Section
General Provisions
52.001 Purpose
52.002 Definitions
52.003 Unlawful deposit
52.004 Private sewage disposal systems
52.005 Construction of sanitary sewer lines
52.006 Tampering with sewage works equipment
52.007 Sewer extensions
Connections
52.020 Connection requirements
52.021 Tap-on and inspection fee
52.022 Notification for inspection
52.023 Compliance with city code and other ordinances
52.024 Costs to be borne by owner
52.025 Separate sewer for each building; old building sewers
52.026 Specifications
52.027 Connection of building sewer onto public sewer
52.028 Applicant to notify inspector when sewer ready for inspection
52.029 Excavations to be guarded
Use of Public Sewers
52.045 Discharge of storm water and unpolluted drainage
52.046 Prohibited discharges
52.047 Grease, oil and sand interceptors
52.048 Admissions subject to review and approval of Control Authority
52.049 Maintenance of preliminary treatment facilities
52.050 Manholes
52.051 Measurements, tests and analyses
52.052 Special agreements
Major Contributors; Noncompatible Pollutants
52.065 through 52.073 Reserved
52.074 Special agreements
Rates and Charges
52.090 Sewage service rate schedule
52.091 Rate adjustment
52.092 Billing procedure; penalty; collections
52.093 Industrial surcharges
Administration and Enforcement
52.105 Bylaws and regulations
52.106 through 52.112 Reserved
52.113 Legal action
52.114 Reserved
52.115 Notice of violation; hearing
52.116 Violator to pay cost of loss or damage
Sewer Use Procedures
Part 1: General Pretreatment Requirements
52.125 Purpose
52.126 Abbreviations
52.127 Definitions
52.128 General discharge prohibitions
52.129 Pretreatment requirements
52.130 Right of rejection
52.131 Special agreements
52.132 Dilution prohibition
52.133 Spill prevention and slug control plans
52.134 Notification
52.135 Employee training
52.136 Records
52.137 Analytical requirements
52.138 Confidential information
52.139 Right of entry, inspection, and sampling
52.140 Search warrants
Part 2: Administration
52.145 Wastewater discharges
52.146 Wastewater contribution permits
Part 3: Wastewater Contribution Permit Requirements
52.155 Permit contents
52.156 Permit duration
52.157 Permit modifications
52.158 Permit revocation
52.159 Permit reissuance
52.160 Permit termination
52.161 Permit transfer
52.162 Monitoring
52.163 Bypass
52.164 Upset provisions
52.165 Wastewater analysis
52.166 Application signatories and certifications
Part 4: Reporting
52.175 Baseline reports (for categorical discharges only)
52.176 Compliance date report
52.177 Periodic compliance reports
52.178 Monitoring and analysis in support of self-monitoring requirements
52.179 Reports of changed conditions
52.180 Reports of potential problems
52.181 Reporting requirements for non-significant industrial users
52.182 Waiver of monitoring requirement
52.183 Hazardous waste notification
52.184 Certification statements
Part 5: Fees
52.190 Fees
Part 6: Enforcement
52.200 Administrative enforcement remedies
52.201 Judicial remedies
Part 7: Severability
52.210 Severability
Part 8: Conflict
52.215 Conflict
Enforcement Response Procedures
52.220 Categories; procedures
52.221 Enforcement response guide
52.222 Time frames for responses
52.223 Staff representative
52.224 Range of enforcement response guide
52.225 Industrial user inventory
52.999 Penalty
App. A Industrial waste pretreatment (IWP) permit application