Loading...
Article 14: Boilers
Article 15: Unfired Pressure Vessels
The minimum clearance and fire protection requirements for unfired pressure vessels shall be the same as required for boilers designed for the same operating temperatures. The construction, maintenance, installation, and operation of unfired pressure vessels shall comply with the applicable requirements of reference standard RS 14-4.
Article 16: Gas Fired Equipment
The construction and installation of gas burning equipment shall comply with the applicable requirements of article five of this subchapter and reference standards RS 14-2 and RS 14-6. The installation of gas piping shall be in accordance with the provisions of subchapter sixteen of this chapter, and for the installation of chimneys and gas vents, the provisions of subchapter fifteen of this chapter.
Only accepted natural gas-fired barbecues or grilles that employ an open flame for roasting or broiling and that are located in the interior of buildings, or on the exterior of buildings when against any part of an exterior wall, shall be installed. All provisions for the construction and installation of fireplaces set forth in article 19 of this subchapter shall be complied with in the construction and installation of barbecue grilles.
Article 17: Fuel Oil Equipment
Loading...