(a) The following dust prevention regulations, 15 RCNY §§ 13-01 et seq., shall apply to all construction related activities occurring within the city of New York.
(b) Every owner of a building or property where construction related activity occurs shall be responsible for the performance of the construction related activities by his/her agent, contractor, employee, or other representative.
(c) Every contractor and worker engaged in construction related activities shall comply with the provisions of this chapter except as otherwise specified.
(d) The Department may inspect, at a reasonable time and in a reasonable manner, any site where construction related activity is being conducted.
(e) No person shall interfere with or obstruct any employee of the Department in the performance of his/her official duties, including but not limited to the performance of inspections.
Adequately Wetted. "Adequately Wetted" shall mean sufficiently mised or penetrated with liquid to prevent the release of particulate matter. If visible emissions are observed coming from particulate matter, then that material has not been adequately wetted.
Board or ECB. "Board or ECB" shall mean the environmental control board of the city of New York.
City. "City" shall mean the city of New York.
Commissioner. "Commissioner" shall mean the commissioner of environmental protection.
Contractor. "Contractor" shall mean a public authority or any other governmental agency or instrumentality thereof, self-employed person, company, unincorporated association, firm, limited liability corporation, partnership or corporation and any owner or operator thereof, which engages in a construction project or employs persons engaged in a construction project.
Control apparatus. "Control apparatus" shall mean any device which prevents or controls the emission of any air contaminant.
Construction. "Construction" shall mean any or all activity necessary or incidental to the erection, demolition, assembling, altering, installing or equipping of buildings, public or private highways, roads, premises, parks, utility lines including such lines in already-constructed tunnels, or other property, including land clearing, grading, excavating and filling.
Construction Material. "Construction Material" shall mean any material, regardless of composition, designed and customarily used in construction including but not limited to any rails, pillars, columns, beams, bricks, flooring, wall, ceiling, or roofing material, gravel, sand, cement or asphalt.
Controlled Filled Operations. "Controlled Filled Operations" shall mean the use of a dust control apparatus that utilizes an exhaust ventilation system which bags the dust, thereby preventing dust from becoming airborne.
Demolition. "Demolition" shall mean the dismantling or razing of a building, including all operations incidental thereto and any removal of non-structural interior building walls, partitions, finishes, equipment and fittings as would be required for an interior renovation project.
Department or DEP. "Department or DEP" shall mean Department of Environmental Protection.
Disturbed area. "Disturbed area" shall mean an area that has been significantly disrupted by fugitive dust.
Dust. "Dust" shall mean solid particulate matter which has been released into the open air by natural forces or by mechanical processes.
Emission. "Emission" shall mean dispersion of an air contaminant into the open air of the city.
Open air. "Open air" shall mean all the air that is available for human, animal, or plant respiration, but shall not include the air in equipment and private dwellings.
Owner. "Owner" shall mean and includes the owner of a freehold of the premises or lesser estate therein or mortgagee thereof, a lessee or an agent of any of the above persons, a lessee of the equipment or his or her agent, a tenant, operator, or any other person who has regular control of equipment or apparatus.
Person. "Person" shall mean an individual or partnership, company, corporation, association, firm, organization, governmental agency, administration or department, or any other group of individuals, or any officer or employee thereof.
Re-suspension. "Re-suspension" shall mean dust accumulation that once again becomes airborne.
Sandblasting. "Sandblasting" shall mean the use of a high pressure current of air or stream carrying sand, water, or other material for the cleaning or grinding of hard surfaces, including, but not limited to, stone and metal.
Any person who is in violation of or fails to comply with any provision, standard or requirement of these Rules or the terms and conditions of any permit issued pursuant to these Rules shall be subject to the issuance of notice(s) of violation and other civil or criminal enforcement action(s) pursuant to the provisions of Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the city of New York, including but not limited to payment of civil penalties and compliance with orders of the Commissioner and/or ECB.
(a) Provision shall be made at every construction site to control the amount of airborne dust released off site from construction operations, by wetting the construction material as necessary with appropriate spraying agents, provided wetting will not damage utility infrastructure or create any safety hazards. Other means or dust-control apparatus may also be used provided they are acceptable to the Commissioner. Fire hydrants shall not be opened to accomplish this purpose unless a fire hydrant use permit is in effect.
(b) Trucks and other vehicles used to transport particulate matter shall be covered and any particulate matter kept on site shall be sufficiently wetted or stored to prevent particulate matter from becoming airborne.
(c) The wet method of dust control shall include an adequate and continuous supply of water delivered to the construction site under proper pressure and distributed by a hose system and terminating in suitable water sprays or jets at the several points of application, or shall provide the same facilities by means of a self-contained recirculating system. For excavation jobs, a fine mist is deemed to be an adequate supply of water. The application of water shall be done in such a way so as not to create a slipping hazard. Controlled filled operations shall be exempt from this section. When the fill pile is to remain on site and undisturbed overnight or longer, the pile shall be covered with a tarp.
(d) Portable hand water sprinklers or hose sprinklers are acceptable means of wetting for dust control. The water sprays or jets shall be designed to break the water stream into small droplets or otherwise to provide effective wetting.
(e) Suitable drainage means shall be provided for the removal of water and sludge which drains from the operation. When no such drainage is available, the use of access roads and other acceptable methods shall be used.
(a) Prior to the commencement of demolition activities, all exterior surfaces of a building up to six stories in height shall be wetted and shall be maintained adequately wet thereafter while operations continue.
(b) All construction material shall be sufficiently wetted to prevent dust from becoming airborne before loading into trucks, vehicles or other containers. During transport, such material shall be enclosed or covered to prevent dust dispersion.
(c) Wetting shall be used to control dust where drilling, grinding, or other similar construction activities occur.
(d) Sprinklers or other effective means shall be provided to control dust produced at dumps, conveyors, chutes, and other transfer points.
(e) Wherever water sprinklers are used to control dust at transfer points, they shall be capable of being operated by the person(s) responsible for conducting the loading.
(f) Soil or debris piles shall be moistened if dust is being emitted from the piles due to prevailing winds and not from a momentary gust. Adequately secured tarps, plastic or other material may be required by the Commissioner to further reduce dust emissions.