Skip to code content (skip section selection)
Compare to:
New York City Overview
The New York City Charter
The New York City Administrative Code
The Rules of the City of New York
THE RULES OF THE CITY OF NEW YORK
Title 1: Department of Buildings
Title 2: Board of Standards and Appeals
Title 3: Fire Department
Title 6: Department of Consumer and Worker Protection
Title 9: Procurement Policy Board Rules
Title 12: Franchise and Concession Review Committee
Title 15: Department of Environmental Protection
Chapter 1: Asbestos Control Program
Chapter 2: Engineering Criteria for Fossil Fuel Burning Boilers and Water Heaters
Chapter 3: Cessation of Operation and Removal and Sealing of Refuse Burning Equipment
Chapter 4: Certification of Gasoline Dispensing Sites and Transport Vehicles
Chapter 5: Criteria Used For Upgrading Existing Apartment House Incinerators
Chapter 6: Interpolation of Allowable Sound Levels For Motor Vehicles
Chapter 7: Tunneling
Chapter 8: Industrial Equipment
Chapter 9: Gas Fired Burner Installations
Chapter 10: Air Pollution Control Instruction in Fuel Burning Equipment Using Residual Fuel Oil and Refuse Burning Equipment
Chapter 11: Hazardous Substances Emergency Response
Chapter 12: Perchloroethylene Dry Cleaning Facilities
Chapter 13: Rules Pertaining to the Prevention of the Emission of Dust from Construction Related Activities
Chapter 14: Rules Concerning the Use of Ultra Low Sulfur Diesel Fuel and Emissions Control Technology in Nonroad Vehicles Used in City Construction
Chapter 15: Rules Concerning the Use of Ultra Low Sulfur Diesel Fuel and Emission Control Technology on City Motor Vehicles
Chapter 16: NYCDEP Rules for the Recreational Use of City Property*
Chapter 17: [Occupation or Use of New York City Property (Lands, Water Bodies, Reservoirs and Infrastructure) in the Counties of Delaware, Dutchess, Greene, Orange, Putnam, Schoharie, Sullivan, Ulster, and Westchester]
Chapter 18: Protection from Contamination, Degradation and Pollution of the New York City Water Supply and Its Sources
Chapter 19: Use of the Public Sewers
Chapter 19.1: Stormwater Management for Water Pollution Control
Chapter 20: Governing and Restricting the Use and Supply of Water
Chapter 21: Water Shortage Emergency Rules
Chapter 22: Withdrawal of Water from the New York City Water Supply System
Chapter 23: Construction of Private Sewers or Private Drains
Chapter 24: [Contamination of Tax Lot by Hazardous Materials or Hazardous Waste; Placement and Removal of an (E) Designation on Tax Lot in Connection with Zoning Map Amendment]
Chapter 25: Rules Concerning the Use of Emissions Control Technology on Sight-Seeing Buses
Chapter 26: Rules Concerning the Use of Ultra Low Sulfur Diesel Fuel and Emissions Control Technology on Vehicles That Transport Children to and from School
Chapter 27: Rules Concerning the Use of Ultra Low Sulfur Diesel Fuel and Emissions Control Technology On Solid Waste Vehicles
Chapter 28: Citywide Construction Noise Mitigation
Chapter 29: Commercial Music Noise Mitigation Rules
Chapter 30: Minimal Noise Impact Construction Activities
Chapter 31: Rule Governing House / Site Connections to the Sewer System
Chapter 32: Adjudications
Chapter 33: Sale of Tax Liens and Complaint Resolution
Chapter 34: [Air Pollution Control Code Fees]
Chapter 35: Voluntary Master Environmental Hazard Remediation Technician Registration Program
Chapter 36: Cure Period for Certain Air and Noise Code Violations
Chapter 37: Emission Reduction Technologies for Char Broilers
Chapter 38: Emissions Reduction Technologies for New Cook Stoves
Chapter 39: Engine Idling
Chapter 40: Rules Concerning the Registration of Emergency Generators [Repealed]
Chapter 41: Community Right-to-Know Regulations
Chapter 42: City Environmental Quality Review (CEQR) (City Planning and Department of Environmental Protection)
Chapter 43: Air Code Penalty Schedule
Chapter 44: Standard Test Procedures to Determine Smoke Emissions from Generators with an Output of 40 kw or More
Chapter 45: Abatement Orders
Chapter 46: Filming and Photography Authorized by the Department
Chapter 47: Noise Code Penalty Schedule
Chapter 48: Green Infrastructure Grant Program
Chapter 49: Spraying Insulating Material
Chapter 50: Registration of Other Emission Sources or Activities
Chapter 51: [Retrofit Technology in Heavy Duty Trade Waste Hauling Vehicles]
Chapter 52: After Hours Noise Complaints
Chapter 53: Air Asbestos Penalty Schedule
Chapter 54: Community Right-To-Know Law Penalty Schedule
Chapter 55: Stormwater Penalty Schedule
Chapter 56: Sewer Control Rules Penalty Schedule
Chapter 57: Rules Concerning Drilling and Excavation
Chapter 58: Notification of Mold Remediation
Chapter 59: Hazardous Substances Emergency Response Law Penalty Schedule
Chapter 60: Rulemaking Petitions
Chapter 61: Public Hearings Held Pursuant to Administrative Code § 24-110
Chapter 62: Emissions Reduction Technologies for Existing Cook Stoves
Chapter 63: Stationary Engines
Title 16: Department of Sanitation
Title 17: Business Integrity Commission
Title 19: Department of Finance
Title 20: Tax Appeals Tribunal
Title 21: Tax Commission
Title 22: Banking Commission
Title 24: Department of Health and Mental Hygiene
Title 25: Department of Mental Health and Retardation [Repealed]
Title 28: Housing Preservation and Development
Title 29: Loft Board
Title 30: Rent Guidelines Board
Title 31: Mayor's Office of Homelessness and Single Room Occupancy
Title 34: Department of Transportation
Title 35: Taxi and Limousine Commission
Title 38: Police Department
Title 38-A: Civilian Complaint Review Board
Title 39: Department of Correction
Title 40: Board of Correction
Title 41: Department of Juvenile Justice
Title 42: Department of Probation
Title 43: Mayor
Title 44: Comptroller
Title 45: Borough Presidents
Title 46: Law Department
Title 47: Commission on Human Rights
Title 48: Office of Administrative Trials and Hearings (OATH)
Title 49: Department of Records and Information Services
Title 50: Community Assistance Unit
Title 51: City Clerk
Title 52: Campaign Finance Board*
Title 53: Conflicts of Interest Board
Title 55: Department of Citywide Administrative Services
Title 56: Department of Parks and Recreation
Title 57: Art Commission
Title 58: Department of Cultural Affairs
Title 60: Civil Service Commission
Title 61: Office of Collective Bargaining
Title 62: City Planning
Title 63: Landmarks Preservation Commission
Title 66: Department of Small Business Services
Title 67: Department of Information Technology and Telecommunications
Title 68: Human Resources Administration
Title 69: Department of Aging
Title 70: In Rem Foreclosure Release Board
Title 71: Voter Assistance Commission
Title 72: Office of Emergency Management
Title 73: Civic Engagement Commission
Title 74: Community Hiring
Chapter 28: Citywide Construction Noise Mitigation
§ 28-100 General Construction Noise Mitigation Plan.
In accordance with § 24-219 and § 24-220 of the New York City Noise Control Code, every construction site where construction activities take place shall have, conspicuously posted and filed with the Department of Environmental Protection (DEP), a complete and accurate Construction Noise Mitigation Plan, except such sites that will have emergency work completed within three days or less, shall not be required to file the plan. An after hours variance, pursuant to § 24-223 of the Noise Control Code may be applied for if work is not possible during otherwise allowable hours. Such plan must be readily available for inspection at the construction site. The Construction Noise Mitigation Plan Form is available at: http://www.nyc.gov/html/dep/html/noise/construction-noise.shtml.
(Amended City Record 9/18/2018, eff. 10/18/2018)
§ 28-101 Required Noise Mitigation Measures for General Construction.
   a.   The responsible party shall self-certify in its Construction Noise Mitigation Plan that all construction tools and equipment have been maintained so that they operate at normal manufacturer's operating specifications, including at peak loading. Such self-certification shall be indicated on the Construction Noise Mitigation Plan form required by 15 RCNY § 28-100. Upon a DEP inspection of the work site, DEP shall use the noise level guidelines in the Federal Highway Administration Roadway Construction Noise Model User's Guide, Jan. 2006, page 3, located in the Appendix to this chapter, as a means of identifying equipment that may be the cause of a noise complaint. If an individual piece of equipment is identified by DEP as exceeding the level specified in such Guide located in the Appendix to this chapter, upon notification by DEP, the responsible party shall have the option of: (i) performing maintenance to demonstrate a good faith effort, notwithstanding the model year of the equipment, to mitigate the noise by a measurable level acceptable to the Department, (ii) replacing the equipment with equipment that complies with said level, or (iii) filing an Alternative Noise Mitigation Plan pursuant to 15 RCNY § 28-104, within five business days of said inspection. If the responsible party elects to perform maintenance pursuant to option (i), but cannot demonstrate within five business days a reduction in noise by a measurable level acceptable to the Department, such party shall pursue one of the other two options to the satisfaction of the Department. The failure to exercise and complete one of such three options within five business days of said inspection shall be a violation of this rule.
   b.   All construction equipment being operated on site must be equipped with the appropriate manufacturer's noise reduction device(s), including, but not limited to, a manufacturer's muffler (or equivalently rated material) that is free of rust, holes and exhaust leaks.
   c.   The responsible party shall mitigate noise from construction devices with internal combustion engines by ensuring that the engine's housing doors are kept closed, and by using noise-insulating material mounted on the engine housing that does not interfere with the manufacturer's guidelines for engine operation or exhaust. The responsible party shall further reduce noise by operating the device at lower engine speeds during the work to the maximum extent possible.
   d.   Portable compressors, generators, pumps and other such devices shall be covered with noise-insulating fabric to the maximum extent possible that does not interfere with the manufacturer's guidelines for engine operation or exhaust, and shall further reduce noise by operating the device at lower engine speeds during the work to the maximum extent possible.
   e.   Vehicle engine idling on site shall be prevented in accordance with New York City Administrative Code § 24-163.
   f.   Quieter back-up alarms shall be used in pre-2008 model year vehicles when practicable for the job site. 2008 model year or newer vehicles shall be equipped with a quieter back-up warning device in accordance with OSHA standards, as set forth in paragraph 4 of subdivision d of 15 RCNY § 28-102.
   g.   When DOB regulations require a perimeter barrier, or "construction fence," and the site is within 200 feet of a receptor or a receiving property as defined in 15 RCNY § 28-109, perimeter noise barriers shall be fabricated in accordance with the standards set forth in subdivision e of 15 RCNY § 28-107 and lined with material set forth in subdivisions c and e of 15 RCNY § 28-107. Further, the responsible party shall fill in any gaps and holes in adjacent panels of noise barriers with noise attenuation material, so as to maximize the effectiveness of such barriers. Such noise attenuation material shall include noise curtain material, additional plywood, or similar material. When viewing ports are required in the curtain material, they shall be filled in with clear plastic attached to the curtain.
   h.   The contractor shall create and utilize a noise mitigation training program, which shall be implemented for all field-worker supervisory personnel including subcontractor supervisors. Supervisory personnel shall field-train all field workers to minimize construction noise. Such training program shall be developed in consultation with DEP.
   i.   When work is planned near sensitive receptors, including but not limited to facilities such as schools, hospitals, places of worship, and homes for the aging, the responsible party shall cooperate with the facility owner or operator to coordinate the work schedule so as to minimize the noise impact on the facility.
   j.   A DEP inspector may visit a construction site to examine the Noise Mitigation Plan upon receiving a complaint, or as a matter of routine inspection, to ensure that the responsible party is complying with such Plan. A responsible party found not to be complying with such Plan shall be provided a cure period of three business days to correct the condition or to file an Alternative Noise Mitigation Plan under 15 RCNY § 28-104. If the condition is not corrected nor an Alternative Noise Mitigation Plan filed with DEP within three business days, then a Notice of Violation shall be issued against the responsible party. Said violations may be issued on-site or by mail. Notwithstanding the preceding sentences in this subdivision, there shall be no cure period afforded with respect to compliance with 15 RCNY §§ 28-100; 28-101(a), (b), (e), (f), (h); 28-104; 28-105; and 28-106(a), (b), (d) (g) & (i).
   k.   Construction activities may take place during the hours of 7:00 a.m. to 6:00 p.m. on weekdays. At all other times, the permittee shall obtain after-hours authorization, pursuant to 15 RCNY § 28-103.
   l.   Where construction projects are of shorter duration of less than 15 days and within the property line and do not require Department of Buildings (DOB) perimeter barriers ("construction fences"), and where the work site is within 75 feet of a residential receptor, a temporary or portable (i.e. unanchored) noise barrier shall be fabricated in accordance with the specifications in 15 RCNY § 28-108. For long-term street work, defined as 15 days or longer, that is outside the property line and within 75 feet of a residential receptor and where there is a dedicated lane available, a temporary barrier in accordance with the specifications in 15 RCNY § 28-108 shall be required.
   m.   Whenever a responsible party is engaged in sandblasting operations that require a perimeter or other barrier during sandblasting, said barrier shall be lined with noise barrier material as set forth in subdivision e of 15 RCNY § 28-107.
   n.   Responsible parties conducting construction and roadway work that will commence and be completed within a continuous period of no longer than 24 hours or for emergency work that will last no longer than three consecutive days, need not file with DEP a Construction Noise Mitigation Plan. However, the responsible party for such construction work shall not create unreasonable noise. In addition, if the work occurs near or adjacent to a sensitive receptor as defined in 15 RCNY § 28-101(i), then the responsible party shall make modifications including scheduling changes or employing additional noise mitigation methods listed in 15 RCNY §§ 28-102, 28-107, and 28-108. This subdivision shall not apply to construction work that occurs after hours.
   o.   Technical terms in these rules are defined in the Noise Code or in 15 RCNY § 28-109.
(Amended City Record 9/18/2018, eff. 10/18/2018)
Loading...