852 |
January 1, 2015 | $ 2,977 |
January 1, 2016 | $ 3,102 |
January 1, 2017 | $ 3,227 |
January 1, 2018 and thereafter | $ 3,352 |
(Ord. 1634 – Apr. 09 Supp.)
10. Northern Interceptor Trunk Sewer Connection District 1.
A. Northern Interceptor Trunk Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
S 1/2 SW 1/4 & S 3A N 1/2 SW 1/4 N OF UP RR ROW LESS RD SEC 10-80-24 GEOPARCEL # 8024-10-300-004
and: -EX S 50F- S 330F W 660F SE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-400-005
and: -EX S 330F W 660F & BEG 310.92F W OF SE COR OF SEC THN W 1677.62F ALNG S LN N 50F E 1677.62F S50F TO POB- & -EX E156F S 1/2- W 1/2 SE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-400-009
and: -EX S 50F- E 156F SW 1/4 SE 1/4 & -EX BEG SE COR THN W310F N75F E 310.92F S 75.01F TO POB & BEG 310.92F W OF SE COR THN W 1677.62F ALNG S LN N 50F E 1677.62F S 50F TO POB & BEG NE COR THN S 2568.94F TO N ROW LN NW 18TH ST W 60F N 2568.77F E 60.01F TO POB- SE 1/4 SE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-400-011
and: S 1.5A N 1/2 NW 1/4 SW 1/4 & -EX S 1.5A- S 20A NW 1/4 SW 1/4 LESS .76A RD SEC 10-80-24 GEOPARCEL # 8024-10-300-006
and: -EX S 1.5A- N 1/2 NW 1/4 SW 1/4 & -EX S 1.5A- NE 1/4 SW 1/4 LESS .7A RD SEC 10-80-24 GEOPARCEL # 8024-10-300-005
and: -EX W 50F RD EAS & PARCEL A BK 9452 PG 76 BEG 1583.54F S OF NW COR OF SEC THN E 300F S 216F W 300F N 216F TO POB & N 260F W 203.85F- S 1/2 NW 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-100-007
and: N 1/2 NW 1/4 LESS 3.19 A RD SEC 10-80-24 GEOPARCEL # 8024-10-100-001
and: -EX W 471.5F N 287.4F ON E LN & N 294.4F S 894.4F ON W LN- S 1/2 SW 1/4 LESS RD SEC 3-80-24 GEOPARCEL # 8024-03-300-004
and: E 10A N 20A & S 20A NW 1/4 SE 1/4 & SW 1/4 SE 1/4 & W 20A E 1/2 SE 1/4 LESS 1.25A RD SEC 3-80-24 GEOPARCEL # 8024-03-400-007
and: -EX BEG SE COR THN W 100F N 60F E 99.18F S 60.02F TO POB- & -EX W 20A- E 1/2 SE 1/4 LESS .67A RD SEC 3-80-24 GEOPARCEL # 8024-03-400-008
and: -EX N 33F RD EAS & BEG 33F S NE COR THN S 1288.49F TO SE COR THN W 60F N 1251.52F NW 14.05F W 736.06F N 27F E TO POB- NE 1/4 NE 1/4 & E 13 A NW 1/4 NE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-200-004
and: -EX BEG NW COR OF SEC THN E 1317.6F S 60F W 1246.61F SWLY 15.45F S 2571.89F W60F N 2642.89F TO POB W 1/2 NW 1/4 SEC 11-80-24 GEOPARCEL # 8024-11-101-001
and: -EX E 60F RD- SE 1/4 NE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-200-005
and: W 1/2 NE 1/4 -EX E 13 A NW 1/4 NE 1/4- LESS .75 A RD SEC 10-80-24 GEOPARCEL # 8024-10-200-001
and: -EX BEG NE COR THN S 2568.94F TO N ROW LN NW 18TH ST W 60F N 2568.77F E 60.01F TO POB- NE 1/4 SE 1/4 SEC 10-80-24 GEOPARCEL # 8024-10-400-010
B. The owner of any parcel included within the Northern Interceptor Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre—1 acre minimum) |
Prior to and through December 31, 2009 | $ 2,470 |
January 1, 2010 | $ 2,608 |
January 1, 2011 | $ 2,746 |
January 1, 2012 | $ 2,884 |
January 1, 2013 | $ 3,022 |
January 1, 2014 | $ 3,160 |
January 1, 2015 | $ 3,298 |
January 1, 2016 | $ 3,436 |
January 1, 2017 | $ 3,574 |
January 1, 2018 and thereafter | $ 3,712 |
(Ord. 1635 – Apr. 09 Supp.)
11. Fourmile Creek Trunk Sewer Connection District 1.
A. Fourmile Creek Trunk Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
OUTLOT Z ASHLAND RIDGE PLAT 1 (GEOPARCEL # 8024-11-176-002)
and: -EX PRAIRIE RIDGE CHURCH PLAT 1 & BEG NE COR THN S 659.3F W 35F N 206.38F NW 120.1F N 262.93F NW 14.13F W 1267.49F N 60F E 1317.52F TO POB- PARCEL E BK 10143 PG 828 N 1/2 NE 1/4 NW 1/4 SEC 11-80-24 (GEOPARCEL # 8024-11-126-026)
and: PARCEL H BK 11793 PG 908 BEG 60.02F N OF SW COR THN N 400.13F E 582.18F S 400.13F W 582.18F TO POB SW 1/4 SW 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-300-011)
and: PARCEL G BK 11793 PG 908 BEG 460.15F N OF SW COR THN N 860.9F E 742.61F S 1260.69F TO N ROW LN OF NW 36TH ST W 160.28F N 400.13F W 582.18F TO POB SW 1/4 SW 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-300-010)
and: -EX JOHNSON HOMESTEAD PLAT 1- & -EX BEG SW COR THN N 415.03F E 36.62F SE 81.34F S 263.82F SE 14.29F E 629.99F S 60.01F W 680F TO POB- PARCEL C BK 7797 PG 457 S 415F W 680F S ½ SE 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-400-013)
and: -EX AUTUMN CREST PLAT 1- & -EX BEG 415.03F N OF S 1/4 COR THN N 898.94F E 35.01F S 860.34F SE 38.76F W 36.62F TO POB- & -EX BEG SE COR THN W 1954.87F N 60.01F E 1955.41F S60F TO POB- PARCEL A BK 7797 PG 457 BEG SE COR THN W1954.88F N 415F W 680F TO W LN N 898.95F TO NW COR E 1636.72F SELY 794.3F E 345F TO E LN S 970.45F TO POB S 1/2 SE 1/4 LESS RD SEC 2-80-24 (GEOPARCEL # 8024-02-400-010)
and: LOT 1 JOHNSON ESTATES PLAT 1 (GEOPARCEL # 8024-02-476-004)
and: LOT 2 JOHNSON ESTATES PLAT 1 (GEOPARCEL # 8024-02-476-003)
and: LOT 3 JOHNSON ESTATES PLAT 1 (GEOPARCEL # 8024-02-476-002)
and: -EX MEMORIAL SERVICES OF IOWA PLAT 1- PARCEL I BOOK 12412 PAGE 55 N 1/2 SE 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-400-015)
and: PARCEL J PAGE 12412 PAGE 55 N 1/2 SE 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-400-011)
and: -EX COM SW COR SEC 1 THN N 60F E 60F TO POB N 40.84F SELY 39.11F E 127.41F SELY 125.28F E 196.88F S7.5F W 474.02F TO POB- & -EX THE WOODLAND RESERVE PLAT 5- PARCELS Q & R BK 10200 PG 790 BEG 60F E & 60F N OF SW COR THN N 1255.82F E 1041F S 1255.65F W 1041F TO POB SW 1/4 SEC 01-80-24 (GEOPARCEL # 8024-01-351-002)
and: OUTLOT B THE WOODLAND RESERVE PLAT 1 (GEOPARCEL # 8024-01-376-005)
and: OUTLOT C THE WOODLAND RESERVE PLAT 1 (GEOPARCEL # 8024-01-376-004)
and: OUTLOT D THE WOODLAND RESERVE PLAT 1 (GEOPARCEL # 8024-01-376-003)
and: -EX THE WOODLAND RESERVE PLTS 1 & 5- PARCEL J BOOK 7822 PAGE 696 BEG 1315.37F N OF SE COR THN W 2555.02F N 663.42F E 2561.55F TO E LN S 663.41F TO POB SW 1/4 SEC 1-80-24 (GEOPARCEL # 8024-01-302-010)
and: -EX THE WOODLAND RESERVE PLATS 1 & 5 & PARCELS AA & BB BOOK 11867 PAGE 349- PARCEL K BOOK 7822 PAGE 696 BEG 1978.78F N OF SE COR THN W 2561.55F N 661.72F TO N LN E 2568.06F TO NE COR S 661.72F TO POB SW 1/4 SEC 1-80-24 (GEOPARCEL # 8024-01-302-016)
and: OUTLOT X THE WOODLAND RESERVE PLAT 7 (GEOPARCEL # 8024-01-301-005)
and: OUTLOT A NORTH PRAIRIE BEND PLAT 3 (GEOPARCEL # 8024-01-102-022)
and: OUTLOT B NORTH PRAIRIE BEND PLAT 3 (GEOPARCEL # 8024-01-104-008)
and: OUTLOT X ROLLING PRAIRIE ESTATES (GEOPARCEL # 8024-01-101-001)
and: PARCEL C BK 13599 PG 404 BEG 803.77F ELY OF NW COR THN E 733.64F ALNG N LN TO E LN W 6A SE 1/4 SW 1/4 THN S 1253.02F TO N ROW LN NE 118TH AV W 733.64F ALNG ROW LN N 1251.03F TO POB SW 1/4 SW 1/4 & W 6A SE 1/4 SW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-300-005)
and: -EX RD BEG S 1/4 COR THN N 90F W487F N 60F W 600F S 80F W TO W LN S TO S LN E TO POB- S 19A E 68A SW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-300-007)
and: -EX N 16A- & -EX S 19A- E 68A SW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-300-009)
and: N 16A E 68A SW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-300-008)
and: SW 1/4 SE 1/4 LESS 1 A RD SEC 36-81-24 (GEOPARCEL # 8124-36-400-002)
and: SE 1/4 SE 1/4 LESS 2 A RD SEC 36-81-24 (GEOPARCEL # 8124-36-400-003)
and: OUTLOT X OTTER CREEK REDEVELOPMENT PLAT 2 (GEOPARCEL # 8023-06-101-002)
and: OUTLOT Y OTTER CREEK REDEVELOPMENT PLAT 2 (GEOPARCEL # 8023-06-155-001)
and: OUTLOT Z OTTER CREEK REDEVELOPMENT PLAT 2 (GEOPARCEL # 8023-06-156-002)
and: OUTLOT W OTTER CREEK REDEVELOPMENT PLAT 1 (GEOPARCEL # 8023-06-326-001)
B. The owner of any parcel included within the Fourmile Creek Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established, as follows:
Effective Date | Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2011 | $2,400 |
January 1, 2012 | $2,520 |
January 1, 2013 | $2,640 |
January 1, 2014 | $2,760 |
January 1, 2015 | $2,880 |
January 1, 2016 | $3,000 |
January 1, 2017 | $3,120 |
January 1, 2018 | $3,240 |
January 1, 2019 | $3,360 |
January 1, 2020 and thereafter | $3,480 |
(Ord. 1703 - Oct. 11 Supp.)
12. Rock Creek Laterals Sewer Connection District 1.
A. Rock Creek Laterals Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
Lots 1 through 4, Golf View Acres Plat 1; and
Lots 10 through 14, Golf View Acres Plat 3; and
Lot 3, and Lots 7 through 35, all in Golf View Acres Plat 4; and
BEG SW COR THN NW 40F W 27F TO PT ON SW LN SE 66 F TO POB LOT 5 & ALL LOT 6 GOLF VIEW ACRES PLAT 4 (Geoparcel 8024-21-201-006); and
Lots 7 through 24, all in Golf View Acres Plat 5; and
N 1/2 NE 1/4 NE 1/4, LESS .38 A Road, SEC 21-80-24; and
Lots 1 through 6, Country Club Court Plat 1; and
Lots 1 through 20, and Lots 23 through 44, all in Country Club Court Plat 2; and
-EX BEG SW COR THN NELY 20.47F NWLY 34.46F S TO POB - LOT 21 COUNTRY CLUB COURT PLT 2 (Geoparcel 8024-21-426-002); and
Lots 1 through 12, Country Club Court Plat 3; and
Lots 1 through 5, and Outlots A through E, all in Country Club Court Plat 4; and
Lots 1 through 22, Country Club Court Plat 5; and
-EX E470F S698F & E 270F N 720F- E 90A S 120A NE 1/4 LESS .42A RD SEC 21-80-24 (Geoparcel 8024-21-276-001); and
ALL LT 1 & -EX BEG 886.09F N OF SW COR LT 7 THN SELY 501.72F S 105.59F NW 535.83F N 8.03F TO POB- W 467F & E 28F W 495F N 360F LTS 6 & 7 N OF HWY 60 OP W 1/2 SE 1/4 SEC 21-80-24 (Geoparcel 8024-21-401-017); and
E2A N 145F NE 1/4 SE 1/4 LESS RD SEC 21-80-24 (Geoparcel 8024-21-426-014); and
-EX RD- S 178F N 323F E 601F NE 1/4 SE 1/4 SEC 21-80-24 (Geoparcel 8024-21-426-015); and
-EX RD- N 158.5F S 634F N 957F E 601F NE 1/4 SE 1/4 SEC 21-80-24 (Geoparcel 8024-21-426-016); and
Lots 1, 2, 4, 5 and B, all in Nervig Estates; and
LOTS 1 THROUGH 20, AND LOT A, ALL IN ROLLING HILL; and
-EX E 223.1F N 530F- TT PRT LT 27 N & W OF LN BEG SW COR LT 11 THN W 140F SWLY PT 176F SELY SW COR LT 27 ROLLING HILL (Geoparcel 8024-21-451-002); and
E 223.1 F N 530 F LOT 27 ROLLING HILL (Geoparcel 8024-21-451-003); and
-EX E 28F W 495F N 360F- & -EX W 467F- & -EX BEG 878.06F N & 535.83F SE OF SW COR LT 7 THN N37.87F SE 76.8F S37.87F NW 76.8F TO POB- LTS 6 & 7 N OF HWY 60 OP W 1/2 SE 1/4 SEC 21-80-24 (Geoparcel 8024-21-451-005); and
-EX N 140F W 525F- & -EX N 200F E OF W 525F- THT PRT S 3/4 NW 1/4 LYG NWLY & E OF EXISTING RDS SEC 22-80-24 (Geoparcel 8024-22-103-004); and
LOT 1 IRVINEDALE WATER TOWER PLAT 1; and
IREG PC BEG AT PT 33F N & 277F W OF SE COR THN N 778F E TO HWY 415 S 365.2F W 117F S 413F W 60F TO BEG N 1/2 NE 1/4 SEC 28-80-24 (Geoparcel 8024-28-226-001); and
COM 277F W & 811F N OF SE COR THN E TO HWY 415 S 365.2F TO BEG THN W 117F S 413F E TO HWY 415 NLY TO POB N 1/2 NE 1/4 SUBJ TO MAINTENANCE EAS SEC 28-80-24 (Geoparcel 8024-28-226-002); and
E 110F LOT 2 AND ALL OF LOTS 4 THROUGH 6, BRAGDON; and
LOTS 1 THROUGH 3, FELDMAN MANOR
B. The owner of any parcel included within the Rock Creek Laterals Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established at $7,000 per connection.
(Ord. 1712 - Jan. 12 Supp.)
(Chapter 93 Renumbered as Chapter 94 – Ord. 1719 – Apr. 12 Supp.)
13. SE Delaware Lateral Sewer Connection District 1.
A. SE Delaware Lateral Sewer Connection District 1 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
BEG 304.98F N & 50F E OF SW COR THN E 414.01F N 281.8F E 232.16F SW 208.06F S 286.9F SW 567.25F N 226.42F TO POB SW 1/4 NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-100-024)
AND: -EX W OF LN BEG 454.78F N & 112.46F ELY OF SW COR THN S 149.8F TO S LN- N 132F E 133.4F W 463.4F & S 150F N 282F W 463.4F S 19.98A W 31A S 62.99A NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-100-017)
AND: COM SW COR THN N 454.78F E 50F TO E ROW LN SE DELAWARE AV & POB THN E 62.46F S 149.8F W 62.46F TO E ROW LN N 149.8F TO POB RD EAS SW 1/4 NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-610-007)
AND: N 8 RDS W 20 RDS OF S 19.98 A W 31 A S 62.99 A LESS RD -EX S 1 A RD- NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-100-005)
AND: -EX COM W 1/4 COR OF SEC THN E 1246.93F ALNG S LN TO CONSTRUCTION CNT LN I-35 NE 596.6F NW 137F TO WLY ROW LN I-35 TO POB THN W 500.78F NELY 776.84F E 182.38F TO WLY ROW LN I-35 SW 666.44F TO POB- S 1/2 OF FOLLOWING PARCEL W 32.94A S 62.94A N 125.88A & N 11.02A W 31A S 62.99A NW FRL 1/4 LESS RD SEC 6-79-23 (GEOPARCEL # 7923-06-100-015)
AND: -EX COM NW COR OF SEC THN S 1611.35F ALNG W LN E 1109.48F TO POB THN NE 440.32F NE 249.82F E 42.03F TO PRESENT WLY ROW LN I-35 S 403.31F ALNG WLY ROW LN SWLY 258.55F W 182.38F TO POB- & -EX W 50F- N 1/2 W 32.94A S 62.94A N 125.88A & N 11.02A W 31A S 62.99A NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-100-016)
AND: -EX W 50F- S 310F N 951.7F W 370F NW 1/4 NW FRL 1/4 SEC 6-79-23 (GEOPARCEL # 7923-06-100-002)
AND: LOT 1 OF CHAPMAN BROTHERS FARM PLAT 1 (GEOPARCEL #7924-01-226-001)
AND: NE FRL 1/4 LESS RR & RD SEC 1-79-24 (GEOPARCEL #7924-01-200-06) - EX THAT PART LYING SOUTH AND WEST OF THE CREEK BISECTING THE NE FRL 1/4 - AND -EX FRIENDLY HILLS -
B. The owner of any parcel included within the SE Delaware Avenue Lateral Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Lateral sewer connection fees are hereby established as follows:
Effective Date | Connection Fee (per acre—1 acre minimum) |
Prior to and through December 31, 2012 | $ 1,392 |
January 1, 2013 | $ 1,434 |
January 1, 2014 | $ 1,476 |
January 1, 2015 | $ 1,519 |
January 1, 2016 | $ 1,561 |
January 1, 2017 | $ 1,603 |
January 1, 2018 | $ 1,645 |
January 1, 2019 | $ 1,687 |
January 1, 2020 | $ 1,730 |
January 1, 2021 and thereafter | $ 1,772 |
C Lateral sewer connection fees as established herein are in addition to sanitary sewer connection fees established by and payable to Polk County.
(Ord. 1734 – Oct. 12 Supp.)
14. Rock Creek Trunk Sewer Connection District 2.
A. Rock Creek Trunk Sewer Connection District 2 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
LOTS 1 THROUGH 5 AND LOT A, MCNAMEE PLACE; AND
-EX PARCEL L BK 14406 PG 79 BEG SW CORNER N 1/2 NE 1/4 THN N 1318.17F E 463.42F S 668.85F SE 262.03F SE 106F SW 375.66F S 33F W 572.84F TO POB- & -EX BEG 277 W OF SE COR THN W ALNG S LN 537.12F N 811F E 537.12F S 811F TO POB- & -EX BEG 33F N & 277F W OF SE COR THN N 778F E TO HWY 415 SLY ALNG W LN HWY 415 TO N LN NW 84TH ST W TO POB & PARCEL C BK 7415 PG 291 BEG 620F E OF SW COR THN N 33F E 30F S 33F W 80F TO POB- N 1/2 NE 1/4 LESS 4.643A RD SEC 28-80-24 (Geoparcel 8024-28-201-006); and
-EX S 33F RD EAS- BEG 277 W OF SE COR THN W ALNG S LN 537.12F N 811F E 537.12F S 811F TO POB N 1/2 NE 1/4 SEC 28-80-24 (Geoparcel 8024-28-226-003); and
LOTS 1, 2 AND E, J C RITTGERS WOODED ACRES (Geoparcel 8024-21-178-003); and
- EX CAMDEN WOODS SOUTH PLAT 1- LOTS 3 & 4, J C RITTGERS WOODED ACRES; and
LT 2 & S 1/2 LT 3 GOLF VIEW ACRES PLT 2 (Geoparcel 8024-16-477-006); and
-EX S 1/2 & N 75F E 250F- LT 3 & -EX S 93F E 250F- LT 4 GOLF VIEW ACRES PLT 2 (Geoparcel 8024-16-477-023); and
Lots 5 through 8, GOLF VIEW ACRES PLT 2
B. The owner of any parcel included within the Rock Creek Trunk Sewer Connection District 2 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2013 | $ 1,768 |
January 1, 2014 | $ 1,821 |
January 1, 2015 | $ 1,874 |
January 1, 2016 | $ 1,927 |
January 1, 2017 | $ 1,980 |
January 1, 2018 | $ 2,033 |
January 1, 2019 | $ 2,086 |
January 1, 2020 | $ 2,139 |
January 1, 2021 | $ 2,192 |
January 1, 2022 and thereafter | $ 2,245 |
(Ord. 1749 - Apr. 13 Supp.)
15. Rock Creek Trunk Sewer Connection District 3.
A. Rock Creek Trunk Sewer Connection District 3 means and includes only the following described real estate:
(Ord. 1798 – Apr. 14 Supp.)
W 1/2 SW 1/4 -EX N 719 FT- LESS 2.5 A RD SEC 4-80-24 (Geoparcel 8024-04-300-002); and
S 1/2 SW 1/4 LESS 4 A RD SEC 5-80-24 (Geoparcel 8024-05-300-003); and
ALL SE 1/4 LYING W OF CNW RY R O W LESS 4 A RD SEC 5-80-24 (Geoparcel 8024-05-400-001); and
ALL SE 1/4 -EX N 719 F- LYING E OF CNW RY ROW SEC 5-80-24 (Geoparcel 8024-05-400-003); and
N 1/2 NW 1/4 LESS 3 A RD SEC 8-80-24 (Geoparcel 8024-08-100-001); and
W 1/2 NE 1/4 LESS 1 A RD SEC 8-80-24 (Geoparcel 8024-08-200-001); and
NW 1/4 NE 1/4 NE 1/4 LESS .50A RD SEC 8-80-24 (Geoparcel 8024-08-200-002); and
N 1/2 E 1/2 NE 1/4 NE1/4 LESS .5A RD & UP RR ROW SEC 8-80-24 (Geoparcel 8024-08-200-003); and
SW 1/4 NE 1/4 NE 1/4 & NW 1/4 SE 1/4 NE 1/4 SEC 8-80-24 (Geoparcel 8024-08-200-004); and
SE 1/4 NE 1/4 NE 1/4 & NE 1/4 SE 1/4 NE 1/4 SEC 8-80-24 (Geoparcel 8024-08-200-005); and
- EX RY ROW & EX RD- NW 1/4 SEC 9-80-24 (Geoparcels 8024-09-100-003, 8024-09-100-001, 8024-09-100-002, 8024-09-100-005 and 8024-09-100-004); and
SW 1/4 NE 1/4 SEC 9-80-24 (Geoparcel 8024-09-200-002); and
NW 1/4 SW 1/4 LESS RD SEC 9-80-24 (Geoparcels 8024-09-300-001 and 8024-09-300-002); and
N 1/2 NE 1/4 SW 1/4 S OF UP RR LESS .5A RD EAS SEC 9-80-24 (Geoparcel 8024-09-300-005); and
S 1/2 NE 1/4 SW 1/4 LESS .31A RD SEC 9-80-24 (Geoparcels 8024-09-300-006, 8024-09-300-007 and 8024-09-300-008); and
N 1/2 NE 1/4 SW 1/4 N OF UP RR SEC 9-80-24 (Geoparcel 8024-09-300-004); and
SE 1/4 SW 1/4 LESS RD SEC 9-80-24 (Geoparcels 8024-09-300-014 and 8024-09-300-012); and
-EX S 353F N 936.2F E 288F- SE 1/4 N OF UP RR ROW LESS RD SEC 9-80-24 (Geoparcel 8024-09-400-001); and
-EX S 60F W 356.48F- & -EX PARCEL A BK 11144 PG 750 CORR AFF BK 11555 PG 364 BEG SE COR THN W 1976.35F N 50F NELY 39.27F N 25F NWLY 176.54F W 138.07F N 156.65F NE 185.85F NE 225.54F N 1069.69F TO S ROW LN ABND UP RR SE 1965.1F TO E LN OF SEC S 1178.94F TO POB- SE 1/4 LYG S OF ABND UP RR ROW LESS RD SEC 9-80-24 (Geoparcel 8024-09-400-006); and
-EX BEG NE CORNER W 1/2 NW 1/4 SEC 16 THN S 1570.96F W 40.01F N 1496.1F NWLY 39.53F W 1249.4F N 50F E 1314.69F TO POB ROAD & ROAD EASM- & -EX PAR R & S BK 13674 PG 488- W 1/2 NW 1/4 SEC 16-80-24 (Geoparcel 8024-16-100-011); and
-EX N 50F W 1000F & N 70F E 312.52F- NE 1/4 NW 1/4 LESS RD SEC 16-80-24 (Geoparcel 8024-16-100-003); and
-EX N 70F & HIDDEN CREEK PLT 3- & -EX PARCEL T BK 14263 PG 490 BEG NE COR LT 2 HIDDEN CREEK PLT 3 THN NE 67.4F NW 196.17F NW 215F N182.88F TO S LN NW 18TH ST E 187.4F S 657.08F TO N LN LT 3 HIDDEN CREEK PLT 3 W 94.16F TO NW COR LT 3 NE 7.74F TO POB- NW 1/4 NE 1/4 SEC 16-80-24 (Geoparcel 8024-16-201-003)
B. The owner of any parcel included within the Rock Creek Trunk Sewer Connection District 3 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2013 | $ 3,150 |
January 1, 2014 | $ 3,245 |
January 1, 2015 | $ 3,340 |
January 1, 2016 | $ 3,435 |
January 1, 2017 | $ 3,530 |
January 1, 2018 | $ 3,625 |
January 1, 2019 | $ 3,720 |
January 1, 2020 | $ 3,815 |
January 1, 2021 | $ 3,910 |
January 1, 2022 and thereafter | $ 4,005 |
(Ord. 1752 - Apr. 13 Supp.)
16. Crosswinds Business Park Lateral Sewer Connection District 1.
A. Rock Creek Trunk Crosswinds Business Park Lateral Sewer Connection District 1 means and includes only the portions of the following described real estate shown on the Crosswinds Business Park Neighborhood Plan #1 dated January 13, 2012:
(Ord. 1798 – Apr. 14 Supp.)
N 1/2 NE 1/4 LYING W OF SE CROSSWINDS DR LESS RD SEC 7-79-23 (Geoparcel 7923-07-200-006); and
-EX E 478.5F- N 1/2 NE 1/4 LYING E OF SE CROSSWINDS DR LESS RD SUBJ TO DRAIN EAS SEC 7-79-23 (Geoparcel 7923-07-200-007); and
S & W OF LN COM E 1/4 COR SEC 7 THN S 171.2F S 247.89F TO BEG THN W 60F TO EXISTING W RD ROW LN N 25.89F NW 70.6F WLY 7.42F ALNG CRV W 571.89F NW 285.63F W 427.09F WLY 121.83F ALNG CRV SW 61.24F SLY 19.46F ALNG CRV SE 10F SW 81.04F NLY 32.77F ALNG CRV NW 64.1F WLY 19.04F ALNG CRV WLY 9.81F ALNG CRV NW 80.5F ELY 31.24F ALNG CRV NE 64.35F NLY 17.66F ALNG CRV NW 1298.41F NLY 263.87F ALNG CRV TO N LN SW 1/4 NE 1/4 BNG NE 1/4 LESS RD SEC 7-79-23 (Geoparcel 7923-07-400-004); and
N & E OF A LN COM E 1/4 COR SEC 7 THN S 171.2F TO BEG THN W 60F TO EXISTING W RD ROW LN SW 65.78F SWLY 91.26F ALNG CRV WLY 1216.29F SWLY 103.8F ALNG CRV SWLY 7.44F ALNG CRV NW 67.92F NWLY 92.33F ALNG CRV NW 1220.48F NELY 250.75F ALNG CRV TO N LN SW 1/4 NE 1/4 BNG NE 1/4 LESS RD SEC 7-79-23 (Geoparcel 7923-07-200-008); and
B. The owner of any parcel included within the Crosswinds Business Park Lateral Sewer Connection District 1 shall pay a sewer connection fee in the amount of $1,751 per acre to the City at the time of site plan approval. Such fee is in addition to the fees set forth in Section 94.06, subsection 8.
(Ord. 1755 - Apr. 13 Supp.)
17. Deer Creek Trunk Sewer Connection District 1.
A. Deer Creek Trunk Sewer Connection District 1 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
NW 1/4 LESS 2 A RD SEC 17-80-23 (Geoparcel # 8023-17-100-001); and
N 30 A SW 1/4 SEC 17-80-23 (Geoparcel # 8023-17-300-001); and
W 700F N 175F S 2146.9F SW 1/4 SEC 17-80-23 (Geoparcel # 8023-17-300-004); and
-EX W 700F N 175F- BEG SW COR THN N 2146.9F E 1522F S 443F W 1015.6F S 411.6F W 208.7F S1302.1F W320.4F TO POB SW 1/4 LESS RD SEC 17-80-23 (Geoparcel # 8023-17-300-005); and
-EX BEG SW COR THN N 2146.9F E 1522F S 443F W1015.6F S411.6F W208.7F S1302.1F W320.4F TO POB- S 130A SW 1/4 LESS RD SEC 17-80-23 (Geoparcel # 8023-17-300-003)
B. The owner of any parcel included within the Deer Creek Trunk Sewer Connection District 1 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre-1 acre minimum) |
Effective Date | Sewer Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2014 | $3,055 |
January 1, 2015 | $3,226 |
January 1, 2016 | $3,397 |
January 1, 2017 | $3,568 |
January 1, 2018 | $3,739 |
January 1, 2019 | $3,910 |
January 1, 2020 | $4,081 |
January 1, 2021 | $4,252 |
January 1, 2022 | $4,423 |
January 1, 2023 and thereafter | $4,594 |
(Ord. 1814 – July 14 Supp.)
18. Northern Interceptor Trunk Sewer Connection District 2.
A. Northern Interceptor Trunk Sewer Connection District 2 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Public Works:
W ½ NE FRL ¼ LESS 1.52 A RD SEC 3-80-24 (Geoparcel # 8024-03-200-001); and
-EX E 10A N 20A & S 20A- NW ¼ SE ¼ SEC 3-80-24 (Geoparcel # 8024-03-400-006); and
NW FRL ¼ LESS 6.43 A RD SEC 3-80-24 (Geoparcel # 8024-03-100-001); and
-EX W 172F S 400F- N ½ SW ¼ LESS 1.06A RD SEC 3-80-24 (Geoparcel # 8024-03-300-005); and
W 172F S 400F N ½ SW ¼ LESS .46A RD SEC 3-80-24 (Geoparcel # 8024-03-300-006)
B. The owner of any parcel included within the Northern Interceptor Trunk Sewer Connection District 2 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2016 | $3,228 |
January 1, 2017 | $3,339 |
January 1, 2018 | $3,450 |
January 1, 2019 | $3,561 |
January 1, 2020 | $3,672 |
January 1, 2021 | $3,783 |
January 1, 2022 | $3,894 |
January 1, 2023 | $4,005 |
January 1, 2024 | $4,116 |
January 1, 2025 and thereafter | $4,227 |
(Ord. 1879 - Jul. 16 Supp.)
19. Deer Creek Trunk Sewer Connection District 2.
A. Deer Creek Trunk Sewer Connection District 2 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Municipal Utilities:
EX BEG 624F W OF SE COR THN N 800.1F W372F S800F E 366F TO POB- E 60A SW 1/4 SEC 15-80-23 (GEOPARCEL # 8023-15-300-005); and
BEG 624F W OF SE COR THN N 800.1F W 84F S 366.3F W 82.5F S 433.8F E 173F TO POB LESS RD SW 1/4 SEC 15-80-23 (GEOPARCEL # 8023-15-300-004); and
EX E OF LN BEG 797F W OF SE COR THN N 433.8F E 82.5F N366.3F TO N LN- S 800F E 60A SW 1/4 LESS RD SEC 15-80-23 (GEOPARCEL # 8023-15-300-003); and
EX S 297.34F E 293F W 1241F- W 100A SW 1/4 LESS RD SEC 15-80-23 (GEOPARCEL # 8023-15-300-001); and
S 297.34F E 293F W 1241F W 100A SW 1/4 LESS RD SEC 15-80-23 (GEOPARCEL # 8023-15-300-002); and
LYG E OF LN BEG 1311.6F E SW COR THN N 380F W 440F N 1496.65F NELY ALNG E ROW CRI & P RR TO N LN SE 1/4 LESS RD SEC 16-80-23 (GEOPARCEL # 8023-16-426-001); and
BEG 605.08F E OF SW COR THN E 706.52F N 380F W 440F N 1496.65F SWLY ALNG RR ROW 571.04F E 74.73F S 353.3F SW 991.3F TO POB SE 1/4 LESS RD SEC 16-80-23 (GEOPARCEL # 8023-16-453-002); and
BEG 451F E & 50F NE OF SW COR THN E 155F NE 950F N 350F W 75F SW 1300F TO POB SW1/4 SE1/4 SEC 16-80-23 (GEOPARCEL # 8023-16-453-001); and
BEG 376F E & 50F NE OF SW COR THN NE 1300F W 75F SW 1300F E 50F TO POB SW 1/4 SE 1/4 SEC 16-80-23 (GEOPARCEL # 8023-16-452-003); and
COM 306.84F E & 40F N OF S 1/4 COR THN N 680F E 153.40F SW 697.28F TO POB SE 1/4 SEC 16-80-23 IN ENTERPRISE (GEOPARCEL # 8023-16-452-002); and
EX S 150F VAC ELM ST & VAC COSKERY AV E OF NE 42ND CT- ALL VAC STS & ALLEYS & -EX LTS 4,5 & 6 BLK 10 & LTS 13 THRU 18 BLK 11 & LTS 13 THRU 18 BLK 12- ALL LTS & VAC LTS IN BLKS 1 THRU 12 ENTERPRISE (GEOPARCEL # 8023-16-376-006); and
LT 17 & 18 BLK 12 ENTERPRISE (GEOPARCEL # 8023-16-451-003); and
LTS 15 & 16 BLK 12 ENTERPRISE (GEOPARCEL # 8023-16-451-002); and
LTS 13 & 14 BLK 12 ENTERPRISE (GEOPARCEL # 8023-16-451-001); and
VAC LTS 17 & 18 BLK 11 ENTERPRISE (GEOPARCEL # 8023-16-376-005); and
VAC LTS 15 & 16 BLK 11 ENTERPRISE (GEOPARCEL # 8023-16-376-004); and
VAC LT 13 & LT 14 BLK 11 ENTERPRISE (GEOPARCEL # 8023-16-376-003); and
VAC ELM ST E & ADJ & VAC LTS 4,5 & 6 BLK 10 ENTERPRISE (GEOPARCEL # 8023-16-376-002); and
S 1/2 SE 1/4 NE 1/4 SW 1/4 & S 1/4 NW 1/4 SE 1/4 W OF RY SEC 16-80-23 (GEOPARCEL # 8023-16-326-002); and
EX S 1/4- NW 1/4 SE 1/4 LYG W OF CRI & P RR SEC 16-80-23 (GEOPARCEL # 8023-16-401-001); and
SW 1/4 -EX S 25 A E 1/4- LESS 3.82 A ROAD SEC 16-80-23 (GEOPARCEL # 8023-16-301-001); and
NW 1/4 LESS 4 A RD SEC 15-80-23 (GEOPARCEL # 8023-15-100-001); and
NE 1/4 LYG E OF RR ROW LESS RD SEC 16-80-23 (GEOPARCEL # 8023-16-200-002); and
NE 1/4 LYG W OF RR ROW LESS RD SEC 16-80-23 (GEOPARCEL # 8023-16-200-001); and
EX BEG NW COR E1924.58F S 1800.34F NW 1946.3F N 1710.03F TO POB- NW 1/4 LESS 1.3A RD SEC 16-80-23 (GEOPARCEL # 8023-16-100-003); and
BEG NW COR THN E1924.58F S 1800.34F W 1371.03F N 1049.05F W 562.72F N 707.39F TO POB NW 1/4 LESS 1.97A RD EAS SEC 16-80-23 (GEOPARCEL # 8023-16-100-002); and
BEG 707.39F S OF NW COR THN E 562.72F S 1049.05F W575.27F N1002.64F TOPOB NW 1/4 LESS .76A RD EAS SEC 16-80-23 (GEOPARCEL # 8023-16-100-001); and
EX N 55F W 678.26F- NE 1/4 LESS 3.486A RD SEC 17-80-23 (GEOPARCEL # 8023-17-200-003); and
E 20A S1/2 SW1/4 LESS RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-008); and
W 20A E 40A S 1/2 SW 1/4 LESS RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-007); and
W 10A E 50A S 1/2 SW 1/4 LESS RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-006); and
E 10A W 30A S 1/2 SW 1/4 LESS .293A RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-005); and
W 10A E 20A W 30A S 1/2 SW 1/4 LESS .275A RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-004); and
W 10A W 30A S 1/2 SW 1/4 LESS 1.232A RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-003); and
BEG SW COR THN N 30RDS E27RDS SELY 43RDS W56RDS TO POB N 1/2 SW 1/4 LESS .375A RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-002); and
EX BEG SW COR THN N 30 RDS E 27RDS SELY 43RDS W 56RDS TO POB- N 1/2 SW 1/4 LESS .64A RD SEC 10-80-23 (GEOPARCEL # 8023-10-300-001); and
E 10A SE 1/4 SE 1/4 LESS .88A RD SEC 9-80-23 (GEOPARCEL # 8023-09-400-007); and
W 10A E1/2 SE1/4 SE 1/4 LESS RY & .8A RD SEC 9-80-23 (GEOPARCEL # 8023-09-400-006); and
W 1/2 SE 1/4 SE 1/4 LESS 1.5A RY & .5A RD SEC 9-80-23 (GEOPARCEL # 8023-09-400-005); and
N 1/2 SE 1/4 LYG E OF RR SEC 9-80-23 (GEOPARCEL # 8023-09-400-003); and
SW1/4 SE 1/4 LESS 1 A RD & 1.5A RY SEC 9-80-23 (GEOPARCEL # 8023-09-400-004); and
E 1/2 NW 1/4 SE 1/4 LYG W OF RR SEC 9-80-23 (GEOPARCEL # 8023-09-400-002); and
E 19A W 20A NW 1/4 SE1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-400-001); and
S 10A E 20A S 1/2 SW 1/4 LESS RD SEC 9-80-23 (GEOPARCEL # 8023-09-300-007); and
N 10A E 20A S 1/2 SW 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-300-006); and
PARCEL B BEG 1841F E & 33F N OF SW COR OF SEC THN N 150F W 74F N 103F E 74F N 182F E 140F S 435F TO N ROW LN NE 102ND AV W140F TO POB S 1/2 SW 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-300-009); and
N 150F S 183F E 74F W 1841F S 1/2 SW 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-300-005); and
EX BEG 1841F E & 33F N OF SW COR OF SEC THN W 74F NLY 253F E 74F N 182F E 140F S 435F W 140F TO POB- & -EX S 2A W 10A- W 60A S 1/2 SW 1/4 LESS 2.3A RD SEC 9-80-23 (GEOPARCEL # 8023-09-300-008); and
S 2 A W 10 A S 1/2 SW 1/4 LESS .20 A RD SEC 9-80-23 (GEOPARCEL # 8023-09-300-004); and
W 1A NW 1/4 SE 1/4 & -EX N 457F W 324F & N 96F E 25F W 349F- N 1/2 SW 1/4 LESS RD SEC 9-80-23 (GEOPARCEL # 8023-09-300-002); and
S 361F N 457F W 324F N 1/2 SW 1/4 LESS RD SEC 9-80-23 (GEOPARCEL # 8023-09-300-001); and
N96F W 349F N 1/2 SW 1/4 & S 116F W 349F S 1/2 NW 1/4 LESS RD SEC 9-80-23 (GEOPARCEL # 8023-09-100-003); and
BEG SE COR THN W 1353.9F N 612.8F W 1293.1F N 2031.1F E 2636.5F & S 2642.8F TO POB SE 1/4 LESS RD SEC 8-80-23 (GEOPARCEL # 8023-08-400-001); and
PARCEL B BK 14135 PG 97 BEG 971.49F E OF SW COR THN N 612.55F E 315.05F S 612.8F W 315.05F TO POB SE 1/4 LESS .24A RD SEC 8-80-23 (GEOPARCEL # 8023-08-400-006); and
EX E 315F- BEG SW COR THN N 611.8F E 1293.1F S 612.8F W 1286F TO POB SE 1/4 LESS RD EAS SEC 8-80-23 (GEOPARCEL # 8023-08-400-005); and
EX S 100F E 678.74F- & -EX W 3/4 W 1/2- & -EX PARCEL A BK 12670 PG 232- SW 1/4 LESS RD SEC 08-80-23 (GEOPARCEL # 8023-08-300-004); and
PARCEL A BK 12670 PG 232 BEG 1647F E OF SW COR SEC THN N 1118F E 578F S1018F W 257F S 100F W321F TO POB SEC 08-80-23 (GEOPARCEL # 8023-08-300-005); and
W 3/4 W 1/2 SW 1/4 LESS RD SEC 08-80-23 (GEOPARCEL # 8023-08-300-003); and
EX COM CNT SEC 7 THN W 71.28F NW 233.94F TO BEG THN NW 13.9F NE 679.99F SE 52.38F SW 62.92F SW 627.6F TO POB- SE 1/4 NW 1/4 E OF I-35 & NE 1/4 SW 1/4 E OF I-35 & N 1/2 SE 1/4 & E 35A SE 1/4 SE 1/4 LESS .875 A RD SEC 7-80-23 (GEOPARCEL # 8023-07-401-002); and
LOT 1 NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-009); and
PARCEL A BK 10265 PG 844 BEG NE COR LT 1 THN W 267F TO NW COR LT 1 S 130.02F SELY 39.25F TO N ROW LN NE 102ND AV W 100F NELY 39.29F TO E LN LT 2 N 241.98F TO NE COR LT 2 W 163F N 310F E 10F N 644.16F SE 344.26F NELY 40.52F NW 359.41F TO N LN E 448.94F TO NE COR S 1105.92F TO POB OL Y NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-011); and
LOT 2 NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-008); and
EX PARCEL A BK 10265 PG 844 BEG NE COR LT 1 THN W 267F TO NW COR LT 1 S 130.02F SELY 39.25F TO N ROW LN NE 102ND AV W 100F NELY 39.29F TO E LN LT 2 N 241.98F TO NE COR LT 2 W 163F N 310F E 10F N 644.16F SE 344.26F NELY 40.52F NW 359.41F TO N LN E 448.94F TO NE COR S 1105.92F TO POB- OL Y NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-010); and
LOT 3 NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-007); and
LOT 4 NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-006); and
LOT 5 NURSERY DRIVE ESTATES PLAT NO 1 (GEOPARCEL # 8023-07-451-005); and
LOT 2 NURSERY DRIVE ESTATES PLAT NO. 2 (GEOPARCEL # 8023-07-451-004); and
LOT 1 NURSERY DRIVE ESTATES PLAT NO. 2 (GEOPARCEL # 8023-07-451-003); and
PARCEL G BOOK 14770 PAGE 301 VAC I-35 ROW THRU SE 1/4 NW FRL 1/4 & NE 1/4 SW FRL 1/4 SEC 7-80-23 (GEOPARCEL # 8023-07-326-001); and
IRREG PC BEG AT PT 100F E SW COR THN N 600F E 250F SE TO PT 200F N & 1064F E SW COR S 200F W 964F TO BEG SE 1/4 NW 1/4 SEC 10-80-23 (GEOPARCEL # 8023-10-176-002); and
NE 1/4 NW 1/4 LESS RD EAS SEC 10-80-23 (GEOPARCEL # 8023-10-126-004); and
EX ALBAUGH ACRES- W 1/2 NW 1/4 LESS RD SEC 10-80-23; AND LOTS 3 & 4 ALBAUGH ACRES (GEOPARCEL # 8023-10-101-003); and
LT 1 ALBAUGH ACRES (GEOPARCEL # 8023-10-151-004); and
LT 2 ALBAUGH ACRES (GEOPARCEL # 8023-10-151-003); and
EX N 671F W 325F- S 33.70A LESS 1 A RD NE 1/4 E OF RY SEC 9-80-23 (GEOPARCEL # 8023-09-200-006); and
EX PARCEL A BEG 335.91F S OF INTSEC CL 108TH AV & E LN RY THN S125F E75F N 125F W 75F TO POB- N 671F W 325F LYG S OF NE 108TH AV & E OF RY NE 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-200-007); and
PARCEL A BEG 335.91F S OF INTSEC CL 108TH AV & E LN RY THN S 125F E 75F N 125F W 75F TO POB NE 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-200-008); and
N 40.85 A NE 1/4 E OF RY LESS 2 A RD SEC 9-80-23 (GEOPARCEL # 8023-09-200-002); and
EX N 1.62 CHS & W 1/2 SW 1/4- S 1/2 NE 1/4 LYG W OF RR SEC 9-80-23 (GEOPARCEL # 8023-09-200-004); and
N 1.62 CHS S 1/2 NE 1/4 & N 1/2 NE 1/4 LYG W OF RR LESS RD SEC 9-80-23 (GEOPARCEL # 8023-09-200-001); and
EX N 1.62 CHS- W 1/2 SW 1/4 NE 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-200-003); and
EX N 1.62 CHS & S 116F W 349F- S 1/2 NW 1/4 LESS RD SEC 09-80-23 (GEOPARCEL # 8023-09-100-002); and
N 1/2 NW 1/4 LESS 1 A RD & N 1.62 CHS S 1/2 NW 1/4 SEC 9-80-23 (GEOPARCEL # 8023-09-100-001); and
EX BEG 1109F W OF NECOR THN W 880F S 533F E880F N 533F TO POB- NE 1/4 LESS 3.33A RD EAS SEC 8-80-23 (GEOPARCEL # 8023-08-200-002); and
EX N 33F RD EAS- BEG 1109F W OF NE COR THN W 880F S533F E880F N533F TO POB NE 1/4 SEC 8-80-23 (GEOPARCEL # 8023-08-200-001); and
PARCEL C BK 9310 PG 735 BEG SE COR THN W 420F N 420F E 420F S 420F TO POB NE 1/4 LESS .241A RD SEC 7-80-23 (GEOPARCEL # 8023-07-200-011); and
SE 1/4 SE 1/4 & S 1/2 NE 1/4 SE 1/4 LESS 2.58 A RD SEC 3-80-23 (GEOPARCEL # 8023-03-400-003); and
N 40 A SE 1/4 LESS 1.16 A RD SEC 3-80-23 (GEOPARCEL # 8023-03-400-001); and
SW 1/4 SE 1/4 & S 1/2 NW 1/4 SE 1/4 LESS 1.00 A RD SEC 3-80-23 (GEOPARCEL # 8023-03-400-002); and
S 1/2 SW 1/4 LESS 3.0A RD SEC 3-80-23 (GEOPARCEL # 8023-03-300-003); and
EX S 533F N 1133F W 327F- N 1/2 SW 1/4 LESS RD SEC 3-80-23 (GEOPARCEL # 8023-03-300-002); and
S 533F N 1133F W 327F N 1/2 SW 1/4 LESS RD SEC 3-80-23 (GEOPARCEL # 8023-03-300-001); and
S 1/2 SE 1/4 LYG E OF RY LESS 1A RD SEC 4-80-23 (GEOPARCEL # 8023-04-400-004); and
N 1/2 SE 1/4 LYG E OF RY LESS 1A RD SEC 4-80-23 (GEOPARCEL # 8023-04-400-002); and
S 1/2 SE 1/4 LYG W OF RY SEC 4-80-23 (GEOPARCEL # 8023-04-400-003); and
N 1/2 SE 1/4 LYG W OF RY SEC 4-80-23 (GEOPARCEL # 8023-04-400-001); and
NE 1/4 SW 1/4 & S 1/2 SW 1/4 LESS 1.364 A RD SEC 4-80-23 (GEOPARCEL # 8023-04-300-003); and
S 33A NW 1/4 SW 1/4 LESS 1.125A RD SEC 4-80-23 (GEOPARCEL # 8023-04-300-002); and
EX S 33A- NW 1/4 SW 1/4 LESS .239A RD SEC 4-80-23 (GEOPARCEL # 8023-04-300-001); and
EX PARCEL A BK 13218 PG 439 BEG SW COR THN N 423F SE 558.2F S 423F NW 558.2F TO POB- SW 1/4 NW FRL 1/4 LESS .68A RD EAS SEC 3-80-23 (GEOPARCEL # 8023-03-100-004); and
PARCEL A BK 13218 PG 439 BEG SW COR THN N 423F SE 558.2F S423F NW558.2F TO POB SW 1/4 NW FRL 1/4 LESS .32A RD EAS SEC 3-80-23 (GEOPARCEL # 8023-03-100-005); and
EX E FRL 1/2- N FRL 1/2 NW FRL 1/4 LESS 2.25 A ROAD SEC 3-80-23 (GEOPARCEL # 8023-03-100-001); and
S 1/2 NE FRL 1/4 LYG E OF RY LESS 1A RD SEC 4-80-23 (GEOPARCEL # 8023-04-200-004); and
E 1/2 N 1/2 NE FRL 1/4 LESS 2.477 A RD & 4 A RY SEC 4-80-23 (GEOPARCEL # 8023-04-200-002); and
SW 1/4 NE FRL 1/4 LYG W OF RY SEC 4-80-23 (GEOPARCEL # 8023-04-200-003); and
W 1/2 N 1/2 NE FRL 1/4 LESS .983 A RD SEC 4-80-23 (GEOPARCEL # 8023-04-200-001); and
EX NW 1/4 SW 1/4 NW 1/4-S 1/2 NW 1/4 LESS .50 A RD SEC 4-80-23 (GEOPARCEL # 8023-04-100-005); and
EX BEG 642.96F E OF NW COR THN E 425.21F S307.89F W303.24F N79.7F W121.97F N228.19F TOPOB- N 113.72A NW FRL 1/4 SEC 4-80-23 (GEOPARCEL # 8023-04-100-002); and
EX S 256 F E 125 F W 170 F- NW 1/4 SW 1/4 NW FRL 1/4 LESS .68 A SEC 4-80-23 (GEOPARCEL # 8023-04-100-003); and
S 256 F E 125 F W 170 F NW 1/4 SW 1/4 NW FRL 1/4 SEC 4-80-23 (GEOPARCEL # 8023-04-100-004); and
BEG 642.96F E OF NW COR THN E 425.21F S307.89F W303.24F N79.7F W121.97F N 228.19F TO POB NW 1/4 LESS .323A RD EAS SEC 4-80-23 (GEOPARCEL # 8023-04-100-001)
B. The owner of any parcel included within the Deer Creek Trunk Sewer Connection District 2 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre-1 acre minimum) |
Prior to and through December 31, 2020 | $4,589 |
January 1, 2021 | $4,652 |
January 1, 2022 | $4,715 |
January 1, 2023 | $4,778 |
January 1, 2024 | $4,840 |
January 1, 2025 | $4,903 |
January 1, 2026 and thereafter | To be re-evaluated |
(Ord. 2036 - Dec. 20 Supp.)
20. Fourmile Creek Trunk Sewer Connection District 2.
A. Fourmile Creek Trunk Sewer Connection District 2 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Municipal Utilities:
W1/2 SE1/4 LESS 1.82A RD SEC 25-81-24 (GEOPARCEL # 8124-25-400-001); and
EX E 45F & W 25F E 70F N 549.2F S1413.4F- & -EX BEG 864.2F N OF SE COR THN W 609.8 S 396.4F W703F S431.8F W TO W LN- E 1/2 SE 1/4 SEC 25-81-24 (GEOPARCEL # 8124-25-400-002); and
EX E 45F & W 25F E 70F N 650.8F S 864.2F- BEG 41.3F N OF SE COR THN N 822.9F W609.8F S396.4F W 703F S 406.8F E 721F S 25F E 585.9F TO POB SE 1/4 SEC 25-81-24 (GEOPARCEL # 8124-25-400-003); and
BEG SW CORNER SW FRL 1/4 THN N 511.07F E 45F NE 127.82F E 191.63F S 602.41F W 327.36F TO POB SW FRL 1/4 LESS RD SEC 30-81-23 (GEOPARCEL # 8123-30-300-006); and
EX BEG SW CORNER SW FRL 1/4 THN N 511.07F E 45F NE 127.82F E 191.63F S 602.41F W 327.36F TO POB- & -EX S640.5F E591F- BEG SW COR THN E 1622.95F N 645F W 1373F NELY 245F NWLY 484.93F W45F TO W LN S 1195.44F TO POB W FRL 1/2 SW FRL 1/4 SEC 30-81-23 (GEOPARCEL # 8123-30-300-007); and
EX RD- & -EX S 200F E 320F- S 640.5F E 591F W FRL 1/2 SW FRL 1/4 SEC 30-81-23 (GEOPARCEL # 8123-30-300-004); and
S 200F E 320F SW FRL 1/4 SW FRL 1/4 LESS RD SEC 30-81-23 (GEOPARCEL # 8123-30-300-005); and
EX E 1430F- & -EX W127F E 1557F N 637F- & -EX W 165F E 1722F N 264F- & -EX W 264F E 2312F N 330F- N 3/4 NE 1/4 LESS RD SEC 36-81-24 (GEOPARCEL # 8124-36-201-004); and
W 264F E 2312F N 330F N 3/4 NE 1/4 LESS RD SEC 36-81-24 (GEOPARCEL # 8124-36-201-001); and
COMM PT 1557F W OF NE COR SEC 36 THN S 264F W 165F N 264F E 165F TO BEG N 3/4 NE 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-201-002); and
W 150F E 1557F N 637F N 3/4 NE 1/4 LESS RD SEC 36-81-24 (GEOPARCEL # 8124-36-201-003); and
W 312F E 1407F N 637F N 3/4 NE 1/4 LESS RD SEC 36-81-24 (GEOPARCEL # 8124-36-226-001); and
EX N OF LN BEG 72.87F S OF NW COR THN E242F N25F E TO E LN- W 413F E1095F N 637F NE 1/4 LESS RD SEC 36-81-24 (GEOPARCEL # 8124-36-226-002); and
EX PARCEL 2018-191 BK 17102 PG 203- & -EX ABUHL ACRES & W 748F N 637F & BEG NE COR THN W 300F SE 424.26F N 300F TO POB- E 1430F N 3/4 NE 1/4 LESS 1.415A RD SEC 36-81-24 (GEOPARCEL # 8124-36-226-005); and
PARCEL 2020-13 BK 17821 PG 958 BEG NE COR ADUHL ACRES THN W 317F S 150F W 225F N 225F E 542F S 75F TO POB BNG PRT PARCEL 2018-191 BK 17102 PG 203 SUBJ .057A RD EAS NE 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-276-011); and
LOT 3 ABUHL ACRES (GEOPARCEL # 8124-36-276-008); and
PARCEL 2020-12 BK 17821 PG 958 COM NE COR ADUHL ACRES THN W 317F S 150F TO POB THN S 150F W 225F N 150F E 225F TO POB BNG PRT PARCEL 2018-191 BK 17102 PG 203 NE 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-276-012); and
LT 2 ABUHL ACRES (GEOPARCEL # 8124-36-276-002); and
EX PARCEL 2020-9 BK 17821 PG 958- LOT 1 ABUHL ACRES & PARCEL 2020-11 BK 17821 PG 958 COM NE COR ADUHL ACRES THN W 317F S 300F TO POB THN S 140F W 225F N 140F E 225F TO POB BNG PRT PARCEL 2018-191 BK 17102 PG 203 NE 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-276-017); and
PARCEL 2020-9 BK 17821 PG 958 BEG SW COR THN N 10F E 109F S 10F W 109F TO POB LOT 1 ABUHL ACRES (GEOPARCEL # 8124-36-276-016); and
EX PARCEL 2018-191 BK 17102 PG 203- & -EX PARCEL A BEG 345.32F N OF SE COR THN W 208F N 320F E 208F S 320F TO POB- S 1/4 NE 1/4 LESS 0.224A RD SEC 36-81-24 (GEOPARCEL # 8124-36-251-002); and
PARCEL 2020-10 BK 17821 PG 958 COM NE COR ADUHL ACRES THN W 317F S 440F TO POB THN S 10F E 109F S 320F E 208F S 50F W 542F N 380F E 225F TO POB BNG PRT PARCEL 2018-191 BK 17102 PG 203 SUBJ .038A RD EAS NE 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-276-015); and
PARCEL A BEG 345.32F N OF SE COR THN W 208F N 320F E 208F S 320F TO POB S 1/4 NE 1/4 LESS .24A RD EAS SEC 36-81-24 (GEOPARCEL # 8124-36-276-007); and
EX S & W OF A LN BEG 1622.95F E OF SW COR THN N 645F W 1373F NELY 245F NWLY 484.93F W 45F TO W LN & 16.3A I 35- SW FRL 1/4 LESS 1A RD SEC 30-81-23 (GEOPARCEL # 8123-30-300-001); and
EX KIMBERLEY ESTATES PLAT 1- N 1/2 SE 1/4 LESS 1A RD SEC 36-81-24 (GEOPARCEL # 8124-36-400-012)
B. The owner of any parcel included within the Fourmile Creek Trunk Sewer Connection District 2 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre - 1 acre minimum) |
Prior to and through December 31, 2021 | $1,015 |
January 1, 2022 | $1,029 |
January 1, 2023 | $1,043 |
January 1, 2024 | $1,057 |
January 1, 2025 | $1,071 |
January 1, 2026 and thereafter | To be re-evaluated |
(Ord. 2055 - Jun. 21 Supp.)
21. Rock Creek Trunk Sewer Connection District 4.
A. Rock Creek Trunk Sewer Connection District 4means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Municipal Utilities:
SW 1/4 NW 1/4 LESS 1A RD SEC 8-80-24 (GEOPARCEL # 8024-08-100-002); and
SE 1/4 NW 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-100-003); and
EX BEG 1800F N SW COR SW 1/4 E 75F S 100F W 75F N 100F TO POB- N 1/2 SW 1/4 LESS RD SEC 8-80-24 (GEOPARCEL # 8024-08-300-001); and
NW 1/4 SE 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-400-001); and
SW 1/4 SE 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-400-005); and
S 1/2 NE 1/4 SE 1/4 & SE 1/4 SE 1/4 -EX PARCEL 2019-236 BK 17573 PG 282- & -EX PARCEL A BK 10865 PG 248- & -EX BEG SW COR SE 1/4 SE 1/4 SEC 8 THN N 50F E 439.83F SELY ALNG CRV 215.72F S 31.43F W 654.51F TO POB- SEC 8-80-24 (GEOPARCEL # 8024-08-400-014); and
EX BEG SE COR SEC THN W 248.05F N 23.65F NELY ALNG CRV 29.24F NELY ALNG CRV 219.43F E 1.05F S 50F TO POB- PARCEL 2019-236 BK 17573 PG 282 BEG SE COR SEC 8 THN W 248F N 352F W 410F W 106.5F NW 254.01F N 1039.1F E 934F S 268F S 1325.92F TO POB LESS 0.23A RD E 1/2 SE 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-400-013); and
PARCEL A BK 10865 PG 248 BEG 248F W OF SE COR THN W410F N352F E410F S 352F TO POB SE 1/4 SE 1/4 LESS .31A RD SEC 8-80-24 (GEOPARCEL # 8024-08-400-010); and
-EX E 33F & S33F RD EAS- & -EX BEG SW COR SEC 9 THN N 50F E 1249.9F NELY 39.02F N 1245.74F E 40F TO NE COR SW 1/4 SW 1/4 S 1320.34F W 1314.69F TO POB- SW 1/4 SW 1/4 SEC 9-80-24 (GEOPARCEL # 8024-09-300-013); and
S 1/2 SE 1/4 NE 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-200-006); and
N 1/2 NE 1/4 SE 1/4 SEC 8-80-24 (GEOPARCEL # 8024-08-400-002)
B. The owner of any parcel included within the Rock Creek Trunk Sewer Connection District 4 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre - 1 acre minimum) |
Prior to and through December 31, 2021 | $4,134 |
January 1, 2022 | $4,161 |
January 1, 2023 | $4,187 |
January 1, 2024 | $4,214 |
January 1, 2025 | $4,241 |
January 1, 2026 and thereafter | To be re-evaluated
|
(Ord. 2069 - Oct. 21 Supp.)
22. Fourmile Creek Trunk Sewer Connection District 3.
A. Fourmile Creek Trunk Sewer Connection District 3 means and includes only the following described real estate and as shown on an exhibit on file in the office of the Director of Municipal Utilities:
EX W 446F N 846F- & -EX COM NW COR THN E 446.10F ALNG N LN TO POB THN E 874F S 233.05F W 873.82F N 233.05F TO POB- NW 1/4 NW 1/4 LESS .64A RD SEC 25-81-24 (GEOPARCEL # 8124-25-100-013); and
N 60 A E 1/2 NW 1/4 LESS 1 A RD SEC 25-81-24 (GEOPARCEL # 8124-25-100-003); and
SW1/4 NW1/4 LES 2.27A RD SEC 25-81-24 (GEOPARCEL # 8124-25-100-004); and
EX E 8A- S 1/2 SE 1/4 NW 1/4 SEC 25-81-24 (GEOPARCEL # 8124-25-100-005); and
E 8A S 1/2 SE 1/4 NW 1/4 SEC 25-81-24 (GEOPARCEL # 8124-25-100-006); and
OUTLOT X FOUR MILE FOUR (GEOPARCEL # 8124-25-376-001); and
N & E OF LN BEG 1146.74F N & 75F E OF SW COR THN SE 198F S 240F E 410F S 575.53F E TO E LN NW 1/4 SW 1/4 SEC 25-81-24 (GEOPARCEL # 8124-25-300-001); and
LOT 4 FOUR MILE FOUR (GEOPARCEL # 8124-25-326-001); and
PAR A BK 11516 PG 523 BNG BEG 1860.08F N OF SW COR THN N 606.92F E 75F SE 198F S 240F E 410F S 277.36F SW 502.5F NW 183.43F TO POB SW 1/4 LESS RD SEC 25-81-24 (GEOPARCEL # 8124-25-300-006); and
PRT LOT 1 LYG E PARCELS C & D BK 18760 PG 763 GENE'S PLACE (GEOPARCEL # 8124-25-301-003); and
LOT 1 -EX RD EAS COM SW COR SEC 25 THN N 1219.26F E 65.18F TO POB THN E 28.84F SW 93.65F N 33.71F NE 53.30F TO POB- FOUR MILE FOUR (GEOPARCEL # 8124-25-351-006); and
OUTLOT W -EX RD EAS COM SW COR SEC 25 THN N 1219.26F E 65.18F TO POB THN E 28.84F SW 93.65F N 33.71F NE 53.30F TO POB- FOUR MILE FOUR (GEOPARCEL # 8124-25-351-007); and
OUTLOT Z FOUR MILE FOUR (GEOPARCEL # 8124-25-351-003); and
LOT 2 FOUR MILE FOUR (GEOPARCEL # 8124-25-351-004); and
LOT 3 FOUR MILE FOUR (GEOPARCEL # 8124-25-351-005); and
S 181.5F W 240F SW1/4 SW1/4 LESS RD SEC 25-81-24 (GEOPARCEL # 8124-25-300-003); and
PRT LOT 1 LYG W PARCEL C BK 18760 PG 763 GENE'S PLACE (GEOPARCEL # 8124-25-301-002); and
EX E 75F & S 33F- & -EX RD EAS COM SE COR NE 1/4 SE 1/4 THN N 128.44F W 75F TO POB THN NW 52.39 N 125.40F NE 84.86F S 252F TO POB- & -EX RD EAS COM SE COR SEC 26 THN N 1242.62F W 75F TO POB THN NW 43.17F N 57.01F NE 35.74F S 133F TO POB- E 1/2 SE 1/4 SEC 26-81-24 (GEOPARCEL # 8124-26-400-003); and
W 1/2 SE 1/4 LESS 1 A RD SEC 26-81-24 (GEOPARCEL # 8124-26-400-001); and
NE 1/4 SW 1/4 SEC 26-81-24 (GEOPARCEL # 8124-26-300-003); and
EX COM SW COR SEC 26 THN E 2004.17F TO POB THN N 33F NE 39.57F E 46.1F SE 39.46F S 33F W 97.53F TO POB- SE 1/4 SW 1/4 LESS 0.926A RD SEC 26-81-24 (GEOPARCEL # 8124-26-300-005); and
W1/2 SW 1/4 LESS 2.5A RD SEC 26-81-24 (GEOPARCEL # 8124-26-300-001); and
SE 1/4 SE 1/4 LESS 2 A RD SEC 27-81-24 (GEOPARCEL # 8124-27-400-003); and
NE1/4 SE1/4 LESS 1.5A RD SEC 27-81-24 (GEOPARCEL # 8124-27-400-002); and
PARCEL C BK 15128 PG 632 PRT OF W 1/2 SE 1/4 LESS .16A RD EAS SEC 27-81-24 (GEOPARCEL # 8124-27-400-005); and
EX PARCEL C BK 15128 PG 632- W 1/2 SE 1/4 LESS .84A RD SEC 27-81-24 (GEOPARCEL # 8124-27-400-004); and
LOT 1 -LESS .66 A RD- CHRISTIAN JUON EST (GEOPARCEL # 8124-27-300-003); and
LOT 2 -LESS .34 A RD- CHRISTIAN JUON EST (GEOPARCEL # 8124-27-300-002); and
EX PARCEL E BK 15611 PG 732- & -EX PARCEL D BK 15571 PG 306- PARCEL A BK 9113 PG 504 BEG W 1/4 COR OF SEC THN E ALNG N LN 1322.12F TO NE COR S 2639.33F TO SE COR W 1097.5F N 265.01F W 230.01F TO W LN N 2376.88F TO POB W 1/2 SW 1/4 LESS 2.90 RD EAS SEC 27-81-24 (GEOPARCEL # 8124-27-300-008); and
PARCEL E BK 15611 PG 732 COM SW COR SEC 27 THN N ALNG W LN SW 1/4 597.40F TO POB THN CONT N 497.83F THN E 350F S 497.83F W 350F TO POB W 1/2 SW 1/4 LESS .57 RD EAS SEC 27-81-24 (GEOPARCEL # 8124-27-300-009); and
PARCEL D BK 15571 PG 306 COM SW COR SEC 27 BNG SW COR PARCEL B BK 9113 PG 504 THN N 265.08F TO POB THN CONT N 45F E 281.54F S 310F TO S LN SEC 27 THN W 51.50F TO SE COR PARCEL B THN N 265.02F THN W 230.02F TO POB SW 1/4 SW 1/4 LESS .09A RD EAS SEC 27-81-24 (GEOPARCEL # 8124-27-300-007); and
PARCEL B BK 9113 PG 504 S 265.01F W 230.01F SW 1/4 SW 1/4 LESS .44A RD EAS SEC 27-81-24 (GEOPARCEL # 8124-27-300-005); and
PARCEL C BK 14439 PG 496 BNG PRT LTS 3 & 5 LESS 2.73A RD CHRISTIAN JUON EST (GEOPARCEL # 8124-34-100-008); and
PARCEL A W 230F S 245F N900F LT 3 LESS .281A RD CHRISTIAN JUON EST (GEOPARCEL # 8124-34-100-007); and
OUTLOT X CHRISTIAN JUON ESTATES PLAT 2 (GEOPARCEL # 8124-34-100-010); and
LOT 4 LESS 1.52 A RD & S PT LOT 5 BNG E 443.7 F W 871.8 F S 1326.6 F CHRISTIAN JUON EST (GEOPARCEL # 8124-34-100-005); and
SW 1/4 NE 1/4 SEC 34-81-24 (GEOPARCEL # 8124-34-200-004); and
OUTLOT Y CHRISTIAN JUON ESTATES PLAT 2 (GEOPARCEL # 8124-34-200-008); and
OUTLOT Z CHRISTIAN JUON ESTATES PLAT 3 (GEOPARCEL # 8124-34-200-012); and
LOT 3 CHRISTIAN JUON ESTATES PLAT 2 (GEOPARCEL # 8124-34-200-010); and
OUTLOT Y CHRISTIAN JUON ESTATES PLAT 3 (GEOPARCEL # 8124-34-200-014); and
LOT 1 CHRISTIAN JUON ESTATES PLAT 3 (GEOPARCEL # 8124-34-200-013); and
LOT 1 CHRISTIAN JUON ESTATES PLAT 2 (GEOPARCEL # 8124-34-200-011); and
SE 1/4 NE 1/4 SEC 34-81-24 (GEOPARCEL # 8124-34-200-005); and
100F VAC RR ROW THRU E 1/2 NW 1/4 LESS RD EAS SEC 35-81-24 (GEOPARCEL # 8124-35-100-003); and
LOTS 7 & 8 LESS 1.02 A RD CHRISTIAN JUON EST (GEOPARCEL # 8124-35-100-001); and
EX COM NW COR SEC 35 THN E 2063.02F TO POB THN E 96.86F S 33F SW 39.46F W 45.6F NW 39.46F N 33F TO POB- E 1/2 NW 1/4 LESS 0.927A RD & 5.98 A RY SEC 35-81-24 (GEOPARCEL # 8124-35-100-004); and
LOT 2 ENGELWOOD ACRES (GEOPARCEL # 8124-35-201-003); and
LOT 1 ENGELWOOD ACRES (GEOPARCEL # 8124-35-201-002); and
PARCEL B BEG 460.3F S OF N 1/4 COR OF SEC THN S 522.7F TO NW COR ENGELWOOD ACRES E 60.01F TO E ROW LN NE 6TH ST E 250.04F N 522.7F W 250.04F TO E ROW LN 6TH ST W 60.01F TO POB NE 1/4 LESS .72A RD EAS SEC 35-81-24 (GEOPARCEL # 8124-35-201-005); and
EX PARCEL B BEG 460.3F S OF N 1/4 COR OF SEC THN S 522.7F TO NW COR ENGELWOOD ACRES E 60.01F TO E ROW LN 6TH ST E 250.04F N 522.7F W 250.04F TO E ROW LN 6TH ST W 60.01F TO POB- BEG NW COR THN E 463F S 225F W 112F S 780F W 79.5F N 22F W 271.5F N 983F TO POB NE 1/4 LESS RD SEC 35-81-24 (GEOPARCEL # 8124-35-201-004); and
EX BEG NW COR THN E463F S 225F W 112F S 780F W 79.5F S 407F W 98F S 40F W 173.5F N 1452F TO POB- NE 1/4 LESS RD SEC 35-81-24 (GEOPARCEL # 8124-35-226-001); and
EX COM NW COR SEC 36 THN S 208.25F ON W LN SEC 36 THN E 60.01F TO POB THN E 25F NE 28F N 100F NE 34.33F TO SLY ROW LN NE 126TH AVE THN W 45.01F TO ELY ROW LN US 69 THN S 158.48F TO POB- N 208.25F W 208.25F NW1/4 NW1/4 LESS .57A RD SEC 36-81-24 (GEOPARCEL # 8124-36-100-006); and
W 50F N 115F E 1206.05F NE 1/4 NW 1/4 LESS .038 A RD SEC 36-81-24 (GEOPARCEL # 8124-36-100-003); and
OUTLOT Y FOUR MILE FOUR (GEOPARCEL # 8124-36-126-001); and
OUTLOT Y FOUR MILE FOUR (GEOPARCEL # 8124-36-126-001); and
EX PARCEL 2020-135 BK 18074 PG 32- & -EX N 208.25F W 208.25F- & -EX COM NW COR SEC 36 THN S 208.25F ON W LN NW 1/4 THN E 60.01F TO POB THN E 25F S 358.85F SW 79.06F TO EXISTING ELY ROW LN THN N 433.44F TO POB- W 1/2 NW 1/4 LESS 5.43A RD SEC 36-81-24 (GEOPARCEL # 8124-36-100-008); and
S 1/4 E 1/2 NW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-100-005); and
PARCEL B BK 13599 PG 404 BEG 60F E OF NW COR THN E 743.77F ALNG N LN S 1251.03F TO N ROW LN NE 118TH AV W 748.88F ALNG N ROW LN TO ELY ROW LN US HWY 69 N 281.15F ALNG ELY ROW LN NE 92.2F NE 300.4F NW 302F N 277.86F ALNG ELY ROW LN TO POB SW 1/4 SW 1/4 SEC 36-81-24 (GEOPARCEL # 8124-36-300-004); and
SE 1/4 LESS 6.6A RD & 2.4A RR SEC 35-81-24 (GEOPARCEL # 8124-35-400-001); and
EX N 150F- ABND RAILROAD ROW BNG ELY 60F LYG W & ADJ NE 6TH STREET ROW SW 1/4 SEC 35-81-24 (GEOPARCEL # 8124-35-300-008); and
N 150F ABND RAILROAD ROW BNG ELY 60F LYG W & ADJ NE 6TH STREET ROW SW 1/4 SEC 35-81-24 (GEOPARCEL # 8124-35-300-007); and
PARCEL C BK 10789 PG 213 BEG 60F W OF CNT OF SEC TO W ROW LN NE 6TH ST THN S 150F ALNG W ROW LN W 150F N 150F TO N LN E 150F TO POB NE 1/4 SW 1/4 SEC 35-81-24 (GEOPARCEL # 8124-35-300-005); and
EX E 60F & PARCEL A BK 8437 PG 534 BEG 1634F E OF SW COR THN NLY 528.07F E 430F S 528F TO S LN W 438F TO POB & PARCEL C BK 10789 PG 213 BEG 60F W OF CNT OF SEC TO W ROW LN NE 6TH ST THN S 150F ALNG W ROW LN W 150F N 150F TO N LN E 150F TO POB- SW 1/4 LESS 2.47A RD SEC 35-81-24 (GEOPARCEL # 8124-35-300-004); and
PARCEL A BEG 1634F E OF SW COR THN NLY 528.07F E 430F S 528F TO S LN W 438F TO POB SW 1/4 LESS .33A RD SEC 35-81-24 (GEOPARCEL # 8124-35-300-003); and
E 1/2 SE 1/4 LESS 1 A RD SEC 34-81-24 (GEOPARCEL # 8124-34-400-002); and
W 1/2 SE 1/4 LESS 1.52 A RD SEC 34-81-24 (GEOPARCEL # 8124-34-400-001); and
S 1/2 SW 1/4 LESS 3.515 A ROAD SEC 34-81-24 (GEOPARCEL # 8124-34-300-002); and
N 1/2 SW 1/4 LESS 1.515 A ROAD SEC 34-81-24 (GEOPARCEL # 8124-34-300-001); and
EX PARCEL 2022-7 BK 19156 PG 500- E 1/2 NE FRL 1/4 LESS RD SEC 3-80-24 (GEOPARCEL # 8024-03-200-005); and
PARCEL 2022-7 BK 19156 PG 500 E 1/2 NE FRL 1/4 LESS 0.25A RD SEC 3-80-24 (GEOPARCEL # 8024-03-200-006); and
SW 1/4 NW FRL 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-100-003); and
EX PARCEL 2021-249 BK 19166 PG 562- SE1/4 NW FRL 1/4 LESS RD SEC 2-80-24 (GEOPARCEL # 8024-02-100-007); and
PARCEL 2021-249 BK 19166 PG 562 SE1/4 NW FRL 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-100-008); and
LOT 1 TRIPLE J PARK PLAT 1 (GEOPARCEL # 8024-02-100-006); and
LOT 1 TRIPLE J PARK PLAT 1 (GEOPARCEL # 8024-02-100-006); and
EX PARCELS D & E BEG 610F S & 25F W OF N 1/4 COR OF SEC THN S 200F WLY 235F N 200F ELY 235F TO POB- & -EX TRIPLE J PARK PLAT 1- N 1/2 NW FRL 1/4 LESS RD SEC 2-80-24 (GEOPARCEL # 8024-02-100-005); and
PARCELS D & E BEG 610F S & 25F W OF N 1/4 COR OF SEC THN S 200F WLY 235F N 200F ELY 235F TO POB NE 1/4 NW FRL 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-100-002); and
W 112 F E 172 F S 133 F N 183 F NE FRL 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-200-002); and
EX W 112F E 172F S 133F N 183F & W 616F S 1262F & S 1125F E 1960F- N 1/2 NE FRL 1/4 LESS 3.751A RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-001); and
W 616F S 1262F N1/2 NE FRL 1/4 LESS .96A RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-003); and
N 562.5F S 1125F E 1960F N 1/2 NE FRL 1/4 LESS RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-004); and
E 1960F S 562.2F N 1/2 NE FRL 1/4 LESS RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-005); and
EX S810F- S1/2 NEFRL1/4 LESS 1.09A RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-006); and
S 810F S 1/2 NE FRL 1/4 LESS 1.73A RD SEC 2-80-24 (GEOPARCEL # 8024-02-200-007); and
EX E 1597.2 F S 600 F- LESS 1.92 A RD N 1/2 SE 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-400-001); and
W 60F E 85F N 1/2 SW 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-300-002); and
EX E 85F- N 1/2 SW 1/4 SEC 2-80-24 (GEOPARCEL # 8024-02-300-001)
B. The owner of any parcel included within the Fourmile Creek Trunk Sewer Connection District 3 desiring to make a service connection shall pay a connection fee. Connection fees are hereby established as follows:
Effective Date | Sewer Connection Fee (per acre - 1 acre minimum) |
Prior to and through December 31, 2023 | $5,630 |
January 1, 2024 | $5,783 |
January 1, 2025 | $5,935 |
January 1, 2026 | $6,088 |
January 1, 2027 and thereafter | To be re-evaluated |
(Ord. 2149 - Sep. 23 Supp.)