Section
General Provisions
50.01 Definitions
50.02 Board may adopt bylaws and regulations
50.03 Inspectors; authority
50.04 Additional health requirements
50.05 Tampering with the city's water distribution system
50.06 Unauthorized turning on/off water services
50.07 Jurisdiction of water utility
Water Charges
50.10 Water rates
50.11 Temporary users
50.12 Bulk purchase at waterworks
50.13 Municipal users
50.14 Rate schedule for temporary users and bulk purchases
Billing Procedures
50.20 Billing procedures
50.21 Deferred payment charge
50.22 Discontinuance of service for nonpayment
50.23 Deposits for water service
50.24 Collection of delinquent charges
50.25 Bad check charge
50.26 Capital improvement/depreciation account
Establishing Water Service
50.30 Water connections; fees; permit required
50.31 Owner to bear costs
50.32 Separate water service required for each building
50.33 Use of old building water services
50.34 Notification when water service ready for inspection
50.35 Safety requirements; restoration of pavement
50.36 Connections made contrary to regulations may be removed
50.37 Size, depth, and material required for water service pipe; testing
50.38 Materials required for establishing water services
50.39 Water mains, valves, and other appurtenances constructed in flood hazard area
Complaints and Review
50.50 Complaints and review
50.51 Meter tests requested by customer
Disconnections; Cross-Connection Control and Backflow Prevention
50.60 Voluntary disconnections
50.61 Involuntary disconnections
50.62 Cross-connection control and backflow prevention
50.63 Emergency measures
Additional Provisions
50.70 Service calls and fees
50.99 Penalty; liability